Teledyne EHE 2G-2. Combustion Air Requirements for One-Pipe Installation, 2G-3b. Piping Materials

Page 6

Page 4

conversion can be done quite simply as follows (see Figures 2 and 3):

1.Remove the vent exhaust grille by removing the four screws which retain it. The grille, its gasket, and the screws may be discarded.

2.Place the vent collar gasket on the top of the heater aligning its center hole and screw holes with those in the top of the heater.

3.Place the vent collar over the gasket and fasten it in place with the screws and lockwashers provided. Be sure that all components are properly aligned. Screws must be tightened enough to assure a sealed joint without deforming the vent collar.

2G-2. Combustion Air Requirements for One-Pipe Installation

One-pipe indoor installations must have specific provisions for supply of combustion and ventilation air to the room in which the heater is located. Two air openings must be provided — one near the ceiling and one near the floor. When air is provided directly through an outside wall, each opening must have at least one square inch (6.5 square cm) of area per 4000 BTU/h of heater input. When air is provided indirectly through ducts from the outside, the openings and passages must have at least one square inch of area per 2000 Btu/h of heater input. These requirements are interpreted in Table 2.

 

Required net free area in square inches (sq. cm)

 

for each of 2 openings - one near ceiling and

Model

one near floor

 

 

 

 

 

 

Directly Through an

Through

 

Exterior Wall

Horizontal Ducts

 

 

 

220

55 (355)

110 (710)

 

 

 

350

88 (570)

175 (1130)

 

 

 

Table 2. Required Net Free Area of Openings for Combustion and Ventilation Air.

Note that the numbers indicate the net free area

after allowing for the blockage of grille bars, etc. See applicable local codes and the previously-cited national codes for details. Even though codes may permit it, Teledyne Laars does not recommend installations with only “infiltration” as the means for provision of combustion air.

See Section 2G-3c for vent pipe sizing.

WARNING

Do not store any chemicals, cleaners, or other corrosive material near combustion air openings or in the room. Avoid location of dryer vents in the vicinity of combustion air openings. Failure to prevent corrosive materials from mixing with combustion air can result in reduced heater life and unsafe heater operation.

2G-3. Two-Pipe Installation (Direct Vent)

This section specifies installation requirements for combustion air and vent piping for “two pipe” installations. A two-pipe system provides isolation of the Hi-E2combustion system from the space in which the heater is installed. It has not only a vent pipe, but also a combustion air pipe to provide air directly from the outdoors. Research studies have shown that contaminants which may corrode internal heater parts are typically at much lower levels in outdoor air than in air from indoors.

Figure 4. Connection of combustion air pipe to heater.

2G-3a. Connection of Combustion Air Pipe

A collar for combustion air pipe connection is provided in the heater at the inlet of the filter box. As shown in Figure 4, the combustion air pipe is routed through the side of the heater to the filter box connection. Remove the cover plate from the left side panel to provide access for the air pipe.

2G-3b. Piping Materials

Vent piping must be corrosion resistant because combustion condensate is usually present on its internal surfaces. Only the following materials are acceptable for vent piping:

PVC

Class 100, Class 125 or Schedule 40

CPVC

Schedule 40

29-4C®

Stainless steel venting materials listed for

 

venting of condensing gas-fired appliances.

29-4C®is a trademark of Allegheny Teledyne.

Image 6
Contents Installation Hi-E2 Model EHE Gas-Fired Pool Spa Heater Table of Contents Installation Instructions General Information2E. Outdoor Installation 2B. Heater Assembly and Preparation2D. Installation Clearances Installation at High Elevation2G-1. Preparation of Heater For Indoor Installation 2F. Outdoor Shelter Installation Canada2G. Indoor Installation United States2G-3a. Connection of Combustion Air Pipe 2G-2. Combustion Air Requirements for One-Pipe Installation2G-3. Two-Pipe Installation Direct Vent 2G-3b. Piping MaterialsInstallation 2G-3d. Combustion Air and Vent Pipe2G-3c. Size and Length of Combustion Air and Vent Piping Indoor Vent Connection, Hi-E2 Pool Heater 2G-3e. Room Ventilation 2H. Condensate Disposal2I. Gas Supply and Piping High Elevation 60Hz2J-3. Auxiliary Time Clock Wiring 2J. Electric Wiring2J-1. Electrical Power 2J-2. Bonding2K. Water Piping 2K-1. Reversal of Heater Water Connections2K-3. Connections at Heater 2K-4. Pressure Relief Valve 2K-5. Automatic Chlorinators Chemical Feeders2L. Start-up and Adjustment 2L-1. Normal Operation2L-3. Condensate 2L-5. Adjustment of Water Pressure Switch2L-2. Start-up 2L-4. Gas Pressure2L-6. Water Temperature Rise Operating Instructions3A. Start-Up Procedure 3B. Temperature Controls3C. Lighting and Shutdown 3D. Water Chemistry3F. Swimming Pool Energy Savings Tips 3E. Spa/Hot Tub Safety Rules3D-2d. Testing 3D-2c. Corrosion3G-1. Spring and Fall Operation 3G. Seasonal Care3H. Periodic Inspection 3G-2. WinterizingMaintenance and Service 4A. General3H-2. Professional Inspection 4B. Induced-Draft Combustion System 4C. Heater Components and Their Operation4E. Electrical Trouble Shooting 4E-1 V Electrical Power Supply4D. Combustion Air Filter 4E-2. Control Circuit Trouble Shooting 4E-2a. Transformer4E-2b. Fuse 4E-2e. Water Pressure Switch 4E-2c. Fireman Switch and External Interlocks4E-2d. Limit Switches 4E-2f. Temperature Control4F. Venturi Combustion Flow System 4F-2b. Gas Pressure Offset 4F-2. Venturi System Checkout4F-2a. Unfired Venturi Differential Pressure 4F-2c. Gas Orifice Differential4F-3. Air Flow Investigation 4F-3a. Combustion Air Flow4F-4. Fuel Gas Type and Gas Orifice Size 4G. Combustion Condensate4F-3b. Flow in Heater and Vent 4F-5. High Elevation OperationCapacities and Dimensions 4H. Major Component Service5A. General Information Replacement Parts 6A. Parts ListExploded View of the Hi-E2 Limited Warranty