Teledyne HVC-282 instruction manual Calibration And Troubleshooting Guide, CheckingofTube, Page

Page 10
5.0 CALIBRATION AND TROUBLESHOOTING GUIDE

5.0 CALIBRATION AND TROUBLESHOOTING GUIDE

AllHastingsVacuumGaugesandGaugeTubeshavebeencarefullycheckedandcalibratedatthefactorybeforeshipment. If acalibrationcheckisdesired,themethodsinthefollowingsectionsmayprovehelpful.

5.1 CheckingofTube:

Thesimplestandquickestmethodofcheckingoperationandcalibrationofagaugetubeistokeepanewsparecleangauge tubeonhandasa“standard”. Tocheckoperation,installbothnewandoldgaugetubestogetherinthesameclean,dry vacuumsystem,andpumpuntilasteadypressureisobtained. Plugthegaugeontobothtubesalternatelyandcheck readings. Iftheoldtubereadsahigherpressurethanthenewone,thisindicatesashiftintheoldtubewhichismost probablytheresultoftubecontamination. Calibrationcanpossiblyberestoredbygentlyswishingsolventsuchasacetone, orethylalcoholinthetubeend. Aftercleaning,thoroughlyairdrythetube. (Caution:Donotusehighpressureairjet,asthis willdamagethethermopileanddamagegaugetube.) Ifcalibrationcannotberestoredbythisprocedure,replacetheold tubewithanewgaugetube. Thetwotubescantrackoneanotherwithinclosetolerance,however,varianceofupto2xof accuracyspecificationstatedfortubemaybeseen,orcheckthegaugetubebymethoddescribedinSection5.2.

CAUTION: DonotattempttomeasuretheresistanceofthegaugetubeelementwithaDVMwhileitisunderhardvacuum unlessitsupplieslessthan350mVtoperformmeasurement,ormorethan929mVat15Torr,andnevermorethan1.5Vat ATMbetweenpins2(Black)and8(Red). Agoodtubewillreadaround25-30ohms. Ifopenordamaged,thermocouples willreadmuchhigher.

5.2 Calibration

AllHVC-282VacuumGaugeshavebeencarefullycheckedandcalibrated,alongwithDV-273GaugeTubeswhichare independentlymatchedforinterchangeability. Ifforsomereasonyouneedtocalibrateeithergaugeorgaugetube,please carefullyfollowcalibratinginstructionsbelow.

DV-273calibration. WedonotrecommendrecalibrationoftheDV-273gaugetubebecauseofequipmentrequirements,but wedoincludeasuitablemethodforyourreference. BestpossibleaccuracywillrequireaPrimaryStandardandpump systemwiththeabilityofpumpingdowntoatleast1mTorrorbetter. PleaserefertoFigure2.1.

NOTE: Forbestpossibleresults,temperaturechangesmustbeminimized,i.e.;handlingmustbeminimized. (SeeSec.3.2)

PleasereadSection3.2.

a)Apply 350mVDC ±50V to pins (+)8 & (-)2.

b)Pumpsystem/gaugetubedowntohardvacuum,<1mTorr.

c)UsingaDVMwitha200mVorbetterscale,connectedto(+)4&(-)6andadjustcenterpotin gaugetubeto0.000mV±5V.

d)Bringsystem/gaugetubeto15.000±1mTorr.

e)Increaseapplied350mVto929.85mV±50(V. CAUTION:Possiblegaugetubedamagewill result if at less than 15Torr.

PAGE 10

Image 10
Contents MODEL HVC-282 VACUUM CONTROLLER INSTRUCTIONMANUAL Manual Print History TABLE OF CONTENTS PAGE 1.1 Description 1.3 Specifications1.0 GENERAL INFORMATION 1.2 OperatingPrinciple1.4 Accessories 2.2 GaugeTubeCables 2.0GAUGE TUBE AND CABLES2.1GaugeTubes FIG.2.13.2 GaugeTubeInstallation 3.0INSTALLATION3.1PanelMounting 4.0 OPERATION 5.2 Calibration 5.0 CALIBRATION AND TROUBLESHOOTING GUIDE5.1 CheckingofTube PAGE5.3Check Against Primary Standard 6.2 Outgassing 6.0NOTES ON VACUUM MEASUREMENT6.1Effects of Condensable Vapors 6.3 Effect of Thermal Conductivity7.1 Warranty Repair Policy 7.0 SERVICE INFORMATION7.2 Non-WarrantyRepair Policy PAGE 7.3ServiceForm PAGE 8.0 DRAWINGS and DIAGRAMS PAGEPAGE PAGE PAGE PAGE PAGE PAGE PAGE PAGE PAGE