Vanguard Managed Solutions VYS24PWA, VYS30PWA Installing GWMS2 Optional Wall Mounted Switch

Page 11

OWNER’S MANUAL

INSTALLATION

Continued

9.Drill holes at marked locations using 3/16" drill bit.

10.Attach base assembly to fireplace floor using two masonry screws (in hardware package).

INSTALLING GWMS2 (OPTIONAL) WALL MOUNTED SWITCH

Items Included for Installation

Switch

Switch Cover (With Screws)

25 Ft. Wire

CONNECTING TO GAS SUPPLY

WARNING: This appliance re- quires a 1/2" NPT (National Pipe Thread) inlet connection to the pressure regulator.

Flexible Gas Hose (if allowed by local codes)

Fitting

Figure 11 - Attaching Flexible Gas Hose to Heater

Masonry Screw

I

H

I

H

 

O

NO

FF

Mounting

Flanges

Figure 12 - Attaching Base Assembly to Fireplace Floor

Connecting To Log Set

1.Connect one terminal of 25 ft. wire to bottom contact of switch located on heater front control panel (see Figure 13).

2.Connect remaining wire terminal to the “TH” terminal on the control valve (see Figure 13).

3.Route the 25 ft. wire to a convenient location.

WARNING: Do not connect the switch to a power source. Electrical shock and/or fire haz- ard will occur.

IMPORTANT: The wire may be shortened but must not be lengthened.

4.Connect one bare wire end to each of the terminals of the provided wall switch.

5.Install the wall switch and cover in the wall.

Switch

AUTO

OFF

ON

One

 

terminal

To Wall

of 25 ft.

Switch

wire

 

To Wall

Switch

Wall Switch

Figure 13 - Connecting Wire Terminals

WARNING: A qualified service person must connect heater to gas supply. Follow all local codes.

CAUTION: Never connect heater directly to the propane/LP supply. This heater requires an external regulator (not supplied). Install the external regulator be- tween the heater and propane/LP supply.

Installation Items Needed

Before installing heater, make sure you have the items listed below.

external regulator (supplied by installer, see above)

piping (check local codes)

sealant (resistant to propane/LP gas)

equipment shutoff valve *

test gauge connection *

sediment trap

tee joint

pipe wrench

*An CSA/AGA design-certified equip- ment shutoff valve with 1/8" NPT tap is an acceptable alternative to test gauge connec- tion. Purchase the optional CSA/AGA de- sign-certified equipment shutoff valve from your dealer. See Accessories, page 24.

The installer must supply an external regu- lator. The external regulator will reduce incoming gas pressure. You must reduce incoming gas pressure to between 11 and 14 inches of water. If you do not reduce incom- ing gas pressure, heater regulator damage could occur. Install external regulator with the vent pointing down as shown in Figure 14, page 12. Pointing the vent down protects it from freezing rain or sleet.

Continued

105190

11

Image 11
Contents Save this manual for future reference OWNER’S Operation and Installation ManualWhat to do if YOU Smell GAS Vanguard Unvented PROPANE/LP GAS LOG Heater Safety InformationTo P Confined and Unconfined Space AIR for Combustion and VentilationProviding Adequate Ventilation Unusually Tight ConstructionDetermining if You Have a Confined or Unconfined Space AIR for Combustion VentilationDetermining FRESH-AIR Flow for Heater Location Ventilation Air From Outdoors Ventilation AIRVentilation Air From Inside BuildingMinimum Fireplace Clearance to Combustible Materials InstallationInstallation Check GAS TypeMaterial Clearances Minimum NoncombustibleFloor Clearances Mantel ClearancesArea of Various Standard Round Flues Installing Damper Clamp Accessory for Vented OperationInstalling Heater Base Assembly Installation Items NeededConnecting To Log Set Installing GWMS2 Optional Wall Mounted SwitchConnecting to GAS Supply Items Included for InstallationChecking GAS Connections Pressure Testing Gas Supply Piping SystemPressure Testing Heater Gas Connections Installing LogsLighting Instructions For Your Safety Read Before LightingOperating Heater Optional Remote Operation Manual Lighting ProcedureTo Turn OFF GAS To Appliance Main Burner Inspecting BurnersPilot Flame Pattern Burner Primary AIR HolesObserved Problem Possible Cause TroubleshootingObserved Problem Possible Cause Remedy Gas leak. See Warning statement at Service Hints Wiring DiagramSpecifications Replacement PartsLogs Cleaning and MaintenanceCleaning Burner Injector Holder and Pilot AIR Inlet Hole Vintage OAK LOG Models VYS18PWA, VYS24PWA VYS30PWA Illustrated Parts BreakdownVintage OAK LOG Models VYS18PWA, VYS24PWA, VYS30PWA Parts ListAccessories 105190 Warranty Information

VYS30PWA, VYS24PWA specifications

Vanguard Managed Solutions, particularly the VYS30PWA and VYS24PWA models, represent advanced innovations in the field of managed solutions. These models cater to diverse industries, providing scalable and efficient operational frameworks.

The VYS30PWA model is characterized by its robust performance and adaptability. It is designed to handle complex workloads with ease, making it suitable for environments where efficiency and reliability are paramount. The backbone of this unit is its high-capacity processing power, which allows it to support multiple simultaneous operations without significant lag. This is particularly beneficial for organizations that require real-time data processing and analytics capabilities.

On the other hand, the VYS24PWA model offers a more compact solution without compromising on performance. This model is ideal for smaller enterprises or specific project setups where space is limited but functionality cannot be sacrificed. It ensures optimal resource usage while maintaining high-speed connectivity and data flow. Its design enables seamless integration with existing systems, reducing the need for extensive modifications.

Both models incorporate cutting-edge technologies such as cloud integration and advanced analytics. The cloud capability allows users to leverage a flexible workspace, where data and applications can be accessed from any location, fostering remote collaboration and improving productivity. Furthermore, by utilizing cloud-based analytics, organizations can gain actionable insights into their operations, driving informed decision-making.

Security is also a top priority for Vanguard Managed Solutions. Both the VYS30PWA and VYS24PWA feature advanced encryption protocols and are equipped with state-of-the-art security measures to safeguard sensitive information. This focus on security ensures that businesses can operate with peace of mind in an increasingly digital landscape.

In terms of characteristics, both models are built with user-friendliness in mind. Their interfaces are designed to facilitate easy navigation, ensuring that employees can quickly adapt and utilize the systems effectively. Additionally, support and maintenance options are built into the package, allowing organizations to benefit from ongoing assistance as needed.

Overall, Vanguard Managed Solutions VYS30PWA and VYS24PWA are tailored to meet the evolving needs of modern businesses. With a combination of power, versatility, and security, they stand out as essential tools for organizations looking to streamline their operations and enhance overall productivity.