Heat & Glo LifeStyle WS-250 Installation Using Masonry Or Brick Chimney, Supports AS a Thimble

Page 11

INSTALLATION USING MASONRY

OR BRICK CHIMNEY

 

 

 

spacer to the chimney side of the frame. Then insert

 

 

 

 

 

 

Minimum 3 ½" (89mm) [4" (102mm) nominal] thick

the frame into the opening, toe-nailing it to the wall

studs. Install the wall band in the framing to secure

solid bricks are to be used. The fire clay liner (ASTM

the chimney section in place. Insert a single section

C35 or equivalent), 5/8" (16mm) wall thickness, must

of chimney connector into the chimney through the

not penetrate into the chimney beyond the inner

wall band, being sure it does not protrude into the

surface of the chimney flue liner and must be firmly

chimney beyond the edge of the chimney flue lining.

cemented in place. If it is necessary to cut a hole in

 

 

 

the chimney liner, use extreme care to keep it from

Apply high temperature furnace cement to the end of

shattering. Refractory mortar must be used at the

the chimney section and install it over the connector,

junction with the chimney liner. After the assembly is

through the wall band, and through the wall spacer.

complete, insert the chimney connector into the fire

Tighten the wall band to hold the chimney section firmly

clay liner. Do not push it beyond the inside edge of

in place and against the chimney. Install the trim col-

the chimney liner, as this will affect the draw of the

lar on the outside of the opening.

chimney.

 

 

Check to insure there is a 1" (25mm) air space be-

 

 

 

 

B. 6" SOLID PACK CHIMNEY WITH METAL

tween the connector and the chimney section. Also,

during installation, always check to insure that a 2"

SUPPORTS AS A THIMBLE:

 

 

 

 

(50mm) air space is being maintained to the wood

For the method of installation to a masonry chimney

framing. Do not fill this space with insulation. Insula-

shown in Figures 13 and 14 , it will be necessary to

tion in this air space will cause a heat buildup which

purchase a 6" (152mm) inside diameter, 12" (305mm)

may ignite the wood framing.

long section of prefabricated listed solid pack chim-

 

 

 

ney to use as a thimble. Purchase a wall

 

 

 

 

 

spacer, trim collar and wall band that

 

 

 

 

 

are manufactured to fit the chimney

 

 

 

 

 

section you purchase. Cut out a 14 ½"

 

 

 

 

 

(368mm) diameter opening in the wall.

 

 

 

 

 

It may be necessary to cut wall studs

 

 

 

 

 

and install a header and sill frame to

 

 

 

 

 

maintain the wall support. The hole in

 

 

 

 

 

the chimney must have at least a 6"

 

 

 

 

 

(152mm) diameter fire clay liner or

 

 

 

 

 

equivalent, secured with refractory mor-

 

 

 

 

 

tar. If it is necessary to cut a hole in the

 

 

 

 

 

chimney liner, use extreme care to keep

 

 

 

 

 

it from shattering.

 

 

 

 

 

The safety features of this system are

 

 

 

 

 

the 2" (50mm) air space between the

 

 

 

 

 

chimney section and combustible wall

 

 

 

 

 

and the 1" (25mm) air space around the

 

 

 

 

 

chimney connector as it passes through

 

 

 

 

 

the chimney section to the chimney. The

 

 

 

 

 

location of the opening through the wall

 

 

 

 

 

 

 

 

 

 

to the chimney must leave a minimum

 

 

 

 

 

18" (457mm) vertical clearance be-

 

 

 

 

 

 

 

 

 

 

tween the connector pipe and the ceil-

 

 

 

 

 

ing, to prevent the ceiling from catching

 

 

 

 

 

fire when using single wall pipe.

 

 

 

 

 

First, build the frame for the thimble,

 

 

 

 

 

making sure that it is no smaller than

 

 

 

 

 

14½" (368mm) diameter, which will

 

 

 

 

 

maintain a 2" (50mm) air space around

FIGURE 12

 

 

 

the chimney section. Attach the wall

 

 

 

 

 

 

 

 

11

Image 11
Contents Installers Guide For Future Reference Attach Your Sales Receipt Here Table of Contents WS-250 with Pedestal WS-150 with PedestalWS-250 with Legs WS-150 with LegsClearance to Combustibles UL and ULC Clearances to CombustiblesChimney Systems Safety ListingInstallation Materials Needed for Your Safety Venting SystemChimney Chimney ConnectorChimney HEIGHT/DRAFT Connection to a Masonry ChimneyNoncombustible Fire-Stopping Material Thimble Brick Chimney Thimble AssemblySupports AS a Thimble Installation Using Masonry Or Brick ChimneySolid Pack Chimney with Metal Page Connection to a Metal Prefabricated Chimney Door Installation AN Outside AIR KIT is Required for Mobile Home Installation Mobile Home InstallationLEG KIT Installation Tools and Parts Needed Outside AIR KIT InstallationFloor or Wall Installation For Pedestal Models831-1700 Installation of Optional BlowerBlower Switch Adjustments Steps for Adjusting the Blower Speed ControlOperating and Cleaning ASH Removal System InstallationSecondary AIR System Burning ProcessOverfiring Your Stove Voids the WarrantyWood Selection and Storage Building a FireBTU/Hr Primary Secondary Burning GuidelinesBurn Rates Operating TipsMaintenance Door Handle Assembly Glass ReplacementBaffle Removal and Installation Brick Installation Description Part Number AccessoriesService Parts DescriptionHEAT-N-GLO