Heat & Glo LifeStyle WS-150, WS-250 installation instructions Brick Chimney Thimble Assembly

Page 10
FIGURE 11

2. THIMBLE:

An approved thimble must be used when the connection from the stove is made through a combustible wall to a masonry chimney. There are several methods you can use for connection through a combustible wall, two of which are illustrated in this manual. For additional methods, consult local build- ing authorities or use the standards set forth in NFPA 211.

Also, listed prefabricated metal thimbles are available for use with wood stoves. The manufacturer’s in- stallation for the thimbles must be strictly followed to assure the safety of the system. Be sure to maintain the designated clearances to combustible materials.

A. BRICK CHIMNEY THIMBLE

ASSEMBLY:

Construction of the brick thimble as- sembly requires 12" (305mm) of brick around a fire clay liner. Be sure the point of penetration allows an 18"

(457mm) clearance from the connector to the ceil- ing. For a 6" (152mm) chimney connector, an open- ing of 30" (762mm) must be cut in the wall to main- tain the required 12" (305mm) of brick separation from combustibles. It will be necessary to cut wall studs and install a header and sill frame to main- tain proper dimensions and to hold the weight of the brick (Figure 11).

Chimney

Wall

10

Image 10
Contents Installers Guide For Future Reference Attach Your Sales Receipt Here Table of Contents WS-150 with Pedestal WS-250 with PedestalWS-150 with Legs WS-250 with LegsClearances to Combustibles Clearance to Combustibles UL and ULCVenting System Safety ListingInstallation Materials Needed for Your Safety Chimney SystemsConnection to a Masonry Chimney Chimney ConnectorChimney HEIGHT/DRAFT ChimneyNoncombustible Fire-Stopping Material Brick Chimney Thimble Assembly ThimbleSolid Pack Chimney with Metal Installation Using Masonry Or Brick ChimneySupports AS a Thimble Page Connection to a Metal Prefabricated Chimney Door Installation LEG KIT Installation Mobile Home InstallationAN Outside AIR KIT is Required for Mobile Home Installation For Pedestal Models Outside AIR KIT InstallationFloor or Wall Installation Tools and Parts NeededSteps for Adjusting the Blower Speed Control Installation of Optional BlowerBlower Switch Adjustments 831-1700ASH Removal System Installation Operating and CleaningBurning Process Secondary AIR SystemBuilding a Fire Your Stove Voids the WarrantyWood Selection and Storage OverfiringOperating Tips Burning GuidelinesBurn Rates BTU/Hr Primary SecondaryMaintenance Glass Replacement Door Handle AssemblyBaffle Removal and Installation Brick Installation Description AccessoriesService Parts Description Part NumberHEAT-N-GLO