2 – ASSEMBLY AND PRE-OPERATIONAL CHECKS

￿Never charge or fill the unit prior to starting the mixing blades as an overload encountered in starting a loaded unit could damage the engine/motor or drive components.

￿Connect safety chains as instructed when towing the mixer. Connect only to correct hitch or coupler.

￿Keep warning, caution and safety instruction labels clean and in good condition. Replace missing, damaged or illegible labels.

2 – ASSEMBLY AND PRE-OPERATIONAL CHECKS

The only assembly required on this mixer is the installation of the drum tilt handle. Remove the handle from the bag shipped in the drum and install, referring to parts list Figure 5, item numbers 7, 20, 21, 29 And 31 for proper assembly.

The following steps should be taken prior to placing the mixer in use:

1.The operator must be familiar with the location and operation of all controls.

2.Check the crankcase oil level on gasoline powered units, and fill the fuel tank before starting.

3.Check for free rotation of the mixer blade shaft by rotating the drum through one complete dump-charge-dump cycle. Make sure no foreign objects or tools are in drum before starting engine/motor.

4.Start engine/motor, slowly engage the drum drive and check for smooth operation of the mixer blade shaft and drive.

5.Move the clutch lever through several cycles to assure correct clutch operation.