Heat & Glo LifeStyle WS-250, WS-150 Glass Replacement, Door Handle Assembly

Page 23

GLASS REPLACEMENT

1.

Remove door from stove and lay

 

 

 

 

 

 

 

 

 

 

on a padded flat surface.

 

 

 

2.

Remove glass tabs (See figure

 

 

 

 

25) and screws with a Phillips

 

 

 

 

 

 

 

 

screwdriver (turn screws counter-

 

 

 

 

clockwise).

 

 

 

3.

Lift glass frame pieces and glass

 

 

 

 

out of the door frame.

 

 

 

4.

Lay new glass with fiberglass tape

 

 

 

 

around it into the door frame, mak-

 

 

 

 

ing sure the Heat-N-Glo logo reads

 

 

 

 

correctly to the outside.

 

 

 

5.

Place glass frame pieces over the

 

 

 

 

fiberglass tape on the edges of the

 

 

 

 

glass. Be sure glass is centered

 

 

 

 

in the opening (i.e., same space

 

 

 

 

top and bottom, left and right

FIGURE 25

 

 

sides).

 

 

 

 

 

 

 

 

 

 

6.Reinstall screws and glass tabs tight enough to hold glass and frame in place. DO NOT OVER-

TIGHTEN.

7.Check again for centering of glass in door frame, and give all screws a final tightening.

DOOR HANDLE ASSEMBLY

NOTE: Spring handle not included in door handle assembly. When replacing door handle, either use old spring handle or order new spring handle separately (See Figure 26).

FIGURE 26

23

Image 23
Contents Installers Guide For Future Reference Attach Your Sales Receipt Here Table of Contents WS-250 with Pedestal WS-150 with PedestalWS-250 with Legs WS-150 with LegsClearance to Combustibles UL and ULC Clearances to CombustiblesChimney Systems Safety ListingInstallation Materials Needed for Your Safety Venting SystemChimney Chimney ConnectorChimney HEIGHT/DRAFT Connection to a Masonry ChimneyNoncombustible Fire-Stopping Material Thimble Brick Chimney Thimble AssemblySupports AS a Thimble Installation Using Masonry Or Brick ChimneySolid Pack Chimney with Metal Page Connection to a Metal Prefabricated Chimney Door Installation AN Outside AIR KIT is Required for Mobile Home Installation Mobile Home InstallationLEG KIT Installation Tools and Parts Needed Outside AIR KIT InstallationFloor or Wall Installation For Pedestal Models831-1700 Installation of Optional BlowerBlower Switch Adjustments Steps for Adjusting the Blower Speed ControlOperating and Cleaning ASH Removal System InstallationSecondary AIR System Burning ProcessOverfiring Your Stove Voids the WarrantyWood Selection and Storage Building a FireBTU/Hr Primary Secondary Burning GuidelinesBurn Rates Operating TipsMaintenance Door Handle Assembly Glass ReplacementBaffle Removal and Installation Brick Installation Description Part Number AccessoriesService Parts DescriptionHEAT-N-GLO