Empire Comfort Systems BF-30-2 Wall Mount Installation, BF-10 and BF-20 On Sheet Rock Wall

Page 9

WALL MOUNT INSTALLATION

Refer to Figures 6 and 7 for measurements in order to locate (4) mounting holes on wall. Figures 6 and 7 are the front views of the heater.

1.Remove lower louver from casing assembly (2 screws).

2.Remove reflector from casing assembly (2 screws).

3.Remove upper louver from casing assembly (2 screws).

On Solid Wall

1.After locating mounting holes, attach (4) #10 x 1" (25mm) screws provided into the wall. Do not completely tighten screwheads to the wall, leave a 1/8" (3mm) gap between screwheads and wall.

2.Mount heater onto the (4) screwheads and complete tightening screwheads into the wall.

Attention! Use the following steps to properly align the upper louver and the reflector with the heat shield.

a.When replacing upper louver, be sure the bottom lip of upper louver goes behind the heat shield.

b.When replacing reflector, be sure the top lip of reflector goes in front of the heat shield.

3. Connect the gas line.

18” (457mm)

2” 14” (356mm) 2”

(51mm)

(51mm)

 

13/32”

(28mm)

OUTLINE OF

OUTER CASING

187/8”

(479mm)

24 1/8” (613mm)

2”

20 1/8” (511mm)

2”

(51mm)

(51mm)

13/32”

(28mm)

 

 

OUTLINE OF

 

 

OUTER CASING

 

18 7/8”

22”

22”

(479mm)

(559mm)

 

(559mm)

4 1/32”

2 1/32” (52mm)

(102mm) MIN.

2” (51mm) MIN.

 

FLOOR

MOUNTING HOLE LOCATIONS

VIEWED FROM FRONT OF HEATER

BF-10 and BF-20

Figure 6

On Sheet Rock Wall

1.After locating mounting holes, drill (4) 5/16" (8mm) diameter holes into the wall.

2.Insert (4) plastic expansion anchors provided into the holes.

3.Tighten (4) #10 x 1" (25mm) screws provided into the plastic expansion anchors. Do not completely tighten screwheads to the plastic expansion anchors, leave a 1/8" (3mm) gap between screwheads and plastic expansion anchors.

4.Mount heater onto the (4) screwheads and complete tightening the screwheads to the plastic expansion anchors.

Attention! Use the following steps to properly align the upper louver and the reflector with the heat shield.

a.When replacing upper louver, be sure the bottom lip of upper louver goes behind the heat shield.

b.When replacing reflector, be sure the top lip of reflector goes in front of the heat shield.

5.Connect the gas line.

4 1/32”

2 1/32” (52mm)

 

 

 

(102mm) MIN.

2” (51mm) MIN.

 

FLOOR

 

MOUNTING HOLE LOCATIONS

VIEWED FROM FRONT OF HEATER

BF-30

Figure 7

Figure 8

16943-7-0907

Page 9

Image 9
Contents Installation Instructions Table of Contents This is a Heating Appliance Important Safety InformationLP-GAS Warning Odor Safety Information for Users of LP-GASIntroduction Specifications Unusually Tight Construction Water Vapor a BY-PRODUCT of Unvented Room HeatersGAS Supply SRS-18* and SRS-30 Floor Stand Installation Optional Floor Stand InstallationInstallation on Rugs and Tile ClearancesBF-10 and BF-20 On Sheet Rock Wall Wall Mount InstallationLighting Instructions For Your Safety Read Before LightingAir Shutter Adjustment Figure Main Burner Flame CharacteristicsCleaning Main Burner Orifice and Main Burner Piezo Pilot Ignitor InstructionsThermostat Operation Pilot Flame CharacteristicsOxygen Depletion Sensor Pilot Figure BF-10Appliance Maintenance HOW to Order Repair Parts TroubleshootingParts List Parts View Excessive Blower Wheel Noise Optional Blower Installation InstructionsOptional Blower Installation Instructions Service Notes
Related manuals
Manual 20 pages 33.69 Kb