Goodman Mfg AMV8 Meter Time in Minutes and Seconds for Normal Input, GAS AT 0 2,000 Feet Altitude

Page 18

1,000 Btu/ft3 is determined by-

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

WARNING

 

 

 

 

 

 

 

Corrected Input = 90,000 - (6,000 X .04) X (90,000 / 1,000)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Corrected Input = 90,000 - (240 X 90)

 

 

 

 

 

 

POSSIBLE PROPERTY DAMAGE, PERSONAL INJURY OR DEATH MAY OCCUR IF

Corrected Input = 90,000 - 21,600

 

 

 

 

 

 

 

 

 

 

 

 

THE CORRECT CONVERSION KITS ARE NOT INSTALLED. THE APPROPRIATE KITS

Corrected Input = 68,400

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

MUST BE APPLIED TO INSURE SAFE AND PROPER FURNACE OPERATION. ALL

Using the orifices sized as shown in the table for 6,000 feet (#45),

CONVERSIONS MUST BE PERFORMED BY A QUALIFIED INSTALLER OR SERVICE

AGENCY.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

a meter time of 52.6 seconds is measured. The actual firing rate

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

of the furnace is

 

 

 

 

 

 

 

 

 

This unit

is

configured

for

natural gas.

The

appropriate

Input = 1,000 (heating value of the gas) X 3600 (constant) / 52.6

manufacturer’s propane gas conversion kit, must be applied for

(meter time for 1 ft3 of gas)

 

 

 

 

 

 

 

propane gas installations.

Refer to the “Propane Gas and/or

Input = 3,600,000 / 52.6

 

 

 

 

 

 

 

 

High Altitude Installations” section for details.

 

 

 

 

 

 

 

 

 

 

 

 

 

Contact your distributor for a tabular listing of appropriate

Input = 68,400 Btu/h

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

manufacturer’s kits for propane gas and/or high altitude installations.

METER TIME IN MINUTES AND SECONDS FOR NORMAL INPUT

The indicated kits must be used to insure safe and proper furnace

 

RATING OF FURNACES EQUIPPED FOR USE WITH NATURAL

operation.

All conversions must be performed by a qualified

 

 

GAS AT 0 - 2,000 FEET ALTITUDE

 

 

 

installer, or service agency.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

GAS PIPING CONNECTIONS

 

 

 

 

 

 

 

 

 

 

INPUT

METER

HEAT

HEAT

HEAT

HEAT

 

 

 

 

 

 

 

 

 

 

 

 

SIZE

VALUE

VALUE

VALUE

VALUE

 

GENERAL

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Btu/hr

FT3

 

900

1,000

 

1040

1,100

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

MIN. SEC.

MIN.SEC

MIN. SEC.

MIN. SEC.

 

 

 

 

 

 

 

CAUTION

 

 

 

 

 

 

40,000

1

1

21

1

30

1

33

1

39

 

 

 

 

 

 

 

 

 

 

 

 

 

 

10

13

30

15

00

15

36

16

30

 

 

TO AVOID POSSIBLE UNSATISFACTORY OPERATION OR EQUIPMENT DAMAGE

 

60,000

1

0

54

1

00

1

03

1

06

 

 

 

 

10

9

00

10

10

10

24

11

00

 

 

DUE TO UNDERFIRING OF EQUIPMENT, USE THE PROPER SIZE OF

 

 

 

 

NATURAL/PROPANE GAS PIPING NEEDED WHEN RUNNING PIPE FROM THE

 

80,000

1

0

41

0

45

0

47

0

50

 

 

 

 

 

METER/TANK TO THE FURNACE.

 

 

 

 

 

 

 

 

 

 

 

10

6

45

7

30

7

48

8

15

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

100,000

1

0

32

0

36

0

37

0

40

 

When sizing a trunk line, be sure to include all appliances which

 

 

10

5

24

6

00

6

14

6

36

 

will operate simultaneously when sizing a trunk line.

 

 

 

 

 

120,000

1

0

27

0

30

0

31

0

33

 

The gas piping supplying the furnace must be properly sized based

 

 

10

4

30

5

00

5

12

5

30

 

 

 

 

on the gas flow required, specific gravity of the gas, and length of

 

 

 

 

 

 

 

 

 

 

 

 

In Canada, the series and rating plate input for the furnace apply

the run. The gas line installation must comply with local codes, or

in their absence, with the latest edition of the National Fuel Gas

to installations up to 2,000 feet (610m) above sea level. Kit HA-02

Code, NFPA 54/ANSI Z223.1.

 

 

 

 

 

 

 

 

 

for natural and LP gases is required to convert furnaces from

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

elevations of 2,000 to 4,500 feet (610m to 1,370m). Canadian

 

 

 

Natural Gas Capacity of Pipe

 

 

 

 

 

certification applies to the installations of up to 4,500 feet above

 

 

 

In Cubic Feet of Gas Per Hour (CFH)

 

 

 

 

sea level. Installations above 4,500 feet are subject to acceptance

 

Length of

 

 

 

Nominal Black Pipe Size

 

 

 

 

 

Pipe in Feet

1/2"

 

3/4"

 

1"

 

 

1 1/4"

 

1 1/2"

 

by the local authorities having jurisdiction.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

10

 

132

 

278

 

520

 

 

1050

 

1600

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Do not derate the furnace by adjusting the manifold pressure to a

 

20

 

92

 

190

 

350

 

 

730

 

1100

 

 

30

 

73

 

152

 

285

 

 

590

 

980

 

lower pressure than specified on the furnace rating plate. The

 

 

 

 

 

 

 

 

 

40

 

63

 

130

 

245

 

 

500

 

760

 

combination of the lower air density and a lower manifold pressure

 

 

 

 

 

 

 

 

 

50

 

56

 

115

 

215

 

 

440

 

670

 

will prohibit the burner orifice from drawing the proper amount of

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

60

 

50

 

105

 

195

 

 

400

 

610

 

air into the burner.

This may cause incomplete combustion,

 

70

 

46

 

96

 

180

 

 

370

 

560

 

flashback, and possible yellow tipping.

 

 

 

 

 

 

80

 

43

 

90

 

170

 

 

350

 

530

 

In some areas the gas supplier may artificially derate the gas in an

 

90

 

40

 

84

 

160

 

 

320

 

490

 

 

100

 

38

 

79

 

150

 

 

305

 

460

 

effort to compensate for the effects of altitude. If the gas is artificially

(Pressure 0.5 psig or less and pressure drop of 0.3" W.C.; Based on

derated, the appropriate orifice size must be determined based

0.60 Specific Gravity Gas)

upon the BTU/ft3 content of the derated gas and the altitude. Refer

CFH =

BTUH Furnace Input

to the National Fuel Gas Code, NFPA 54/ANSI Z223.1, and

 

 

 

Heating Value of Gas (BTU/Cubic Foot)

 

 

information provided by the gas supplier to determine the proper

To connect the furnace to the building’s gas piping, the installer

orifice size.

 

A different pressure switch may be required at high altitude

must supply a ground joint union, drip leg, manual shutoff valve,

and line and fittings to connect to gas valve. In some cases, the

regardless of the BTU/ft3 content of the fuel used.

Contact your

installer may also need to supply a transition piece from 1/2" pipe

distributor for a tabular listing of appropriate altitude ranges and

to a larger pipe size.

corresponding manufacturer’s pressure switch kits.

 

The following stipulations apply when connecting gas piping. Refer

PROPANE GAS CONVERSION

 

 

to Figure 16 for typical gas line connections to the furnace.

 

 

• Use black iron or steel pipe and fittings for the building piping.

 

 

Use pipe joint compound on male threads only. Pipe joint

 

 

 

compound must be resistant to the action of the fuel used.

 

 

Use ground joint unions.

IO-247A

18

 

12/04

Image 18
Contents Installation & Operating Table of Contents XV. Troubleshooting XII. Start-up Procedure and AdjustmentXIV. Safety Circuit Description XVI. MaintenanceHomeowner Notice II. SafetyTo the Installer To the OwnerIII. Product Application Additional Safety ConsiderationsElectrostatic Discharge ESD Precautions American National Standards InstituteCSA International IV. Location Requirements and ConsiderationsNational Fire Protection Association National Fire Protection Association, IncThermostat Location Thermostat InfluencesFurnace Suspension Existing Furnace RemovalEquipment Located in Unconfined Spaces Combustion and Ventilation AIR RequirementsZ223.1 Section General Space, UnconfinedSpecially Engineered Installations VI. Category I Venting Vertical Venting Louvers and GrillesMinimum Vent Checklist Summary VII. Exterior Masonry Chimneys Category I Furnaces onlyCheck 1 Proper Chimney Termination Check 4 Debris in Cleanout Check 3 Chimney Crown ConditionCheck 5 Liner Condition FIX 1 Liner Termination Check 7 Complete the InstallationCheck 6 Dilution AIR FIX 2 -CHANGE Venting ArrangementsVolt Line Connections Wiring HarnessVIII. Electrical Connections Junction BOX RelocationVolt Thermostat Wiring Single Stage Thermostat ApplicationSINGLE-STAGE Thermostat Application Setting the Heat AnticipatorVolt Dehumidistat Wiring Fossil Fuel ApplicationsIX. GAS Supply and Piping High Altitude DerateAltitude NAT. GAS Orifice Size GAS AT 0 2,000 Feet Altitude Meter Time in Minutes and Seconds for Normal InputRating of Furnaces Equipped for USE with Natural GAS Piping ConnectionsUpflow Installations GAS Piping ChecksPropane GAS Tanks and Piping Propane GAS Piping Charts Circulating AIR and FiltersDuctwork AIR XI. Sequence of Operation Integrated Ignition Control XII. START-UP Procedure and Adjustment White-Rodgers Model 36E54 Connected to ManometerGAS Manifold Pressure Measurement and Adjustment GAS Input Rate Measurement Natural GAS onlyTemperature Rise Circulator Blower Speed AdjustmentAdjust Blower Heat OFF Delay Circulator Blower FAN Timing AdjustmentXIII. Safety Circuit Description XIII. Operational ChecksXV. Troubleshooting XVI. MaintenanceXVII. Before Leaving AN Installation XVIII. Repair and Replacement PartsTroubleshooting Chart Continuously Wiring Diagram Are Subject to Change Without Notice

AMV8 specifications

Goodman Manufacturing has long been recognized as a key player in the HVAC industry, and the Goodman AMV8 stands out as a remarkable addition to their lineup of high-efficiency air conditioning units. Designed with the latest technological advancements, the AMV8 focuses on providing enhanced performance, energy efficiency, and reliability, making it a popular choice among homeowners and contractors alike.

One of the primary features of the Goodman AMV8 is its high SEER (Seasonal Energy Efficiency Ratio) rating, which typically reaches up to 16 SEER. This impressive rating signifies that the unit is capable of delivering substantial energy savings compared to older models. By using less electricity to cool your home, the AMV8 not only impacts utility bills positively but also contributes to reducing your carbon footprint.

The Goodman AMV8 is built with a powerful and efficient scroll compressor, known for its ability to operate quietly while maintaining a smooth and reliable performance. The advanced design minimizes vibration, ensuring a quieter operation, which is particularly appealing for residential settings. Additionally, the unit features a multi-speed ECM blower motor that enhances airflow consistency and operational efficiency.

Construction quality is also noteworthy with the Goodman AMV8. The cabinet is made of durable galvanized steel, coated with a corrosion-resistant finish that protects against rust and weather-related wear and tear. This durability extends the lifespan of the unit and provides assurance of quality to consumers.

Another characteristic that elevates the AMV8 is its integrated comfort control system. This feature allows users to easily manage cooling settings, ensuring optimal comfort throughout the home. The intelligent design of the unit includes a communicator control board, which optimizes system performance and simplifies installation.

The Goodman AMV8 also incorporates environmentally conscious technologies, including the use of R-410A refrigerant. This refrigerant is known for its efficiency and lack of ozone depletion potential, aligning with standards for environmentally friendly HVAC options.

In summary, the Goodman AMV8 is a high-efficiency air conditioning unit that showcases impressive features such as a high SEER rating, a reliable scroll compressor, a durable exterior, and advanced comfort control capabilities. Its commitment to energy efficiency and environmental consideration make it an exemplary choice for those seeking a dependable and cost-effective cooling solution for their homes. Whether for new installations or replacements, the AMV8 stands as a testament to Goodman Manufacturing's dedication to quality and innovation in HVAC technology.