Bryant 350MAV user manual Control Center

Page 10

TWINNING AND/OR

BLOWER OFF-DELAYCOMPONENT TEST

TERMINAL

 

 

Y1DHUM

BLOWER OFF-DELAY

 

 

 

 

 

 

 

90 150

 

120 180

 

 

 

 

(24-VAC 0.5 AMP MAX.)

 

 

 

 

 

 

 

 

 

 

 

HUMIDIFIER TERMINAL

24-V THERMOSTAT

 

G

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

TERMINALS

24V

COM

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

W/W1

 

 

 

 

 

 

 

 

TRANSFORMER 24-VAC

 

 

Y/Y2

TEST/TWIN

PLT

 

 

 

 

CONNECTIONS

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

R

 

HUM

 

 

 

 

 

 

 

 

STATUS

 

0.5 AMP@24VAC

 

 

 

 

 

3-AMP FUSE

FUSE 3-AMP

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

CODE

 

SEC-2 SEC-1

 

 

 

 

 

 

 

LED OPERATION &

 

EAC-2

L2

 

 

 

 

 

 

 

DIAGNOSTIC LIGHT

LED

NUETRAL

 

 

 

 

 

 

 

 

PLT

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

PL1-LOW VOLTAGE MAIN

 

 

 

 

 

 

 

 

 

 

 

115-VAC(L2)NEUTRAL

 

BLW

 

 

 

 

 

 

 

 

HARNESS CONNECTOR

 

 

 

 

 

 

 

 

 

 

CONNECTIONS

 

 

1

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

COOL

 

 

 

 

 

 

 

 

 

 

COOL

 

 

 

 

 

 

 

 

 

 

 

HEAT

HEAT

 

 

 

 

 

 

 

L1

 

 

 

 

 

 

 

FAN

1-AMP@

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SPARE-1 SPARE-2

 

EAC-1 115VAC

PR-1

PL2

1

 

 

 

 

 

 

 

 

 

 

 

 

SPARE-1

 

 

 

 

115 VAC (L1) LINE

PL2-HOT SURFACE

 

SPARE-2

 

FAN

 

BLOWER SPEED

 

 

VOLTAGE CONNECTION

IGNITER & INDUCER

 

 

 

 

 

 

 

 

 

 

MOTOR CONNECTOR

SELECTION TERMINALS

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

EAC-1 TERMINAL

 

 

 

 

 

 

 

 

(115-VAC 1.0 AMP MAX.)

 

 

 

 

 

 

 

 

 

 

 

 

 

A02142

Fig. 12— Control Center

1.LED flashes a current status code, or code 11, 4 times. Record this status code for further troubleshooting.

2.The inducer will start and continue to run until test is over.

3.Hot surface igniter (HSI) is energized for 15 sec, then de-energized.

4.The blower motor operates on HEATING speed for 10 sec, then turns off.

5.The blower motor operates on COOLING speed for 10 sec, then turns off.

6.Blower operates on continuous fan speed, then turns off.

7.Inducer turns off.

8.The gas valve and humidifier terminal HUM are not energized for safety reasons.

32° F MINIMUM INSTALLED AMBIENT OR FREEZE PROTECTION REQUIRED

A93058

Fig. 13—Winterizing the Furnace

—10—

Image 10
Contents Table of Contents Safety ConsiderationsCare and Maintenance Electrostatic Discharge ESD PrecautionsGeneral Cleaning AND/OR Replacing AIR Filter II. Blower Motor and Wheel MaintenanceIII. Cleaning Burners Speed SelectionIV. Cleaning Heat Exchangers Primary Heat ExchangersCleaning Inlet Openings of Primary Heat Exchangers Flushing Collector BOX and Drainage SystemVI. Servicing HOT Surface Igniter Tube RoutingVIII. Checking Heat Tape Operation if Applicable VII. Electrical Controls and WiringIX. Winterizing Wiring Diagram TroubleshootingControl Center Inducer Housing Drain Tube PCB Service Troubleshooting Guide A02204b
Related manuals
Manual 12 pages 42.74 Kb