Step 8. The standard Security Chimneys FTF10 roof flashing assemblies include a storm collar. Slide the storm collar over outer chimney, rest on flashing spacers and align with top surface of flashing. Insert tab in slot, pull tight and bend tab back over slot. Seal storm collar to outer chimney with roof caulking or mastic around entire circumference of pipe. Also add extra roof caulking to the tab/slot area to seal com- pletely against water penetration (Figure 29 ). Check all joints very carefully to ensure no water intrusion can take place.

Step10.UsingaFTF10-CTDRoundTermination:

1.Hold the FTF10-CTD over top of last chimney section (Figure 31 ).

2.Center inner slip section in inner flue pipe- slip down.

CTD

Refer to specific installation instructions in- cluded with FTF10-CT2 chase terminations for clearance and installation details.

Note: It is recommended that all exterior ex- posed metal fireplace components; such as terminations, flashings, storm collars and/or flue be painted with a premium quality, high temperature, rust preventative paint designed for metal. This is especially important when installations are made in abnormally adverse or corrosive environments; such as near lakes, oceans or in areas with consistently high hu- midity conditions. Consult the paint manufac- turers instructions for proper preparation and

Locking Band

Waterproof Caulk

Termination

Figure 31

Chimney

application.

TEN FOOT RULE SUMMARY

The minimum chimney height above the roof and/or to adjacent walls and buildings is speci- fied by all major building codes.

10

Figure 29

Step 9. Security Chimneys locking bands, Model FLB, may be required if the chimney extends too high above the roof flashing. As a general rule, if the chimney extends more than 6' above the roof flashing, the use of locking bands is advisable to strengthen the chimney assembly. Align the locking band at the chim- ney joint. Locking bands wrap around pipe joints equally covering the joints of both pipe sections. Use the nut provided and TIGHTEN snugly. Do not overtighten as this might dam- age the chimney section (refer to Figure 29 ).

Note: If chimney extends more than 8' above roof surface, guy wires are also recommended. Use three (3) guy wires, attach to locking band assembly, extend and secure to roof in a trian- gular pattern (Figure 30 ). Guy wires are not supplied by the manufacturer.

Roof Ridge

120°

Figure 30

3.Center outer locking section over outer flue pipe. Push down until locking tabs are firmly engaged.

4.Pull up slightly on CTD to ensure locking joint has firmly engaged.

Using a FTF10-CTDT Chase Termination:

Refer to specific installation instructions in- cluded with the FTF10-CTDT chase termination for clearance and installation details.

Using a FTF10-CT1 Chase Termination:

Refer to specific installation instructions in- cluded with FTF10-CT1 chase terminations for clearance and installation details.

Using a FTF10-CT2 Chase Termination:

Less Than 10'

3'

Min

Figure 32

NOTE: DIAGRAMS & ILLUSTRATIONS NOT TO SCALE.

If the horizontal distance from the peak of the roof is less then 10', the top of the chimney must be at least 2' above the peak of the roof.

If the horizontal distance from the chimney edge to the peak of the roof is more than 10' a chimney height reference point is established on the roof surface 10' horizontally from the chimney edge. The top of the chimney must be at least 2' above this reference point. In all cases, the chimney cannot be less then 3' above the roof at the edge of the chimney.

The 2' in 10' rule is necessary in the interest of safety but does not ensure smoke-free opera- tion. Trees, buildings, adjoining roof lines, ad- verse wind conditions, etc., may require a taller chimney should the fireplace not draft properly (see Figure 32 ).

2' Min.

10' 3' Min

Image 10
Contents Wood Burning Fireplaces P/N 504,217M REV. E 04/2007 Retain These Instructions For Future ReferenceWH Report No. J20017261-231 Table of Contents Introduction Typical InstallationPrecautions Clearances and Height RequirementsChase Enclosure Assembly OutlineChimney Height Before You StartInstalling the Fireplace Assembly StepsPRE-INSTALLATION Notes ClearancesFront Fireplace SpecificationsBlocking Metal Safety Strips Left SideFraming Specifications Chimney 30 Offset Through Floor Or Ceiling Installing the Chimney System8d Nail Or Equivalent FTF8-S4 Stabilizer Roof Pitch Model Flat to 6/1212 to 12/12 FTF10 Chimney Do Not Seal Flashing Spacers FTF10 FlashingUsing a FTF10-CT2 Chase Termination Using a FTF10-CTDT Chase TerminationUsing a FTF10-CT1 Chase Termination TEN Foot Rule SummarySpecial Offset Instructions Multiple TerminationsOffset Calculations FTF10 Vertical Elevation Chart FTF10 Offset Elevation Chart Installing OffsetsOptional Equipment Considerations Fireplace Finishes Glass DoorsCold Climate Insulation Mantels and TrimUsing the r formula Minimum Value per Inch Hearth Extension DimensionsUsing the k formula Minimum Methods of Determining Hearth Extension and Wall ShieldCalculating Minimum Thickness if Multiple Materials are Used Value = 1/k = r x thickness of material usedFinish to Your Taste Installation ComponentsMin. Distance To Round Termination 63L423 504,217M REV. E 04/2007