Lennox Hearth LA41CF, LA41TCF installation instructions Round Termination 63L423

Page 19

INSTALLATION COMPONENTS

Round Termination

63L423

FTF10-CTD

Firestop Spacer (Flat)

63L36

F10FS-2

Locking Band

63L60

FLB

Storm Collar

63L59

FSC

 

63L16

FTF10-12

 

63L17

FTF10-18

Chimney Section

63L18

FTF10-36

 

 

 

 

63L40

F10F6

Flashing

63L41

F10F12

 

 

 

Chase Termination

 

 

(Square)

63L49

FTF10-CT1

NOTE: DIAGRAMS & ILLUSTRATIONS NOT TO SCALE.

Chase Termination

 

 

(Square)

63L52

FTF10-CT2

Chase Termination

 

 

(Round)

63L46

FTF10-CTDT

Stabilizer

63L26

FTF10-S4

19

Image 19
Contents Wood Burning Fireplaces P/N 504,217M REV. E 04/2007 Retain These Instructions For Future ReferenceWH Report No. J20017261-231 Table of Contents Clearances and Height Requirements Typical InstallationPrecautions IntroductionBefore You Start Assembly OutlineChimney Height Chase EnclosureClearances Assembly StepsPRE-INSTALLATION Notes Installing the FireplaceLeft Side Fireplace SpecificationsBlocking Metal Safety Strips FrontFraming Specifications Chimney 30 Offset Through Floor Or Ceiling Installing the Chimney System8d Nail Or Equivalent FTF10 Chimney Do Not Seal Flashing Spacers FTF10 Flashing Roof Pitch Model Flat to 6/1212 to 12/12 FTF8-S4 StabilizerTEN Foot Rule Summary Using a FTF10-CTDT Chase TerminationUsing a FTF10-CT1 Chase Termination Using a FTF10-CT2 Chase TerminationSpecial Offset Instructions Multiple TerminationsOffset Calculations FTF10 Vertical Elevation Chart Installing Offsets FTF10 Offset Elevation ChartOptional Equipment Considerations Mantels and Trim Glass DoorsCold Climate Insulation Fireplace FinishesMethods of Determining Hearth Extension and Wall Shield Hearth Extension DimensionsUsing the k formula Minimum Using the r formula Minimum Value per InchValue = 1/k = r x thickness of material used Calculating Minimum Thickness if Multiple Materials are UsedFinish to Your Taste Installation ComponentsMin. Distance To Round Termination 63L423 504,217M REV. E 04/2007