State Industries Commercial Gas Water Heater Gas Piping, Venting Through a Roof CONT’D

Page 18

Installing the New Water Heater (cont’d)

VENTING THROUGH A ROOF (CONT’D)

Gas Piping

 

2.Only 3ABS Schedule 40 piping and fittings are acceptable materials on the first five feet of the outlet vent system.

3.3PVC, ABS, or CPVC Schedule 40 piping and fittings are acceptable materials for the inlet vent system and for the out- let vent system after the first five feet.

4.It cannot be connected to existing vent piping or chimney.

5.It must terminate vertically to the outdoors.

6.The total vertical and horizontal vent runs cannot exceed the maximum length with a maximum number of 90˚ elbows as specified in the table below. If more elbows are required, the venting distance must be reduced 5 feet for every 90° elbow.

3DIA. VENTS

NUMBER OF 90˚ DEG.

MAX. LENGTH (FT.)

ELBOWS*

45

1

40

2

35

3

 

 

*NOTE: Two 45˚ elbows are equivalent to one 90˚ elbow. One 90˚ elbow equals 5 feet of equivalent vent length.

TOTAL VERTICAL AND

HORIZONTAL RUNS - SEE

CHART ABOVE (ITEM 6).

WARNING

Make sure the gas supplied is the same type listed on the model rating plate. The inlet gas pressure must not exceed 10.5 in. water column (2.6kPa)for natural gas or 13 in. water column (3.2 kPa) for propane (L.P.) gas. The minimum inlet gas pressure listed on the rating plate is for the purpose of input adjustment.

WARNING

If the gas control valve is subjected to pressure exceed- ing 1/2 pound per square inch (3.5kPa), the damage to the gas control valve could result in a fire or explosion from leaking gas.

WARNING

If the main gas line shutoff serving all gas appliances is used, also turn “OFF” the gas at each appliance. Leave all gas appliances turned “OFF” until the water heater installation is complete.

A gas line of sufficient size must be run to the water heater. Consult the latest edition of National Fuel Gas Code ANSI Z223.1, also referred to as NFPA 54 and the gas company concerning pipe size.

There must be:

—A readily accessible manual shut off valve in the gas sup- ply line serving the water heater, and

—A drip leg (sediment trap) ahead of the gas control valve to help prevent dirt and foreign materials from entering the gas control valve.

—A flexible gas connector or a ground joint union between the shutoff valve and control valve to permit servicing of the unit.

Be sure to check all the gas piping for leaks before lighting the water heater. Use a soapy water solution, not a match or open flame. Rinse off soapy solution and wipe dry.

When installed at elevations above 2,000 feet, input rat- ings should be reduced at the rate of 4 percent for each 1,000 feet above sea level.

WARNING

The appliance and its individual shutoff valve must be disconnected from the gas supply piping system during any pressure testing of that system at test pressures in excess of 1/2 pound per square inch (3.5kPa).

The appliance must be isolated from the gas supply pip- ing system by closing its individual manual shutoff valve during any pressure testing of the gas supply piping sys- tem at test pressures equal to or less than 1/2 pound per square inch (3.5kPa).

18

Image 18
Contents What to do if YOU Smell GAS For Your Safety AN Odorant is Added to the GASUsed by this Water Heater Save this Manual for Future ReferenceGeneral Safety Discharge PipeMust not be plugged or blocked General Safety cont’d DEATH, Serious Bodily INJURY, or Property DamageTable of Contents Preparing for the New Installation IntroductionTypical Installation Locating the New Water Heater Facts to Consider About the LocationILY INJURY, or Property Damage Combustion Air and Exhaust Locating the New Water Heater cont’dFacts to Consider About the Location cont’d Venting Through an Outside Wall ClearancesVenting Through Roof Clearances Wire FenceAir for Ventilation for Appliances Located Confined Spaces 18″Installing the New Water Heater Water PipingInstalling the New Water Heater cont’d Temperature-Pressure Relief ValveWiring Optional Field Installed WiringFilling the Water Heater Wiring Diagram VentingVenting cont’d Venting Through AN Outside WallVent piping can be installed as follows Installing the New Water Heater contdVenting System Example Installations for ALL Models Minimum vent length for all models is 18 inchesPrecautions Cementing PVC, ABS or Cpvc Pipe and FittingsVent Pipe Separation Venting contd Connecting Vent to BlowerTypical installation Venting Through a RoofGas Piping Venting Through a Roof CONT’DGAS Piping with Flexible Connector GAS Piping with ALL Black Iron Pipe to GAS ControlSediment Trap Its hookup? Installation ChecklistBefore Operating the Water Heater Model Rating PlateOperating Before the Water Heater will OperateOperation Operating cont’d Check for LeaksFor Your Safety Read Before Operating Temperature Regulation For Your Information Start Up ConditionsOperational Conditions For Your Information cont’d Operational Conditions cont’dVenting System Inspection Periodic MaintenanceBurner Cleaning Burner InspectionPeriodic Maintenance cont’d Leakage Checkpoints Troubleshooting Thermostat and GAS Supply CheckTroubleshooting cont’d Diagram for Electrical System Check on pages 32Use diagram on Electrical System CheckFrom facing Circulating Tank System GAS/WITH Single Storage System Installation DiagramsTWO Temp Water Heater Installation GAS/INSTANTANEOUS or StoragePrimary Plus Booster Water Heater Installation Installation Diagrams contdWater Heater Installation GAS/INSTANTANEOUS Or StorageRepair Parts ModelRepair Parts cont’d This is a Repair Parts LIST, not a Packing ListPart Description Part Number Page

Commercial Gas Water Heater specifications

State Industries has carved a niche for itself as a leader in the water heating industry, providing reliable solutions for various commercial applications. One of the standout products in their lineup is the State Industries Commercial Gas Water Heater. This powerhouse is designed to meet the demanding hot water needs of businesses, from restaurants and hotels to schools and hospitals.

One of the primary features of the State Commercial Gas Water Heater is its high efficiency. These units are engineered to deliver optimal performance while reducing energy costs. With innovative technologies such as a power vent system and advanced burner design, they maximize heat transfer and minimize heat loss. This efficiency not only translates to lower operating costs but also a reduced environmental impact, making it a smart choice for businesses looking to operate sustainably.

Durability is another hallmark of State Industries' gas water heaters. Constructed from robust materials, these units are designed to withstand the rigors of daily use in a commercial environment. The tanks are often lined with glass and reinforced to prevent corrosion, enhancing the longevity of the unit. Additionally, the use of high-quality components ensures minimal maintenance and reliable operation over time, allowing businesses to focus on their core activities rather than downtime due to equipment failure.

State's Commercial Gas Water Heaters also come equipped with advanced safety features. This includes built-in temperature controls, pressure relief valves, and flame failure protection, which work together to ensure safe operation even in high-demand situations. These features provide peace of mind to operators and help meet stringent safety standards, making them suitable for any commercial setting.

Furthermore, the versatility of these water heaters is remarkable. They are available in various sizes and configurations, allowing businesses to choose a model that perfectly fits their water heating requirements. Whether for high-volume hot water needs or continuous flow applications, State's Commercial Gas Water Heaters are designed to adapt.

In conclusion, the State Industries Commercial Gas Water Heater stands out as a top choice for businesses needing reliable and efficient hot water solutions. With its focus on efficiency, durability, safety, and versatility, this water heater is built to meet the rigorous demands of the commercial market while providing value and peace of mind to operators.