White Rodgers TW2000 owner manual Specifications, Save These Instructions

Page 3

TW2000 WOOD-FIRED BOILER – INSTRUCTION MANUAL

SECTION 1 – OPERATING INSTRUCTIONS

KERR TW2000 Wood-Fired Boiler

Tested by: Warnock Hersey Professional Services Ltd. to CSA standard B366.1

Certified by the Canadian Standards Association (CSA) May 1984 COSP. WWP-009

Manufactured by: Parrsboro Metal Fabricators Ltd. P.O. Box 637, Crossroads 12118 Highway 209 Parrsboro Nova Scotia, Canada B0M 1S0

Specifications

Cabinet

Length

36”

 

Width

22”

 

Height

36”

Shipping Weight

 

600 lb.

Fire Box

Length

36”

 

Width

16”

 

Height

26”

Water Volume

US Gallons

26.10

 

IMP. Gallons

21.73

 

Liters

98.80

Heat Exchanger

 

3/16” & 12-gauge steel

Fire Box Door

Cast Iron

13” x 13”

Supply

 

1 ¼”

Return

 

1 ¼”

Smoke Pipe

 

7” Inside Diameter

Smoke pipe exit

 

Top

Output (max):

 

70,000 Btu/h

Fuel:

 

Wood 30” logs maximum

Boiler Water Volume

26.0 U.S. gal.

Domestic Hot Water Coil

Optional

Electrical Rating:

 

Volts 120, 15Amps

NOTE – Keep this manual in a safe place for future reference. Follow manual carefully for the correct way to install and operate this unit.

CAUTION – Do not fire this unit until operating instructions have been read and fully understood.

INSTALL WOOD-FIRED BOILER ONLY ON A FLUE SYSTEM AND CHIMNEY

THAT ARE IN GOOD CONDITION.

SAVE THESE INSTRUCTIONS

TW2000

2

10/6/05

Image 3
Contents IMPROPER INSTALLATION WILL RESULT IN INSTALLING BOILER OR LIGHTING FIREABOUT YOUR LOCAL FIRE SAFETY REGULATIONS ALL INSTALLATIONS MUST BE MADE INCONTENTS SAVE THESE INSTRUCTIONS SpecificationsTW2000 SECTION 1 - OPERATING INSTRUCTIONS1.1Introduction 1.2Wood-Burning1.3Storage of Wood IN CASE A SERIOUS CREOSOTE FIRE BEGINSCREOSOTE 1.4Maximum Solid-FuelCharge 1.5Maintenance1.5.1Cleaning CLEANING PROCEDUREDISPOSAL OF ASHES 1.6Safety1.7Electrical Power Failure TW200010/6/05 1.8HOMEOWNER CHECKLIST SECTION INSTALLATION INSTRUCTIONS TW200010/6/05 Applicable Standards SECTION 2 - INSTALLATION INSTRUCTIONS2.1Introduction to Installers 2.2Uncrating2.3Locating the Boiler 2.4.1Combustion Air Supply TW200010/6/05 2.4.2Flue Pipe and Chimney TW200010/6/05 a.The appliances are located on the same story 2.6Plumbing Connections 2.5Clearances10/6/05 2.6.1Free Standing2.6.2Parallel TW200010/6/05 2.8Wiring2.7Control System TW20002.9DEALER INSTRUCTIONS TO THE HOMEOWNER BOILER INSPECTION 2.10Installers Final ChecklistWIRING INSPECTION PIPING INSPECTIONParts List For TW TW-2000Parallel Plumbing Wiring Explanation TW-2 Page Page Page Page Page Page Page Page Page Page Page