Heat & Glo LifeStyle PIER-40 owner manual Chase Installations, Construct the Chase

Page 32

9Chase Installations

A. Construct the Chase

A chase is a vertical boxlike structure built to enclose the fireplace and/or its vent system. Vertical chimneys that run on the outside of a building must be installed inside a chase.

Construction of the chase may vary with the type of build- ing. These instructions are not substitutes for the require- ments of local building codes. Local building codes MUST be checked.

A chase should be constructed in the manner of all outside walls of the home to prevent cold air drafting problems. The chase should not break the outside build- ing envelope in any manner. All outer walls need to be insulated.

Building codes require false ceiling and ceiling firestops at each floor of the chase or every 10 ft (3.05 m) of clear space to control spread of fire.

Walls, ceiling, base plate and cantilever floor at the first level of the chase should be insulated. See Figure 9.1. Vapor and air infiltration barriers should be installed in the chase as per regional codes for the rest of the home. Ad- ditionally, Hearth & Home Technologies recommends that the inside surfaces be sheet rocked and taped (or the use of an equivalent method) for maximum air tightness.

Round Termination Cap

 

Metal Chase Top

 

 

Ceiling

 

 

Firestop

 

 

False Ceiling

 

 

Attic

 

Tabs

Insulation

 

Shield

 

 

 

 

Ceiling

Insulation in the

 

Firestop

outside walls

Insulation

Insulation

of the chase

 

False Ceiling

False Ceiling

 

 

Chimney

 

Figure 9.1

Chase Assembly

 

Gas line holes and other openings should be caulked with high temperature caulk or stuffed with unfaced fiberglass insulation. If the fireplace is being installed on a cement slab, we recommend that in cold climates, a sheet of plywood or other raised platform be placed underneath to prevent conducting cold up into the room.

Three examples of chase applications are shown in Fig- ure 9.2.

1.Chimney offset through exterior wall and enclosed in chase.

2.Chase constructed on roof.

12

Figure 9.2 Chase Constructions

Warning! You must install false ceilings and ceiling firestops at each floor of the chase or every 10 ft (3.05 m) to control spread of fire.

Warning! Risk of Fire! Do not seal area between fire stop opening and chimney pipe. Restricting air flow around chimney may cause fire.

Warning! Risk of Fire! You must maintain a minimum 2 in. (51 mm) air space clearance to insulation and other materials surrounding the chimney system.

Insulation and other materials must be firmly secured to prevent accidental contact with chimney system.

The chase must be properly blocked to prevent blown insulation or other combustibles from entering and making contact with fireplace or chimney.

Failure to prevent contact between insulation or other materials and chimney system may cause overheating and fire.

32

Heat & Glo • BAY-40, PIER-40 • 34977 • Rev AB 7/12

Image 32
Contents Fire Risk Hot screen/mesh and glass doors will cause burnsNumber Model Listing Label Information/LocationGrate User Guide Table of ContentsInstaller Guide Warranty Hearth & Home Technologies Inc Limited Lifetime WarrantyWarranty Conditions This warranty is void ifListing and Code Approvals Appliance CertificationNon-Combustible Materials Combustible MaterialsHot glass will cause burns Operating InstructionsYour Fireplace Seasoned Wood Starting a FireGrate FirescreenGlass Doors Outside Air optionalOptional Components Vented Gas Log Sets & Gas Log LightersWood Fuel Maintenance and Service Chimney Inspection/CleaningDisposal of Ashes Creosote Formation and Need for RemovalGlass Cleaning Check Firebox RefractoryInspect Grate Frequency As desiredTroubleshooting Guide Start Fire Problems Possible Cause SolutionGetting Started Typical Fireplace SystemNegative Pressure Design and Installation ConsiderationsDraft Locating Fireplace & Chimney Frequently open doors Central heat outlets or returnsInspect Fireplace and Components Tools and Supplies NeededFireplace System Requirements Framing & Clearances Select Fireplace LocationClearances Air Space ClearancesFrame the Fireplace Sidewalls/SurroundsInstallation of Fireplace Things to ConsiderPosition the Fireplace Place Protective Metal Hearth StripsFt min. from top of uppermost chimney section to air inlet AK14/AK18 Installation PIER-40 Install Outside Air KitAK17 Installation BAY-40 Chimney Assembly Chimney Requirements Height of Chimney ComponentsUsing Offsets/Returns ExampleInstall Chimney Air Kit Assemble Chimney SectionsInstall Ceiling Firestops Installing the Ceiling Firestop Install Attic Insulation Shield 330 mmComplete Installation Install FlashingFollowing steps should be skipped if using a chase Cut out Hole in RoofChimney Termination Requirements Flat RoofsChase Installations Construct the ChaseInstall Fireplace & Chimney Install Chase TopInstall Termination Cap ST1175 Square Termination CapTCT1175 Terra Cotta Cap Shrouds Radiation ShieldField Constructed Shrouds Open Top Shroud TR11/TR11T caps require radiation shieldMailbox Style Shroud radiation shield required Roofed Style Shroud radiation shield required= 1/k x inches of thickness FinishingHearth Extension 1575 mm Finishing Material Hearth Refractory In. Micore or equivilent insulationCombustible Mantel Sidewalls/SurroundsAccessories Gas Log/Lighter ProvisionWood Burning Inserts Gas Code, Ansi Z223.1Fireplace Dimensions Reference Materials13 mm Chimney Components Catalog # Description15-1/4 387 mm 483 mm 15-5/8 397 mm Service Parts BAY-40Comments StockedAt Depot Service Parts PIER-40Part number list on following Part number list on followingPier-40 Do not Discard this Manual