Desa (V)T32EN SERIES, (V)T32EP SERIES Horizontal System Installation Using TWO 90 Elbows

Page 13
5' min. 6' min. 7' min. 8' min. 20' max.
Vertical (V)

Venting Installation instructions

Continued

HORIZONTAL SYSTEM INSTALLATION

USING TWO 90° ELBOWS

The following configurations show the minimum vertical rise requirements for a horizontal system using two 90° elbows.

45° Elbow

Venting with Two 90° Elbows

 

 

Horizontal (H1) +

Vertical (V)

Horizontal (H1)

Horizontal (H2)

5' min.

2' max.

6' max.

6' min.

4' max.

12' max.

7' min.

6' max.

18' max.

8' min.

8' max.

20' max.

20' max.

8' max.

20' max.

Figure 17 - Horizontal Termination Configuration for Venting Using Two 90° Elbows

Venting with Two 90° Elbows

Horizontal (H1) +

Horizontal (H2)

6' max.

12' max.

18' max.

20' max.45° Elbow 20' max.

Figure 18 - Horizontal Termination Configuration for Venting Using Two 90° Elbows

with Termination at 90° with Fireplace

111987-01D

www.desatech.com

13

Image 13
Contents What to do if YOU Smell GAS Safety Information Table of ContentsSafety Information Local Codes Product FeaturesProduct Identification High traffic areasLocation and space requirements Pre-Installation PreparationProper clearances must be maintained Framing and finishing ClearancesFront Top of Standoffs Vent See venting Venting clearancesCombustible Noncombustible Location of Termination CapInstallation Precautions Venting Installation InstructionsInstallation Planning Installing Horizontal Vent Cap Noncombustible Exterior Ground Floor Installation Recommended Applications Corner ground floor installation Snorkel Termination InstallationHorizontal System Installation Using TWO 90 Elbows Flat Ceiling Installation Installation for vertical terminationConnect a section of pipe and extend up through the hole Twist-lock the vent cap onto the last section of vent pipe Installing FirestopVertical Venting High Altitude InstallationNumber Description Parts list for venting kits and componentsInstalling optional blower accessories Fireplace InstallationModel BK Installation Check GAS TypePlug in blower power cord to duplex outlet Model BKT InstallationBlower Wiring Diagram Installing Gas Piping to Fireplace LocationInstallation Items Needed Checking GAS Connections Connecting Fireplace to GAS SupplyTest Pressures Equal To or Less Than Psig 3.5 kPa Pressure Testing Fireplace Gas ConnectionsRemoving/Replacing Glass Door Cleaning Glass DoorRemoving Louver Panels Removing Glass DoorInstalling logs, lava rock and glowing embers Installing Optional Brick liner Model BL32DClose top and bottom louvers Installing Log No Wall Switch Installation Optional Remote control Installation model WRCOpen lower louver panel of firebox Pilot Gas Wiring DiagramLine Operating Fireplace For your safety Read before lightingLighting Instructions To Turn OFF GAS To Appliance Inspecting BurnersOptional Remote Operation Burner Flame PatternGlass Door Cleaning MaintenancePilot and burners LogsTroubleshooting Cleaning and MaintenanceObserved Problem Possible Cause Remedy Venting systemGas leak. See Warning Improper log placement Tery power is low RemoteClean out air holes at burner Glass soots Flame impingement on logsIllustrated Parts Breakdown Parts List 109 11102 Service Hints Replacement PartsTechnical Service SpecificationsAccessories Keep this Warranty Warranty InformationLimited Warranty DIRECT-VENT Fireplace