Desa (V)V36EP-B, VV36ENC1 SERIES Snorkel Termination Installation, Venting with Two 90 Elbows

Page 11

Venting Installation instructions

Continued

SNORKEL TERMINATION INSTALLATION

Recommended Applications:

• Installations requiring a vertical rise on building exterior

• Any installation using snorkel termination to achieve one foot above ground

Snorkel terminations are available for installations requiring a vertical rise on the exterior of the building. If installing snorkel termina- tion below grade, you must provide proper drainage to prevent water from entering snorkel termination (see Figure 16). Do not back fill around snorkel termination.

Snorkel Termination

Snorkel

Termination

12"

Minimum

Snorkel

 

Wall

Termination

 

 

Firestop

 

90° Elbow

 

 

12"

Minimum 45° Elbow

Adequate

Drainage

12"

Minimum

Figure 16 - Snorkel Termination Configurations for Below Ground Installation

HORIZONTAL SYSTEM INSTALLATION USING TWO 90° ELBOWS

The following configurations show the minimum vertical rise requirements for a horizontal system using two 90° elbows.

Venting with Two 90° Elbows

Vertical (V)

Horizontal

Horizontal (H1) +

 

(H1)

Horizontal (H2)

5' min.

2' max.

6' max.

6' min.

4' max.

12' max.

7' min.

6' max.

18' max.

8' min.

8' max.

20' max.

20' max.

8' max.

20' max.

45° Elbow

Venting with Two 90° Elbows

Vertical (V) Horizontal (H1)

 

Horizontal (H2) 45° Elbow

5' min.

6' max.

6' min.

12' max.

7' min.

18' max.

8' min.

20' max.

20' max.

20' max.

Figure 18 - Horizontal Termination Configuration for Venting Using Two 90° Elbows with Termination at 90° with Fireplace

Figure 17 - Horizontal Termination Configuration for Venting

Using Two 90° Elbows

111253-01F

www.desatech.com

11

Image 11
Contents What to do if YOU Smell GAS For Your SafetySafety Information Table of ContentsLocal Codes Product FeaturesProduct Identification Clearances Pre-Installation PreparationLocation and space requirements Framing and finishing Framing Clearances for Installation Against an Exterior WallTermination CAP AIR Supply Inlet GAS Meter Location of Termination CapHorizontal Termination Installation Venting Installation InstructionsInstallation Precautions Installation PlanningVent Pipe Connections Vent pipe before connecting horizontal run to vent cap see Ground Floor Installation Horizontal Termination ConfigurationsVenting with Two 90 Elbows Snorkel Termination InstallationOffset with Wall Strap and 45 Elbows Flat Ceiling InstallationVertical Venting Vertical Termination ConfigurationsInstalling optional blower accessories Fireplace InstallationHigh Altitude Installation Parts lists for venting kits and componentsAttaching Speed Control to Firebox Model BKT InstallationInstallation Items Needed Installing Gas Piping to Fireplace LocationBlower Wiring Diagram Checking GAS Connections Connecting Fireplace to GAS SupplyInstallation Items Needed Pressure Testing Gas Supply Piping SystemTest Pressures Equal To or Less Than 1/2 Psig 3.5 kPa Pressure Testing Fireplace Gas ConnectionsRemoving/Replacing Glass Door Removing Louver PanelsRemoving Glass Door Installing Optional Brick liner Models BL42DASA, BL42DHASACleaning Glass Door Unplug fireplace. Let cool before installing brick linerOptional Remote control Installation model WRC Installing logs, lava rock and glowing embersWall Switch Installation Pilot Burner Pilot Gas Line Wiring DiagramOptional Remote Operation Operating FireplaceTo Turn OFF GAS Burner Flame Pattern Cleaning MaintenancePilot assembly Inspecting BurnersVenting system Pilot and burnersLogs To clean pilot. This can damage pilot unit TroubleshootingTop above Gas leak. See Warning statement atSpecifications Replacement PartsService Hints Technical ServiceIllustrated Parts Breakdown Parts Available not Shown Parts ListIllustrated parts breakdown Parts List Accessories 111253-01F Keep this Warrant Warranty Information