Fireplace Installation

Continued

Removing Glass Door

If replacement of glass is necessary, the entire assembly, glass and frame, must be replaced. If glass is broken, wear gloves and tape the remaining fragments onto the frame.

1.Remove screen assembly by pushing the rod either left or right and then down and forward to remove screen/rod assembly from the firebox. Set assembly aside.

2.Lift up on latches to unlock. There are two on top of firebox and two below firebox that hold glass door in place (see Figure 37).

3.While holding glass door to prevent it from falling and causing injury, remove the five screws from the hinge located on the left side of door frame assembly (see Figure 37).

4.Remount the new frame at the hinge with five new screws before closing door. This will ensure seating of the gasket.

5.Close glass door frame. Lock latches by placing the bar under the tab on door and pushing down and back on latch (see Figure 37).

6.Replace screen/rod assembly by reversing step 1.

7.Replace louvers by reversing procedure under Removing Lou- ver Panels, page 18.

Unlock Lock

Latch

Hinge

Screw

Glass

Frame

Assembly

Figure 37 - Removing/Replacing Glass Door

Cleaning Glass Door

See Cleaning and Maintenance on page 23.

Installing Optional Brick liner Models BL42DA(SA), BL42DHA(SA)

WARNING: If fireplace has been running, turn off and

unplug fireplace. Let cool before installing brick liner.

You may purchase brick liner from your local retailer or see Ac- cessories, page 32.

CAUTION: Always handle brick panels with two hands. Do not force brick panels into place. Excessive force will break brick panels.

1.Remove top and bottom louvers to allow access to door latches.

2.Remove screen, unlock door latches and open glass door. See steps 1 and 2 of Removing/Replacing Glass Door, page 18.

3.If installing brick liner in new fireplace, go to step 4. If install- ing brick liner in an existing fireplace, carefully remove logs, lava rock, and ember material.

4.Remove three screws from deflector shield on the inside top of firebox. Set shield and screws aside.

5.Install rear brick panel first. Rest bottom edge of panel on back edge of grate (see Figure 38).

6.Install left side brick panel by sliding it between burner as- sembly and side of fireplace (see Figure 39).

7.Install the right brick panel using the same method described in step 6 for the left brick panel.

8.Replace deflector shield using screws removed in step 4.

9.Install logs, lava rock, and glowing embers (see Installing Logs, Lava Rock and Glowing Embers, page 20).

10.Close glass door, lock latches on top and bottom of door and replace screen (see steps 5 and 6 of Removing/Replacing Glass Door, column 1).

11.Close top and bottom louvers.

Rear

Brick

Panel

Figure 38 - Installing Brick Panels

Left Side

Brick Panel

Figure 39 - Installing Brick Panels

111253-01F

www.desatech.com

19

Image 19
Contents What to do if YOU Smell GAS For Your SafetySafety Information Table of ContentsProduct Identification Product FeaturesLocal Codes Location and space requirements Pre-Installation PreparationClearances Framing and finishing Framing Clearances for Installation Against an Exterior WallTermination CAP AIR Supply Inlet GAS Meter Location of Termination CapHorizontal Termination Installation Venting Installation InstructionsInstallation Precautions Installation PlanningVent Pipe Connections Vent pipe before connecting horizontal run to vent cap see Ground Floor Installation Horizontal Termination ConfigurationsVenting with Two 90 Elbows Snorkel Termination InstallationOffset with Wall Strap and 45 Elbows Flat Ceiling InstallationVertical Venting Vertical Termination ConfigurationsInstalling optional blower accessories Fireplace InstallationHigh Altitude Installation Parts lists for venting kits and componentsAttaching Speed Control to Firebox Model BKT InstallationBlower Wiring Diagram Installing Gas Piping to Fireplace LocationInstallation Items Needed Checking GAS Connections Connecting Fireplace to GAS SupplyInstallation Items Needed Pressure Testing Gas Supply Piping SystemTest Pressures Equal To or Less Than 1/2 Psig 3.5 kPa Pressure Testing Fireplace Gas ConnectionsRemoving/Replacing Glass Door Removing Louver PanelsRemoving Glass Door Installing Optional Brick liner Models BL42DASA, BL42DHASACleaning Glass Door Unplug fireplace. Let cool before installing brick linerWall Switch Installation Installing logs, lava rock and glowing embersOptional Remote control Installation model WRC Pilot Burner Pilot Gas Line Wiring DiagramTo Turn OFF GAS Operating FireplaceOptional Remote Operation Burner Flame Pattern Cleaning MaintenancePilot assembly Inspecting BurnersLogs Pilot and burnersVenting system To clean pilot. This can damage pilot unit TroubleshootingTop above Gas leak. See Warning statement atSpecifications Replacement PartsService Hints Technical ServiceIllustrated Parts Breakdown Parts Available not Shown Parts ListIllustrated parts breakdown Parts List Accessories 111253-01F Keep this Warrant Warranty Information