Installation Inspection

Installation

Step 4.1 Performing the gas leak tests

1Before inspecting the leakage, use a torque wrench to close the cap for the stop valve. (Comply with a tightening torque for each size of the diameter, and tighten the cap firmly to prevent any leakage.)

Tightening torque for body cap (Refer to the table)

Charging core

Spindle

R-22: Thread of the screw - 7/16-2OUNF

R-410A: Thread of the screw -1/2-2OUNF

Tightening torque for charging port cap (Refer to the table)

Outer diameter

 

Tightening torque

 

 

 

(mm)

Body cap

Charging port cap (N•m)

 

(N•m)

 

 

 

 

ø 6.35

20 to 25

 

 

 

 

 

 

ø 9.52

20 to 25

 

 

 

 

 

 

ø 12.70

25 to 30

 

10 to 12

 

 

 

 

ø 15.88

30 to 35

 

 

 

 

 

 

Over ø 19.05

35 to 40

 

 

 

 

 

 

 

 

 

( 1 N•m = 10 kgf•cm )

2Insert inert gas into the pipes connected to indoor and outdoor units.

3Test leakage on the connection parts of the indoor and outdoor units with soap lather or liquid.

Test parts for the indoor unit

Test parts for the indoor unit

Step 4.2 Running the Smart Install mode

1Make sure that the air conditioner is in the standby status.

2Hold down the (Power), (Mode), and

(SET) buttons on the remote control simultaneously for 4 seconds.

3Wait until Smart Install mode succeeds or fails. It takes approximately 7 to 13 minutes.

• While Smart Install mode is proceeding:

Type

Display

LED Display

 

 

 

 

 

 

 

 

 

 

 

 

LED3

 

 

 

 

 

 

 

 

LED2

 

 

 

 

 

 

 

 

LED1

 

Indoor

 

 

 

 

unit

 

The LEDs on the

indicator

The progress is

indoor unit display

 

displayed as a

 

blink in sequence,

 

number between

 

then all of them blink

 

0 and 99 on the

 

simultaneously. These

 

indoor unit display.

 

operations repeat.

 

 

 

 

 

 

 

When Smart Install mode succeeds: Smart

Install mode ends with ringing sound, and the air conditioner is in standby status.

When Smart Install mode fails: An error message is displayed on the indoor unit display, and Smart Install mode ends.

NOTE

Smart Install mode can be operated only with the supplied remote control.

During the Smart install mode procedure, remote control cannot be operated.

40English

Page 40
Image 40
Samsung AR10NVFSCURNSV manual Installation Inspection, Performing the gas leak tests, Running the Smart Install mode