AR**NVFH
Contents
Safety Information
At a Glance
Power Smart Features
Energy-SavingFeatures
Indoor Unit Installation
Step 2.1 Connecting the power and communication cables (assembly cable)
Step 2.2 Optional: Extending the power cable
Step 2.3 Installing and connecting the drain hose
Step 2.4 Optional: Extending the drain hose
Safety Information
Install your appliance on a level and hard floor that can support its weight
Install the drain hose properly so that water drains correctly
FOR POWER SUPPLY
When the circuit breaker is damaged, contact your nearest service centre
• Failing to do so may result in electric shock or fire
•Do not use a ventilating fan
•A spark may result in an explosion or fire
To reinstall the air conditioner, please contact your nearest service centre
•This may result in electric shock
•If a child places a bag over its head, it may result in suffocation
Do not touch the air flow blade with your hands or fingers during heating
•This may result in electric shock or burns
Do not strike or pull the air conditionerwith excessive force
•The water may be harmful to humans
•This may result in burns or injury
•This may result in property damage
•This may result in harm to humans, animals or plants
FOR CLEANING
Indoor Unit Overview
Remote Control Overview
Remote Control Operation
Vertical air flow
Features Smart Power
Cooling Operation
Dehumidifying Operation
Quick Smart Features
Fast function
Comfort function
Quiet function
Beep sound function
Energy-SavingOperation
Features Saving-Energy
Timed on/Timed off function
good’sleep function
(Select
among
On, Off, and .)
(Set the operation time.) ►
Cleaning at a Glance
Maintenance and Cleaning
Cleaningand
Maintenance
Troubleshooting
Page
Installation
Power supply line, fuse, or circuit breaker
Preparation
Step1.1 Choosing the installation location
Overview of installation location requirements
•Comply with the length and height limits described in the figure above
Minimum clearances for the outdoor unit
Step1.3 Checking and preparing accessories and tools
Optional accessories
Accessories in the outdoor unit package
Tools
General tools
•Vacuum pump
Step1.4 Drilling a hole through the wall
Indoor Unit Installation
•Tighten the terminal block screw to 1.2-1.8N•m (1.2-1.8kgf•cm)
•Each wire is labelled with the corresponding terminal number
•Use shield cable (Category 5; less than 50pF/m) for noisy environmental site
•Power & Communication cable shall not exceed
Step 2.2 Optional: Extending the power cable
1Prepare the following tools
•Peel off 20 mm of cable shields from the pre-installedtube
• The compression dimension should be
Three or more layers of insulation are required
•In case of extending the electric wire, please DO NOT use a round-shaped
pressing socket
or a fire
Step 2.3 Installing and connecting the drain hose
1Install the drain hose
Step 2.5 Optional: Changing the direction of the drain hose
Cut out the appropriate
2Smooth the cut edges
4Cut off the remaining foam insulation
•The pipe should not project from the rear of the indoor unit
6Pass the pipe through the hole in the wall
Step 2.8 Fixing the installation plate
You can install the indoor unit on a wall, window frame, or gypsum board
When fixing the indoor unit on a wall
Tighten the flare nut at the specified torque. If the flare nut is
When fixing the indoor unit on a window frame
1Use stud finder to find out locations of the studs
2Fix the plate hanger on two studs
•Fix the installation plate without inclining to one side
Outdoor Unit Installation
Step 3.1 Fixing the outdoor unit in place
Step 3.3 Evacuating the air
of cooling capacity and malfunction. Use a vacuum pump
•When installing, make sure there is no leakage
1Leave the system in the standby mode
3Open the valve of the low pressure side of manifold gauge anticlockwise
•Close the valve of the low pressure side of manifold gauge clockwise
•Turn off the vacuum pump
•Check for 2 minutes if there is any pressure change
•Remove the hose of the low pressure side of manifold gauge
Installation Inspection
❈: Off, : Blinking, : On
Step 4.3 Performing final check and trial operation
1Check the following:
•Strength of the installation site
•Tightness of pipe connection to detect gas leak
•Electric wiring connection
Page
Page
QUESTIONS OR COMMENTS
DB68-07847A-00