Desa T32N-A, CGDV32NR, T32P-A, CGDV32PR installation manual Vertical Termination Configurations

Page 14

14

VENTING INSTALLATION INSTRUCTIONS

Installation for Vertical Termination (Cont.)

VENTING INSTALLATION INSTRUCTIONS

Continued

Vertical Termination Configurations

Figures 21 through 24 show four different configurations for verti- cal termination.

Venting with Two 90° Elbows

Vertical (V)

Horizontal (H1) +

 

Horizontal (H2)

5' min.

2' max.

6' min.

4' max.

7' min.

6' max.

8' min.

8' max.

20' max.

8' max.

45° Elbow

Note: Install

restrictor into inner

 

collar of fireplace

 

as shown.

Venting with One 90° Elbow

Vertical (V)

Horizontal (H)

5' min.

2' max.

6' min.

4' max.

7' min.

6' max.

8' min.

8' max.

20' max.

8' max.

45° Elbow

Note: Install

restrictor into inner

 

 

collar of fireplace

 

as shown.

Figure 22 - Vertical Venting Configuration Using One 90° Elbow (Vertical Round High Wind Termination Shown)

Figure 21 - Vertical Venting Configuration Using Two 90° Elbows with Two Horizontal Runs (Vertical Round High Wind Termination Shown)

Venting with Two 90° Elbows

Vertical (V1)

Horizontal (H)

5' min.

6' max.

6' min.

12' max.

7' min.

18' max.

8' min.

20' max.

Note: Install restrictor into inner collar of fireplace as shown.

45° Elbow

Note: Vertical (V1) + Vertical (V2) = 40' max.

Figure 23 - Vertical Venting Configuration Using Two 90° Elbows (Vertical Round High Wind Termination Shown)

www.desatech.com

116646-01B

Image 14
Contents For Your Safety What to do if YOU Smell GAS OWNER’S Operation Installation ManualFor Your Safety Save this manual for future referenceTable of Contents Safety InformationSafety Information Product Identification Local CodesLocation and Space Requirements Product FeaturesPRE-INSTALLATION Preparation Clearances Framing and FinishingLocation of Termination CAP Termination CAP AIR Supply Inlet GAS MeterVenting Installation Instructions Installation PrecautionsInstallation Planning Horizontal Termination InstallationInstalling Siding Standoff Combustible Cap must be removable for vent inspection MaintenanceHorizontal Termination Configurations Vertical Corner Installation Horizontal System Installation Using TWO Elbows Venting with Two 90 ElbowsInstallation for Vertical Termination Flat Ceiling InstallationVertical Termination Configurations Venting with One 90 ElbowHigh Altitude Installation Vertical VentingInstalling Optional Blower Accessories Venting InstallationFireplace Installation Check GAS TypeModel BKT Installation Blower see FigureInstallation Items Needed Installing GAS Piping to Fireplace LocationBlower Wiring Diagram Or servicing. Correct all leaks at once Connecting Fireplace to GAS SupplyChecking GAS Connections Installing Optional Wall Mount Switch GWMS2 Pressure Testing Fireplace Gas ConnectionsRemote Control Unit Installing Remote ReceiverInstalling 9-Volt Alkaline Battery in Hand-Held Removing Louver PanelsRemoving Glass Door Installing Optional Brick Liner Model BL32DCleaning Glass Door Installing LOGS, Lava Rock and Glowing Embers Installing Side Brick PanelsLighting Instructions For Your Safety Read Before LightingOperating Fireplace Optional HAND-HELD Remote Operation Manual Lighting ProcedureTo Turn OFF GAS To Appliance Shutting Off Burners Only pilot stays litON/OFF Series Thermostat SeriesInspecting Burners Operating Optional Blower AccessoryPilot Assembly Operating Optional GWMT1 Wall Mounted ThermostatPilot and Burners Cleaning and MaintenanceGlass Door LogsTroubleshooting Observed Problem Possible Cause RemedyInlet gas pressure is too low Gas leak. See Warning statement AboveIllustrated Parts Breakdown CGDV32NR CGDV32PRParts List Parts ListTechnical Service Replacement PartsService Hints SpecificationsOwners Registration Form Postage Required Accessories Warranty Information Keep this Warranty