Desa T32N-A, CGDV32NR, T32P-A, CGDV32PR, (V)T32P-A SERIES, (V)T32N-A SERIES Installation Planning

Page 8

8

VENTING INSTALLATION INSTRUCTIONS

Installation Planning

VENTING INSTALLATION INSTRUCTIONS

Continued

INSTALLATION PLANNING

There are two basic types of direct-vent installation:

Horizontal Termination

Vertical Termination

Horizontal Termination Installation

Female

Locking

Lugs

Male Slots

IMPORTANT: Horizontal square terminations require only inner portion of wall firestop. Horizontal installations using round ter- mination require exterior portion of wall firestop available only in vent kit HTK (see Figure 14, page 10).

1.Set the fireplace in its desired location and determine the route your horizontal venting will take. Do not secure the fireplace until all venting has been installed. Some installations require sliding the fireplace in and out of position to make final venting connections. Figures 14 through 18 on pages 10 through 12 show different configurations for venting with horizontal termination that will help you decide which application best suits your instal- lation. Check to see if wall studs or roof rafters are in the path of your desired venting route. If they are, you may want to adjust the location of the fireplace.

2.Direct vent pipe sections and components are designed with special twist-lock connections.

Twist-Lock Procedure: The female ends of the pipes have locking lugs (indentations). These lugs will slide straight into matching slots on the male ends of adjacent pipes. Push pipe sections together and twist one section clockwise approxi- mately one-quarter turn until the sections are fully locked (see Figure 8). Note: Horizontal runs of vent must be supported every three feet. Use wall straps for this purpose.

3.Use a 45° elbow to connect venting system to fireplace flue collar. The elbow is designed to be twist-locked onto the flue collar as described in step 2. IMPORTANT: Do not attempt to alter the configuration of the elbow by cutting, twisting, bending, etc.

4.Assemble the desired combination of pipe and elbows to the fireplace flue collar. If there are long portions of venting run, pre-assembled pipe sections may be installed as subassemblies for convenience.

5.Carefully determine the location where the vent pipe assembly will penetrate the outside wall. The center of the hole should line up with the center-line of the horizontal vent pipe. Mark the wall for a 10 3/4" x 10 3/4" square hole. Cut and frame the square hole in the exterior wall where the vent will be terminated. If the wall being penetrated is constructed of noncombustible material, such as masonry block or concrete, a 8 1/2" hole with zero clearance is acceptable (see Figure 9).

Figure 8 - Vent Pipe Connections

 

 

 

Vent Opening

 

 

 

 

 

 

 

Combustible Wall

10

3

/4" Inside Framing

 

 

 

 

3

 

 

 

 

 

 

10

/4"

 

 

 

(273 mm)

 

 

 

 

 

 

 

 

 

 

(273 mm)

 

 

 

 

10

3

/4"

 

 

 

 

 

 

 

 

 

 

 

 

 

 

(273 mm)

 

 

 

 

 

 

 

 

 

 

 

 

(Framing

 

 

Vent Opening

 

Detail)

 

 

 

 

 

 

 

Noncombustible Wall

 

 

 

 

8

1

/2"

 

 

 

 

 

 

 

 

 

 

 

 

 

(216 mm)

 

 

 

 

 

 

Center

of Hole

Figure 9 - Vent Opening Requirements

www.desatech.com

116646-01B

Image 8
Contents OWNER’S Operation Installation Manual For Your SafetyFor Your Safety What to do if YOU Smell GAS Save this manual for future referenceTable of Contents Safety InformationSafety Information Product Identification Local CodesLocation and Space Requirements Product FeaturesPRE-INSTALLATION Preparation Clearances Framing and FinishingLocation of Termination CAP Termination CAP AIR Supply Inlet GAS MeterVenting Installation Instructions Installation PrecautionsInstallation Planning Horizontal Termination InstallationInstalling Siding Standoff Combustible Maintenance Horizontal Termination ConfigurationsCap must be removable for vent inspection VerticalCorner Installation Horizontal System Installation Using TWO Elbows Venting with Two 90 ElbowsInstallation for Vertical Termination Flat Ceiling InstallationVertical Termination Configurations Venting with One 90 ElbowHigh Altitude Installation Vertical VentingVenting Installation Fireplace InstallationInstalling Optional Blower Accessories Check GAS TypeModel BKT Installation Blower see FigureInstallation Items Needed Installing GAS Piping to Fireplace LocationBlower Wiring Diagram Or servicing. Correct all leaks at once Connecting Fireplace to GAS SupplyChecking GAS Connections Installing Optional Wall Mount Switch GWMS2 Pressure Testing Fireplace Gas ConnectionsInstalling Remote Receiver Installing 9-Volt Alkaline Battery in Hand-HeldRemote Control Unit Removing Louver PanelsRemoving Glass Door Installing Optional Brick Liner Model BL32DCleaning Glass Door Installing LOGS, Lava Rock and Glowing Embers Installing Side Brick PanelsLighting Instructions For Your Safety Read Before LightingOperating Fireplace Manual Lighting Procedure To Turn OFF GAS To ApplianceOptional HAND-HELD Remote Operation Shutting Off Burners Only pilot stays litON/OFF Series Thermostat SeriesOperating Optional Blower Accessory Pilot AssemblyInspecting Burners Operating Optional GWMT1 Wall Mounted ThermostatCleaning and Maintenance Glass DoorPilot and Burners LogsTroubleshooting Observed Problem Possible Cause RemedyInlet gas pressure is too low Gas leak. See Warning statement AboveIllustrated Parts Breakdown CGDV32NR CGDV32PRParts List Parts ListReplacement Parts Service HintsTechnical Service SpecificationsOwners Registration Form Postage Required Accessories Warranty Information Keep this Warranty