VENTING INSTALLATION

Continued

Installing Vent System in a Chase

A chase is a vertical box-like structure built to enclose venting that runs along the outside of a building. A chase is not required for such venting.

NOTICE: Treatment of firestops and construction of the chase may vary from building type to building type. These instructions are not substitutes for the requirements of local building codes. You must fol- low all local building codes.

Note: When installing in a chase, you should insulate the chase as you would the outside walls of your home. This is especially important in cold climates. Minimum air space clearance between vent pipes and combustible materials and/or insulation is 1".

INSTALLATION FOR HORIZONTAL TERMINATION

CAUTION: Horizontally terminated venting con- figurations require one foot of vertical rise from the 45° elbow before any horizontal run can be made. Failure to meet venting requirements may cause performance problems and possible damage to the fireplace.

1.Determine the route your horizontal venting will take. Note: The location of the horizontal vent termination on the exterior wall must meet all local and national building codes and must not be blocked or obstructed.

WARNING: Do not recess vent terminal into a wall or siding.

Snorkel terminations are available for terminations requiring a vertical rise on the exterior of the building (see Figures 21 and 22). Snorkel kit VKS-47-K is also available (see page 19). Fol- low the same installation procedures used for standard horizon- tal termination with the exception of the external wall firestop. The snorkel termination does not require the use of the external wall firestop. If installing the snorkel termination below grade (basement applications), you must provide proper drainage to prevent water from entering the snorkel termination (see Figure 22). Do not back fill around the snorkel termination.

2.Vent pipes and fittings have special twist-lock connections. As- semble the desired combination of pipe and elbows to the appli- ance adaptor with pipe seams oriented towards the wall or floor.

Twist-lock Procedure: The female ends of the pipes and fittings have four locking lugs (indentations). These lugs will slide straight into matching slots on the male ends of adjacent pipes and fittings. (All connections must be sealed with high temperature silicone sealant as specified in the second warning statement on page 12.) Push the pipe sections together and twist one section clockwise approximately one-quarter turn until the sections are fully locked. See Figure 23. Note: Horizontal runs of vent must be supported every three feet. Use wall straps for this purpose.

VENTING INSTALLATION

13

Installation Planning (Cont.)

Installation for Horizontal Termination

 

 

 

Snorkel

12" Minimum

(30.5cm)

Figure 21 - Snorkel Termination

Snorkel

12" Minimum

(30.5cm)

Adequate drainage

Figure 22 - Snorkel Termination with Drainage Pipe

Female

Locking Lugs

Male

Slots

Vent Pipe

Figure 23 - Vent Pipe Connections

For morevisit www..com

112126-01B

Image 13
Contents For Your Safety OWNER’S Operation and Installation ManualFor Your Safety What to do if YOU Smell GAS VH series StoveSafety Information Table of ContentsWith stove Product IdentificationLocal Codes PRE-INSTALLATION Preparation Product FeaturesGlossary of Terms Cast Iron Stove and DIRECT-VENT Burner System Assembly PRE-INSTALLATION PreparationStove Body Assembly Locating Threaded Holes for Legs and Door Attachment Removing Front Surround Panel Installing DIRECT-VENT Burner System Into Stove BodyRemoving Screen Optional Amity ModelsTOP View Installing Optional Blower Accessory Installing the BlowerBlower Wiring Layout Thermostat Blower Shown Installing Rear CoverLocation of Vent Termination General VentingGeneral Venting Installation Precautions Venting InstallationInstallation Planning Installing Vent System in a Chase Installation for Horizontal TerminationVent Opening Requirements Horizontal Venting Horizontal Termination ConfigurationsVenting with Three 90 Elbows Venting with Two 90 ElbowsFlat Ceiling Installation Installation for Vertical TerminationVertical Termination Configurations Cathedral Ceiling InstallationVenting with Two 90 Elbow Venting with Two Elbows Vertical Venting Configuration Using Two 90ElbowsParts Lists for Venting Kits and Components High Altitude InstallationVertical Venting Number DescriptionInstalling GAS Piping to STOVE/ Burner System Location Stove and DIRECT-VENT Burner System InstallationInstallation Items Needed Check GAS TypePressure Testing Gas Supply Piping System Connecting STOVE/BURNER System to GAS SupplyChecking GAS Connections Pressure Testing Burner System Gas Connections Installing Optional Wall Mount Switch GWMS2Installing Remote Receiver and 9-volt Alkaline Battery Installing Optional Wall Mounted Thermostat GWMT1REMOVING/REPLACING Glass Door Installing Remote ReceiverInstalling Log No Installing Log No Installing LOGS, Lava Rock and Glowing EmbersOperating Stove with Burner System For Your Safety Read Before LightingLighting Instructions To Turn OFF GAS To ApplianceOptional HAND-HELD Remote Operation Manual LightingON/OFF Series Models Ghrcb and Cghrcb Thermostat Series Models Ghrctb and CghrctbPilot Assembly Operating Optional Blower AccessoryInspecting Burners Operating Optional GWMT1 Wall Mounted ThermostatGlass Door Cleaning and MaintenancePilot and Burners LogsObserved Problem Possible Cause Remedy TroubleshootingOrifice Above Gas leak. See Warning statementWiring Diagram SpecificationsReplacement Parts Parts Under WarrantyModels Sdvbnd Sdvbpd Illustrated Parts BreakdownModels SDVBND, Sdvbpd Parts ListVictor Hearth Stove Body Indicates Color Suffix Designation Oxford Amity Stove BodyDescription QTY Indicates Color Suffix DesignationService Hints Technical ServiceAccessories Owners Registration Form For Com 112126-01B Warranty Information
Related manuals
Manual 42 pages 850 b

SDVBPD, SDVBND specifications

Desa SDVBPD and SDVBND are pioneering advancements in the domain of digital communication, designed to optimize services, enhance user engagement, and streamline processes in various sectors, including education, healthcare, and local governance. These systems have emerged as essential tools for efficient information dissemination and resource management.

One of the main features of Desa SDVBPD is its focus on decentralized communication. By utilizing local infrastructure, this system empowers communities to share information effectively and enhance interactions among residents. It enables local authorities to communicate directly with citizens, ensuring that pertinent information reaches the intended audience promptly. This feature is especially vital in emergency situations, where timely updates can significantly impact community safety and preparedness.

Similarly, SDVBND offers a robust platform for managing digital transactions and records. Its integration of blockchain technology ensures that all data processed is secure, immutable, and transparent. This characteristic is particularly beneficial for local government operations, as it minimizes the risk of fraud and enhances accountability in public service delivery. By leveraging this technology, Desa SDVBND can facilitate smooth and fast transactions between citizens and government entities, thereby transforming the way public services are accessed.

Another remarkable aspect of both systems is their accessibility. Designed with user-friendly interfaces, these platforms cater to individuals of varying technological proficiencies. Mobile compatibility allows users to engage with the systems from smartphones and tablets, making it easier to stay informed and involved. Furthermore, the platforms are multilingual, ensuring that communication is inclusive, reaching diverse populations within communities.

Interoperability stands out as a significant characteristic of Desa SDVBPD and SDVBND. Both systems are designed to seamlessly integrate with existing infrastructure and technologies, such as cloud computing and artificial intelligence. This adaptability enhances their functionality, enabling real-time data analysis and improved decision-making.

In conclusion, Desa SDVBPD and SDVBND represent a significant leap forward in community engagement and service delivery. By leveraging decentralized communication, blockchain technology, accessibility, and interoperability, these systems not only improve operational efficiency but also foster a sense of community empowerment. As they continue to evolve, they hold great promise for enabling smarter, more connected communities that can thrive in an increasingly digital world.