Desa SDVBND, SDVBPD installation manual Troubleshooting, Observed Problem Possible Cause Remedy

Page 30

30

TROUBLESHOOTING

TROUBLESHOOTING

Note: For additional help, visit DESA’s technical service web site at www.desatech.com.

Note: All troubleshooting items are listed in order of operation.

WARNING: Turn off burner system and let cool before servicing. Only a qualified service person should ser- vice and repair burner system or stove.

CAUTION: Never use a wire, needle, or similar ob- ject to clean pilot. This can damage pilot unit.

OBSERVED PROBLEM

POSSIBLE CAUSE

REMEDY

 

 

 

 

 

When ignitor button is pressed, there is no

1.

Ignitor electrode not connected to igni-

1.

Reconnect ignitor cable

spark at pilot

 

tor cable

 

 

 

2.

Ignitor cable pinched or wet

2.

Free ignitor cable if pinched by any

 

 

 

 

metal or tubing. Keep ignitor cable dry

 

3.

Piezo ignitor nut is loose

3.

Tighten nut holding piezo ignitor. Nut

 

 

 

 

is located behind the mounting bracket

 

4.

Broken ignitor cable

4.

Replace ignitor cable

 

5.

Bad piezo ignitor

5.

Replace piezo ignitor

 

6.

Ignitor electrode broken

6.

Replace pilot assembly

 

7.

Ignitor electrode positioned wrong

7.

Replace pilot assembly

When ignitor button is pressed, there is spark at pilot but no ignition

1.Gas supply turned off or equipment shutoff valve closed

2.Gas control knob not in PILOT position

3.Gas control knob not pressed in while in PILOT position

4.Air in gas lines when installed

5.Depleted gas supply (propane/LP only)

6.Pilot is clogged

7.Gas regulator setting is not correct

1.Turn on gas supply or open equipment shutoff valve

2.Turn gas control knob to PILOT position

3.Press in gas control knob while in PILOT position

4.Continue holding down gas control knob. Repeat igniting operation until air is removed

5.Contact local propane/LP gas company

6.Clean pilot (see Cleaning and Mainte- nance, page 29) or replace pilot assembly

7.Replace gas control

Pilot lights but flame goes out when control

1.

Gas control knob not fully pressed in

1.

Press in gas control knob fully

knob is released

2.

Gas control knob not pressed in long

2.

After pilot lights, keep gas control knob

 

 

enough

 

pressed in 30 seconds

 

3.

Equipment shutoff valve not fully open

3.

Fully open equipment shutoff valve

 

4.

Pilot flame not touching thermocouple,

4.

A) Contact local gas company

 

 

which allows thermocouple to cool,

 

 

 

 

causing pilot flame to go out. This prob-

 

B) Clean pilot (see Cleaning and

 

 

lem could be caused by one or both of

 

Maintenance, page 29) or replace pilot

 

 

the following:

 

assembly

 

 

A) Low gas pressure

 

 

 

 

B) Dirty or partially clogged pilot

 

 

 

5.

Thermocouple connection loose at con-

5.

Hand tighten until snug, then tighten

 

 

trol valve

 

1/4 turn more

 

6.

Thermocouple damaged

6.

Replace pilot assembly

 

7.

Control valve damaged

7.

Replace control valve

For..com

112126-01B

Image 30
Contents For Your Safety What to do if YOU Smell GAS OWNER’S Operation and Installation ManualFor Your Safety VH series StoveTable of Contents Safety InformationProduct Identification With stovePRE-INSTALLATION Preparation Product Features Local CodesGlossary of Terms PRE-INSTALLATION Preparation Cast Iron Stove and DIRECT-VENT Burner System AssemblyStove Body Assembly Locating Threaded Holes for Legs and Door Attachment Removing Screen Optional Installing DIRECT-VENT Burner System Into Stove BodyRemoving Front Surround Panel Amity ModelsInstalling Optional Blower Accessory Installing the Blower TOP ViewInstalling Rear Cover Blower Wiring Layout Thermostat Blower ShownGeneral Venting Location of Vent TerminationGeneral Venting Venting Installation Installation PrecautionsInstallation Planning Installation for Horizontal Termination Installing Vent System in a ChaseVent Opening Requirements Venting with Three 90 Elbows Horizontal Termination ConfigurationsHorizontal Venting Venting with Two 90 ElbowsInstallation for Vertical Termination Flat Ceiling InstallationCathedral Ceiling Installation Vertical Termination ConfigurationsVenting with Two 90 Elbow Vertical Venting Configuration Using Two 90Elbows Venting with Two ElbowsVertical Venting High Altitude InstallationParts Lists for Venting Kits and Components Number DescriptionInstallation Items Needed Stove and DIRECT-VENT Burner System InstallationInstalling GAS Piping to STOVE/ Burner System Location Check GAS TypeConnecting STOVE/BURNER System to GAS Supply Pressure Testing Gas Supply Piping SystemChecking GAS Connections Installing Optional Wall Mount Switch GWMS2 Pressure Testing Burner System Gas ConnectionsInstalling Optional Wall Mounted Thermostat GWMT1 Installing Remote Receiver and 9-volt Alkaline BatteryInstalling Remote Receiver REMOVING/REPLACING Glass DoorInstalling LOGS, Lava Rock and Glowing Embers Installing Log No Installing Log NoLighting Instructions For Your Safety Read Before LightingOperating Stove with Burner System To Turn OFF GAS To ApplianceON/OFF Series Models Ghrcb and Cghrcb Manual LightingOptional HAND-HELD Remote Operation Thermostat Series Models Ghrctb and CghrctbInspecting Burners Operating Optional Blower AccessoryPilot Assembly Operating Optional GWMT1 Wall Mounted ThermostatPilot and Burners Cleaning and MaintenanceGlass Door LogsTroubleshooting Observed Problem Possible Cause RemedyOrifice Gas leak. See Warning statement AboveReplacement Parts SpecificationsWiring Diagram Parts Under WarrantyIllustrated Parts Breakdown Models Sdvbnd SdvbpdParts List Models SDVBND, SdvbpdIndicates Color Suffix Designation Oxford Amity Stove Body Victor Hearth Stove BodyIndicates Color Suffix Designation Description QTYTechnical Service Service HintsAccessories Owners Registration Form For Com 112126-01B Warranty Information
Related manuals
Manual 42 pages 850 b

SDVBPD, SDVBND specifications

Desa SDVBPD and SDVBND are pioneering advancements in the domain of digital communication, designed to optimize services, enhance user engagement, and streamline processes in various sectors, including education, healthcare, and local governance. These systems have emerged as essential tools for efficient information dissemination and resource management.

One of the main features of Desa SDVBPD is its focus on decentralized communication. By utilizing local infrastructure, this system empowers communities to share information effectively and enhance interactions among residents. It enables local authorities to communicate directly with citizens, ensuring that pertinent information reaches the intended audience promptly. This feature is especially vital in emergency situations, where timely updates can significantly impact community safety and preparedness.

Similarly, SDVBND offers a robust platform for managing digital transactions and records. Its integration of blockchain technology ensures that all data processed is secure, immutable, and transparent. This characteristic is particularly beneficial for local government operations, as it minimizes the risk of fraud and enhances accountability in public service delivery. By leveraging this technology, Desa SDVBND can facilitate smooth and fast transactions between citizens and government entities, thereby transforming the way public services are accessed.

Another remarkable aspect of both systems is their accessibility. Designed with user-friendly interfaces, these platforms cater to individuals of varying technological proficiencies. Mobile compatibility allows users to engage with the systems from smartphones and tablets, making it easier to stay informed and involved. Furthermore, the platforms are multilingual, ensuring that communication is inclusive, reaching diverse populations within communities.

Interoperability stands out as a significant characteristic of Desa SDVBPD and SDVBND. Both systems are designed to seamlessly integrate with existing infrastructure and technologies, such as cloud computing and artificial intelligence. This adaptability enhances their functionality, enabling real-time data analysis and improved decision-making.

In conclusion, Desa SDVBPD and SDVBND represent a significant leap forward in community engagement and service delivery. By leveraging decentralized communication, blockchain technology, accessibility, and interoperability, these systems not only improve operational efficiency but also foster a sense of community empowerment. As they continue to evolve, they hold great promise for enabling smarter, more connected communities that can thrive in an increasingly digital world.