Dover Finishing Products 2510, 2210, 2200, 2020 Assembling the cold handle, Electrical connection

Page 10

4.2.4. Assembling the “cold handle”

Assemble the different parts of the handle, I.e. a screw M8x50, a wooden handle and a nut, as indicated on the s- ketch.

4.2.5. Electrical connection

For protection, the unit must always be connected to power. The appliance is sup- plied with a speed control to vary the running speed of the fans. This can be left trail- ing or fitted o the wall mounting supplied.

2020/2220/2520/2210/2510/2200/2500

10

03.27883.100

Image 10
Contents 2020/2220/2520/2210/2510/2200/2500 Table of contents Foreword SafetyIntroduction Principle Preparatory measures Installation guidelineChimney Ventilation Floor round the appliance Floor, wallsUnder the appliance Walls, ceilingChanging the direction of the door-opening Outside the radiation area of the fireplacePreparation Removing the clapetFitting frame surround Assembling the cold handle Electrical connectionTo be built into a new chimney InstallationTo be built in a existing chimney Finishing Packaging materialsBuildup Existant chimney Fuel Instructions for useLighting a fire Burning wood Burning coalExtinguishing the fire Ash removalWeather conditions Maintenance Model Annex 2 Dimensions 2510S 2210S 2220 2520S 2510D 2020S 2520S/2/3 03.27883.100 0608