Dover Finishing Products 2520, 2210, 2200, 2020, 2510, 2220, 2500 manual Buildup

Page 13

Chimney

Combustible

 

 

ceiling

Refractory

Opening against

cement or spe-

cial connector

eventual pressure

 

buildup

Isolation (min

Extra opening

5 cm)

for ventilation

 

fireplace

Fireproff wall

 

min 10 cm

 

 

Stainless steel

 

pipe

 

Insulation (if

 

necessary)

Combustible

 

wall

Canvection air

 

 

outlet

Convection air

 

(min 15 mm)

 

 

Convection air

 

inlet

 

Fireproof floor

 

Combustible

 

floor

Example of fireplace installation within combustible material

2020/2220/2520/2210/2510/2200/2500

13

03.27883.100

Image 13
Contents 2020/2220/2520/2210/2510/2200/2500 Table of contents Foreword SafetyIntroduction Principle Preparatory measures Installation guidelineChimney Ventilation Under the appliance Floor, wallsFloor round the appliance Walls, ceilingPreparation Outside the radiation area of the fireplaceChanging the direction of the door-opening Removing the clapetFitting frame surround Electrical connection Assembling the cold handleTo be built into a new chimney InstallationTo be built in a existing chimney Packaging materials FinishingBuildup Existant chimney Fuel Instructions for useLighting a fire Burning coal Burning woodExtinguishing the fire Ash removalWeather conditions Maintenance Model Annex 2 Dimensions 2510S 2210S 2220 2520S 2510D 2020S 2520S/2/3 03.27883.100 0608