Dover Finishing Products 2210, 2200, 2020, 2510, 2220, 2500, 2520 manual Existant chimney

Page 14

 

Existant chimney

 

Extra opening for

 

ventilation firepalce

 

Refractory cement or

 

special connector

Existant fire-

 

place

Opening against

 

eventual pressure

 

builup

 

Convection air

 

outlet

Ventilation:

 

min 15 mm)

 

 

Convection

 

air inlet

Example of installation in an existante fireplace

2020/2220/2520/2210/2510/2200/2500

14

03.27883.100

Image 14
Contents 2020/2220/2520/2210/2510/2200/2500 Table of contents Introduction SafetyForeword Principle Chimney Installation guidelinePreparatory measures Ventilation Floor round the appliance Floor, wallsUnder the appliance Walls, ceilingChanging the direction of the door-opening Outside the radiation area of the fireplacePreparation Removing the clapetFitting frame surround Assembling the cold handle Electrical connectionTo be built in a existing chimney InstallationTo be built into a new chimney Finishing Packaging materialsBuildup Existant chimney Lighting a fire Instructions for useFuel Burning wood Burning coalWeather conditions Ash removalExtinguishing the fire Maintenance Model Annex 2 Dimensions 2510S 2210S 2220 2520S 2510D 2020S 2520S/2/3 03.27883.100 0608