Dover Finishing Products 2500, 2210, 2200, 2020, 2510, 2220, 2520 manual Finishing, Packaging materials

Page 12

4.4.Finishing

When the appliance is installed in the right place, its connection with the chim- ney made airtight, and the masonry mantle completely mounted, all loose parts are installed in the appliance.

Your fireplace is now ready to be used.

Depending on the materials used for mounting, it is recommended to wait for some time until all masonry is dry before lighting a fire.

Attention: never light a fire with the inner plates or refractory stones re- moved.

4.5.Packaging materials

Packaging materials should be disposed of in a responsible way and in accor- dance with governmental regulations.

2020/2220/2520/2210/2510/2200/2500

12

03.27883.100

Image 12
Contents 2020/2220/2520/2210/2510/2200/2500 Table of contents Safety ForewordIntroduction Principle Installation guideline Preparatory measuresChimney Ventilation Floor, walls Under the applianceFloor round the appliance Walls, ceilingOutside the radiation area of the fireplace PreparationChanging the direction of the door-opening Removing the clapetFitting frame surround Assembling the cold handle Electrical connectionInstallation To be built into a new chimneyTo be built in a existing chimney Finishing Packaging materialsBuildup Existant chimney Instructions for use FuelLighting a fire Burning wood Burning coalAsh removal Extinguishing the fireWeather conditions Maintenance Model Annex 2 Dimensions 2510S 2210S 2220 2520S 2510D 2020S 2520S/2/3 03.27883.100 0608