Weil-McLain CGI-4E manual 7b Start-up operate boiler, Start the boiler, Check system and boiler

Page 34

GOLD CGi-4E Gas-Fired Water Boiler — Boiler Manual

7b Start-up — operate boiler

DO NOT proceed with boiler operation unless boiler and system have been filled with water and all instructions and procedures of previous manual sections have been completed. Failure to do so could result in severe personal injury, death or substantial property damage. Before start- ing the boiler, do the follow- ing:

Read manual Section 9 and the Operating instruction procedure applicable for the gas valve supplied on the boiler (Section 9c).

Verify the boiler and system are full of water.

Verify the Start-up prepa- ration procedures of Sec- tion 7 have been complet- ed.

Start the boiler

Follow the Operating instructions from Section 9c to start the boiler.

If you discover evidence of any gas leak, shut down the boiler at once. Find the leak source with bubble test and repair im- mediately. Do not start boiler again until corrected. Failure to comply could result in se- vere personal injury, death or

substantial property damage.

Eliminate all system leaks.

Continual fresh makeup water will reduce boiler life. Minerals can build up in sections, reduc- ing heat transfer, overheating cast iron, and causing section failure.

Glycol or antifreeze leaks

around the boiler may result in fire, causing severe personal injury, death or substantial property damage.

Do not use petroleum - based cleaning or sealing

compounds in boiler system. Severe damage to boiler will occur, resulting in substantial property damage.

See Section 7c if boiler fails to start.

Check system and boiler

1.Check system piping for leaks. If found, shut down boiler and repair immediately.

2.Vent air from system using manual vents. Air in the system will interfere with circulation and cause heat distribution problems and noise.

3.Inspect vent system thoroughly for signs of deterioration from corrosion, physical damage or sagging. In addition — Check for gas-tight seal at every connection and seam.

Venting system must be sealed gas-tight to prevent flue gas spillage and carbon monoxide emissions which will result in severe personal injury or death.

4.Check around the boiler for gas odor following the procedure of Section 7a of this manual.

5.Verify operation per Section 7b. Perform check-outprocedure in Section 8, and fill in the Installation and service certificate on the same page.

34

Part Number 550-110-711/1108

 

Image 34
Contents GOLDCGi-4E How it works Gold CGi-4EGas-Fired Induced-Draft Water Boiler Contents Please read before proceeding Before locating the boiler, check the following 1a Prepare boiler location codes & checklistInstallations must follow these codes Check for nearby connection to1b Prepare boiler location clearances 1c Prepare boiler location vent system When removing boiler from an existing common vent systemChimney or vent require- ments Products to avoid 1d Prepare boiler location air contaminationRemove contaminants permanently Areas likely to have contaminantsAir opening options 1e Prepare boiler location air openingsAir openings must be provided Two openings Air supply from inside the buildingSingle air opening option Exhaust fans and air moversMotorized air dampers Exception for large spacesPlace boiler/crate near position 2a Prepare boiler placement & setupOrifice replacement procedure Inspect orifices and burnersDrain and remove fittings 2b Prepare boiler pressure testHydrostatic pressure test Prepare boiler for testCGi-4E venting methods Chimney draft or Direct exhaust 3a Venting general informationVenting chimney draft venting Chimney draft ventingDo not exceed data in Table 3c Venting Direct exhaust componentsObtain vent system components Do not mix components3d Venting direct exhaust vent starter 3e Venting direct exhaust termination Do not wrap or insulate vent pipe or fittingsDo not mix types or manufacturers of vent materi- als 3f Venting direct exhaust installationSlip connector for Saf-T Vent Use their specified sealant. Do not use screwsUsing any termination other than one of those shown 4a Water piping general information Diaphragm-type or bladder- type expansion tank Figure 4b Water piping single-zone systemClosed-type expansion tank 4c Water piping multiple zones Piping multiple zonesBoiler isolation balancing valves System or zone circulator Zone valve Drain valveValve adjustment 4d Piping low temperature systemsTemperature gauges Primary/secondary preferred bypass piping methodBlend temperature gauge Valve adjustment BOILER-bypass piping methodBoiler-bypass piping Zoning with SYSTEM-bypass piping method System or zone circulator 4e Water piping refrigeration systemPrevent chilled water from entering boiler Chilled medium from entering boiler. See forNatural Gas Connecting gas supply piping to boilerGas piping Propane GasWiring connections Field wiringElectrical installation must comply with ThermostatCheck for gas leaks Freeze protection when used7a Start-up preparation Determine if water treatment is neededInspect base insulation Fill the system with waterInspect system water piping Close manual and automatic air vents and boiler drain cockStart the boiler 7b Start-up operate boilerCheck system and boiler Pilot burner flame Figure Check burner flamesMain burner flame Figure Check for High limit switch set below boiler water tempera- ture?7c Start-up if boiler doesn’t start Gas not turned on at meter or boiler?Check-out procedure checklist 9a Operation sequence Boiler is now in the off cycleGold CGi-4E Gas-Fired Water Boiler Boiler Manual 9b Operation wiring diagrams Wiring diagramOperating instructions CMR 5.082a 1 through Addendum Instruction for Commonwealth of MassachusettsOne-half 1/2 inch in size, GAS Vent Directly be CMR 5.082a1 through10a Service and maintenance schedule Verify Proper Operation After Servicing10b Service and maintenance annual start-up Condensate drain system 10b Service & maintenance annual start-upBurners and base Inducer motorAir vents and air elimination Gas pipingCold fill and operating pressures Limit controls and cutoffsBoiler relief valve Safety relief valves should be reinspected AT LeastReview with owner Shut down boilerAir pressure switch 11a Troubleshooting generalBefore troubleshooting Check the following11b Troubleshooting components Control moduleControl module connections 11c Troubleshooting control module lights Chart 1 Troubleshooting Power light statusChart 2 Tstat Circ & Power lights flashing Chart 3 Press Switch & Power lights flashing Chart 4 Flame & Power lights flashing Does blower motor operate? Item 8 , Verify Sequence of operation, , 12a Replacement parts Section assembly Base Jacket Trim Controls12b Replacement parts section assembly Description Weil-McLain Number Part number12c Replacement parts base Base assemblyDescription Weil-McLain Part number 12d Replacement parts jacket Jacket assemblyBoiler 12e Replacement parts trim Part number12f Replacement parts controls Propane gas components13a Dimensions Width13b Ratings DOEUse Niosh certified dust respirator N95 Handling ceramic fiber and fiberglass materialsBreathing Fresh air

CGI-4E specifications

The Weil-McLain CGI-4E is a standout in the realm of commercial boilers, designed to meet the rigorous demands of a variety of heating applications. This gas-fired cast iron boiler exemplifies durability, efficiency, and performance, making it a popular choice in various commercial settings, including schools, hospitals, and office buildings.

One of the main features of the CGI-4E is its cast iron construction. Cast iron has long been favored for its excellent heat retention and distribution capabilities, leading to improved overall efficiency. The boiler is designed to maximize heat output while minimizing energy consumption. This characteristic is especially beneficial for businesses seeking to lower their energy costs without sacrificing comfort.

In terms of efficiency, the Weil-McLain CGI-4E boasts an impressive thermal efficiency rating. Its design incorporates advanced technology, allowing it to achieve an AFUE rating of up to 84%. This efficiency is achieved through features such as a full-modulating burner and a unique heat exchanger design that allows for optimal heat transfer and reduced flue gas temperatures.

The CGI-4E is also remarkable for its versatility. It is offered in a variety of sizes, making it suitable for different heating loads. This flexibility allows for installation in a wide range of environments, adapting easily to both existing and new heating systems. Additionally, the boiler comes with multiple venting options, including direct vent and conventional venting, further enhancing its installation flexibility.

Another standout feature is the integrated boiler control system, which simplifies operation and monitoring. This control system optimizes burner performance and enhances safety features, including automatic shut-off in case of system anomalies. The advanced controls also allow for easy integration with building management systems, enabling better energy management and reduced operational costs.

The CGI-4E also emphasizes ease of maintenance, with service-friendly designs that allow technicians to access components without difficulty. This consideration translates to reduced downtime and lower maintenance costs, ensuring that the boiler operates efficiently over its lifetime.

Overall, the Weil-McLain CGI-4E blends reliability, efficiency, and advanced technology, making it a premier choice for commercial heating needs. Its cast iron construction, impressive efficiency ratings, versatile installation options, and user-friendly controls solidify its reputation as a leading boiler solution in the industry.