Weil-McLain CGI-4E manual 11a Troubleshooting general, Before troubleshooting, Check the following

Page 48

GOLD CGi-4E Gas-Fired Water Boiler — Boiler Manual

11a Troubleshooting — general

Label all wires prior to disconnection when servicing controls. Wiring errors can cause improper and dangerous operation.

Never jumper (bypass) rollout thermal fuse ele- ment or any other device except for momentary testing as outlined in Troubleshooting Charts. Severe personal injury, death or substantial

property damage can result.

Before troubleshooting:

1.Have the following items:

a.Voltmeter that can check 120 VAC and 24 VAC.

b.Microammeter with a minimum scale range of 0-25.

c.Continuity checker.

d.U-tube manometer.

2.Check for 120 VAC (minimum 102 VAC to maximum 132 VAC) to boiler.

3.Make sure thermostat is calling for heat and contacts (including appro- priate zone controls) are closed. Check for 24 VAC between thermostat wire nuts and ground.

Check the following:

1.Wire connectors to control module are securely plugged in at module and originating control.

2.Air pressure switch hoses are properly and securely plugged in and are not damaged.

3.Verify gas supply pressure:

a.With boiler OFF — 13” w.c. maximum natural or propane gas pressure upstream of gas valve.

b.With boiler ON — Upstream: 5” w.c. minimum natural gas pres- sure or 11” w.c. propane gas pressure upstream of gas valve.

4.Verify gas manifold pressure (downstream of gas valve):

a.Natural gas:

Manifold pressure, high fire: 3.50” w.c.

Manifold pressure, low fire: 0.90” w.c. while in low fire at start-up (60 seconds)

b.Propane gas:

Manifold pressure, high fire: 10.0” w.c.

Manifold pressure, low fire: 3.50” w.c. while in low fire at start-up (60 seconds)

c.If necessary, adjust gas pressure on the gas valve as shown below. After adjustments, refer to page 35 to check the flame.

High-fire gas pressure adjustment

Low-fire gas pressure adjustment

Honeywell VR8204Q two-stage gas valve

48

Air pressure switch

Make sure boiler water temperature is 100 °F or cooler before starting proce- dure to obtain appropriate readings.

The boiler will not operate correctly un- less pressure switch hoses are correctly located. The red hose connects from the right side (negative) hose barb to the flue collector. The white hose con- nects from the left side (positive) hose barb of the switch to the connector box (between flue collector and inducer) as shown in Figure 36, page 49.

Check pressure switch setting

1.See Figure 36, page 49, and Table 9.

2.Remove both air pressure switch hoses from air pressure switch.

3.Install tees and tubing as shown in Figure 36, page 49, to inclined manometer.

4.Turn off gas valve and set thermostat to call for heat. Inducer will run but burners will not ignite.

5.Check for 24 VAC between both air pressure switch termi- nals.

Troubleshooting air pressure reading

1.If manometer reading is lower than the setpoint of the switch (see Table 9) — check for possible causes:

blockage in hoses

obstruction in inducer housing outlet

loose inducer wheel on motor shaft

inducer motor not in proper rpm

inducer back plate not sealed properly

blockage in block assembly

blockage in flue pipe or termination

incorrect pressure switch

6.If manometer reading is above the setpoint of the switch (see

Table 9), but there is not 24 VAC between both air pressure switch terminals — replace air pressure switch.

Return to normal operation

When pressure reading is correct and air pressure switch is oper- ating properly — remove tees and reinstall hoses to air pressure switch.

Table 9 Pressure switch setpoint (for elevations above 2,000 ft, contact your local Weil- McLain sales office for details.)

Boiler model number

Inches W.C.

 

 

CGi-4E

1.36

 

 

 

Part Number 550-110-711/1108

Image 48
Contents GOLDCGi-4E How it works Gold CGi-4EGas-Fired Induced-Draft Water Boiler Contents Please read before proceeding 1a Prepare boiler location codes & checklist Installations must follow these codesBefore locating the boiler, check the following Check for nearby connection to1b Prepare boiler location clearances When removing boiler from an existing common vent system 1c Prepare boiler location vent systemChimney or vent require- ments 1d Prepare boiler location air contamination Remove contaminants permanentlyProducts to avoid Areas likely to have contaminants1e Prepare boiler location air openings Air openings must be providedAir opening options Two openings Air supply from inside the buildingExhaust fans and air movers Motorized air dampersSingle air opening option Exception for large spaces2a Prepare boiler placement & setup Orifice replacement procedurePlace boiler/crate near position Inspect orifices and burners2b Prepare boiler pressure test Hydrostatic pressure testDrain and remove fittings Prepare boiler for test3a Venting general information Venting chimney draft ventingCGi-4E venting methods Chimney draft or Direct exhaust Chimney draft venting3c Venting Direct exhaust components Obtain vent system componentsDo not exceed data in Table Do not mix components3d Venting direct exhaust vent starter 3e Venting direct exhaust termination Do not wrap or insulate vent pipe or fittings3f Venting direct exhaust installation Slip connector for Saf-T VentDo not mix types or manufacturers of vent materi- als Use their specified sealant. Do not use screwsUsing any termination other than one of those shown 4a Water piping general information 4b Water piping single-zone system Diaphragm-type or bladder- type expansion tank FigureClosed-type expansion tank 4c Water piping multiple zones Piping multiple zonesBoiler isolation balancing valves System or zone circulator Zone valve Drain valve4d Piping low temperature systems Temperature gaugesValve adjustment Primary/secondary preferred bypass piping methodBlend temperature gauge Valve adjustment BOILER-bypass piping methodBoiler-bypass piping Zoning with SYSTEM-bypass piping method 4e Water piping refrigeration system Prevent chilled water from entering boilerSystem or zone circulator Chilled medium from entering boiler. See forConnecting gas supply piping to boiler Gas pipingNatural Gas Propane GasField wiring Electrical installation must comply withWiring connections ThermostatFreeze protection when used 7a Start-up preparationCheck for gas leaks Determine if water treatment is neededFill the system with water Inspect system water pipingInspect base insulation Close manual and automatic air vents and boiler drain cock7b Start-up operate boiler Start the boilerCheck system and boiler Check burner flames Pilot burner flame FigureMain burner flame Figure High limit switch set below boiler water tempera- ture? 7c Start-up if boiler doesn’t startCheck for Gas not turned on at meter or boiler?Check-out procedure checklist 9a Operation sequence Boiler is now in the off cycleGold CGi-4E Gas-Fired Water Boiler Boiler Manual 9b Operation wiring diagrams Wiring diagramOperating instructions Addendum Instruction for Commonwealth of Massachusetts One-half 1/2 inch in size, GAS Vent Directly beCMR 5.082a 1 through CMR 5.082a1 through10a Service and maintenance schedule Verify Proper Operation After Servicing10b Service and maintenance annual start-up 10b Service & maintenance annual start-up Burners and baseCondensate drain system Inducer motorGas piping Cold fill and operating pressuresAir vents and air elimination Limit controls and cutoffsSafety relief valves should be reinspected AT Least Review with ownerBoiler relief valve Shut down boiler11a Troubleshooting general Before troubleshootingAir pressure switch Check the following11b Troubleshooting components Control moduleControl module connections 11c Troubleshooting control module lights Chart 1 Troubleshooting Power light statusChart 2 Tstat Circ & Power lights flashing Chart 3 Press Switch & Power lights flashing Chart 4 Flame & Power lights flashing Does blower motor operate? Item 8 , Verify Sequence of operation, , 12a Replacement parts Section assembly Base Jacket Trim Controls12b Replacement parts section assembly Description Weil-McLain Number Part number12c Replacement parts base Base assemblyDescription Weil-McLain Part number 12d Replacement parts jacket Jacket assemblyBoiler 12e Replacement parts trim Part number12f Replacement parts controls Propane gas components13a Dimensions Width13b Ratings DOEHandling ceramic fiber and fiberglass materials Use Niosh certified dust respirator N95Breathing Fresh air

CGI-4E specifications

The Weil-McLain CGI-4E is a standout in the realm of commercial boilers, designed to meet the rigorous demands of a variety of heating applications. This gas-fired cast iron boiler exemplifies durability, efficiency, and performance, making it a popular choice in various commercial settings, including schools, hospitals, and office buildings.

One of the main features of the CGI-4E is its cast iron construction. Cast iron has long been favored for its excellent heat retention and distribution capabilities, leading to improved overall efficiency. The boiler is designed to maximize heat output while minimizing energy consumption. This characteristic is especially beneficial for businesses seeking to lower their energy costs without sacrificing comfort.

In terms of efficiency, the Weil-McLain CGI-4E boasts an impressive thermal efficiency rating. Its design incorporates advanced technology, allowing it to achieve an AFUE rating of up to 84%. This efficiency is achieved through features such as a full-modulating burner and a unique heat exchanger design that allows for optimal heat transfer and reduced flue gas temperatures.

The CGI-4E is also remarkable for its versatility. It is offered in a variety of sizes, making it suitable for different heating loads. This flexibility allows for installation in a wide range of environments, adapting easily to both existing and new heating systems. Additionally, the boiler comes with multiple venting options, including direct vent and conventional venting, further enhancing its installation flexibility.

Another standout feature is the integrated boiler control system, which simplifies operation and monitoring. This control system optimizes burner performance and enhances safety features, including automatic shut-off in case of system anomalies. The advanced controls also allow for easy integration with building management systems, enabling better energy management and reduced operational costs.

The CGI-4E also emphasizes ease of maintenance, with service-friendly designs that allow technicians to access components without difficulty. This consideration translates to reduced downtime and lower maintenance costs, ensuring that the boiler operates efficiently over its lifetime.

Overall, the Weil-McLain CGI-4E blends reliability, efficiency, and advanced technology, making it a premier choice for commercial heating needs. Its cast iron construction, impressive efficiency ratings, versatile installation options, and user-friendly controls solidify its reputation as a leading boiler solution in the industry.