Weil-McLain CGA25SPDN manual Fill the system with water, Inspect system water piping

Page 29

GOLD CGa Gas-Fired Water Boiler — Boiler Manual

6a Start-up — preparation (continued)

Fill the system with water

 #LOSEOMANUAL AND AUTOMATIC AIRIVENTS and boiler drain cock.

2.&ILL TO CORRECTRSYSTEM PRESSURE #ORRECTRPRESSURE WILL VARY WITH EACH application. Typical cold water fill pressure for a residential system is 12 psi.

3.0URGEEAIR from system:

A #ONNECTNAAHOSE TO THEHPURGERVALVELSEE drain valves, item , in sug- gested piping diagrams on pages 17 through 23, &IGURE  through &IGURE ). Route hose to an area where water can drain and be seen.

B #LOSEOTHEHBOILER OR SYSTEM ISOLATIONAVALVELBETWEENWTHEHPURGE VALVEL and fill connection to the system.

C #LOSEOZONE ISOLATION VALVES

d.Open quick-fill valve on cold water makeup line.

e.Open purge valve.

f.One zone at a time, open the isolation valves. Allow water to run through the zone, pushing out the air. Run until no noticeable air mOWOIS PRESENT #LOSEOTHEHZONE ISOLATIONAVALVES ANDNPROCEEDCWITHHTHEH next zone. Follow this procedure until all zones are purged.

G #LOSEOTHEHQUICKlLLKWATERTVALVELANDNPURGERVALVELANDNREMOVE THE hose. Open all isolation valves. Watch that system pressure rises to correct cold-fill pressure.

h.After the system has operated for a while, eliminate any residual air by using the manual air vents located throughout the system.

i.If purge valves are not installed in system, open manual air vents in

SYSTEM ONENAT AATIME MBEGINNINGNWITH LOWEST mOORO#LOSEOVENT WHEN water squirts out. Repeat with remaining vents.

4.Open AUTOMATICMAIRIVENT (diaphragm-type or bladder-type expansion tank systems only) one turn.

5.Open other vents:

a.Starting on the lowest floor, open air vents one at a time until water squirts out.

b.Repeat with remaining vents.

6.Refill to correct pressure.

Inspect system water piping

After filling the boiler and system with water, INSPECTPALL PIPING throughout the system for leaks. If found, repair immediately. Repeat this inspection after the boiler has been started and the system has heated up.

,EAKSAMUSTSBE REPAIRED AT ONCE

Failure to do so can damage the boiler, resulting in substantial prop- erty damage.

$O NOTO USES PETROLEUMBASED

CLEANINGN OR SEALINGL COMPOUNDS in boiler system. Severe damage to boiler will occur, resulting in sub- stantial property damage.

Inspect base insulation

The boiler contains ceramic fiber and fiberglass materials. Use care when handling these materials per instructions on PAGE  of this manual. Failure to comply could result in severe personal injury.

&AILURE TO REPLACE damaged insu- lation or reposition insulation can result in a fire hazard, causing severe personal injury, death or substantial property damage.

#HECKETO MAKE SURE BASE INSULATION IS SECURE against all four sides of the base. If insulation is damaged or displaced, DO NOT operate boiler. Replace or reposition insulation.

Part Number 550-101-009/0107



Image 29
Contents Gold CGa Other boiler components How it worksGold CGa Gas-Fired Water Boiler Contents User InstallerPlease read before proceeding Installations must follow these codes 1a Prepare boiler location codes & checklistBefore locating the boiler, check the following Ss .ATIONAL %LECTRICAL%#ODEMinimum dimensions are v Length by Residential garage installations1b Prepare boiler location clearances Foundation1c Prepare boiler location vent system When removing boiler from an existing common vent systemChimney or vent require- ments Line chimney with corrosion-resistant metalProducts to avoid 1d Prepare boiler location air contamination1e Prepare boiler location air openings THEHBOILER #HECKETHEHBOILER PlacementecomparedAir openings must be provided To a,Motorized air dampers Exhaust fans and air moversSingle air opening option Exception for large spacesOrifice replacement procedure 2a Prepare boiler placement and setupPlace boiler/crate near position Inspect orifices and burnersHydrostatic pressure test 2b Prepare boiler pressure testDrain and remove fittings Prepare boiler for testPrepare boiler install vent piping Prepare boiler draft hood & spill switchDraft hood installation Spill switch installationInstallation 2e Prepare boiler vent damper installationDamper blade Minimum clearances3a Water piping general information Closed-type expansion tank 3b Water piping single-zone systemDiaphragm-type or bladder- type expansion tank Figure Piping multiple zones 3c Water piping multiple zones3c Water piping multiple zones Temperature gauges 3d Piping low temperature systemsValve adjustment Figures 13 and 14 only Primary/secondary preferred Bypass piping methodONE Valve $RAINAVALVE LendetemperaturemgaugeOiler Isolation BALANCING Valves BOILER-bypass piping method Valve adjustment13 !IRISEPARATORRANDNAUTOMATICMVENT NIF Used .OTEOTHAT Theh SYSTEM-bypass piping method Gold CGa Gas-Fired Water Boiler Boiler Manual Connect gas supply piping to boiler Gas pipingNatural Gas Propane GasInstallation must comply with Field wiringWiring connections Ational %LECTRICAL #ODE !.3.&0! LATESTA EDI- tion6a Start-up preparation Freeze protection when usedCheck for gas leaks Determine if water treatment is needed Verify water chemistryInspect system water piping Fill the system with waterInspect base insulation  #LOSEOZONE Isolation VALVESSs 6ERIFY the Boilerhand System are Full Oflwater 6b Start-up operate boilerEfore STARTINGSTHEABOILER NDO the FOLLOWING Start the boiler 6c Start-up if boiler doesn’t startCheck system and boiler Check forCheck burner flames 6d Start-up verify operationCheck vent damper operation Check vent system operationOO Utton Onospilloswitch PUSHEDLIN Check-out procedure checklistOO !IRIPURGED FROMGSYSTEM  #ALCULATEUGASAINPUTMain ignited until thermostat circuit or limit circuit 8a Operation standing pilot boilers8b Lighting instructions CGa-25 to CGa-8 8b Lighting instructions CGa-25 to CGa-8 GAS mOWSSTO Pilot or Main GAS VALVE 9a Operation spark-ignited pilot boilers#ALL for HEATHthermostat circuit closes Damper is de-energized, and cycles to closed posi9a Operation spark-ignited pilot system Schematic wiring diagram Spark-ignited pilot systemLadder wiring diagram Spark-ignited pilot system 9b Operating instructions CGa-25 to CGa-8 9b Operating instructions CGa-25 to CGa-6 9b Operating instructions CGa-25 to CGa-6 9b Operating instructions CGa-7 to CGa-8 Owner maintenance 10a Service and maintenance scheduleService technician 10b Service & maintenance annual start-up Repair.URNERSNANDRBASE Boiler heating surfacesOiled-bearing circulators Cold fill and operating pressures Gas pipingAir vents and air elimination Limit controls and cutoffsFollowing installation, the valve Safety relief valves should beReview with owner Boiler relief valve #ONTINUITY CHECKER 11a Troubleshooting procedureBefore troubleshooting Event of vent damper failure Check the followingEffikal or Field Controls damper  ASAPRESSURESChart 1 Standing pilot Boiler will not fire 11b Troubleshooting standing pilot boilersControl indicator lights Lockout modes 11c Troubleshooting spark-pilot boilersControl indicator lights NON-LOCKOUT modes Troubleshooting the control module11c Troubleshooting spark-pilot boilers Tstat Circ Usually indicates 48 VAC on thermostat circuit stray voltage Chart 4 Spark-ignited pilot Damper light flashing Chart 5 Spark-ignited pilot Flame & Power lights flashing Item 8 , Verify Sequence Section assembly Base Jacket Trim Controls 12a Replacement partsPart number 12b Replacement parts section assemblyIgure R Base assembly, manifold, orifices and burners 12c Replacement parts baseIgure R Jacket assembly 12d Replacement parts jacketIgure R Trim assembly 12e Replacement parts trimIgure R Gas control assembly 12f Replacement parts controls13a Dimensions DOE 13b RatingsJobosite CONDITIONS #URRENT ./3 Recommen Handling ceramic fiber and fiberglass materialsREATHING H&RESHGAIR Ss 5SES E./3 .CERTIlED Dust Crespirator E. 

CGA25SPDN specifications

The Weil-McLain CGA25SPDN is a high-efficiency gas-fired boiler designed to deliver dependable heating performance while maintaining a strong focus on energy savings and user-friendly operation. Ideal for residential applications, this boiler is engineered to provide consistent warmth and comfort in homes with various heating demands.

One of the main features of the CGA25SPDN is its durable construction. Built with high-quality materials, this boiler is designed to withstand the rigors of frequent operation while maximizing longevity. It features an advanced cast iron heat exchanger that efficiently transfers heat to the water, resulting in lower energy costs and improved overall performance.

Efficiency is a key characteristic of the Weil-McLain CGA25SPDN. Its design promotes efficient combustion, allowing for a higher Annual Fuel Utilization Efficiency (AFUE) rating. With an AFUE rating of up to 82%, this boiler ensures that more of the fuel used is converted into usable heat, which translates to reduced energy bills for homeowners.

The boiler exhibits a user-friendly control system that allows for easy operation and maintenance. It comes equipped with an integrated vent damper that maximizes efficiency by reducing heat loss during standby periods. Additionally, the CGA25SPDN features an adjustable thermostat, enabling homeowners to customize their heating preferences easily.

Another significant feature of the CGA25SPDN is its versatility. The boiler is compatible with various heating applications, including hot water heating systems and home heating configurations. This adaptability makes it a great choice for both new installations and retrofitting existing systems.

Safety is always a concern with gas-fired appliances, and the Weil-McLain CGA25SPDN addresses this through its advanced safety mechanisms. The boiler incorporates safety controls that prevent overheating and ensure proper operation, providing peace of mind to homeowners.

In summary, the Weil-McLain CGA25SPDN stands out as a reliable and efficient heating solution for residential settings. With its durable construction, high-efficiency performance, user-friendly controls, and impressive safety features, it is an exceptional choice for those seeking a dependable gas-fired boiler that meets modern heating demands while keeping energy costs in check. Homeowners can trust the Weil-McLain CGA25SPDN for warmth and comfort through the cold months.