Weil-McLain CGA25SPDN 2a Prepare boiler placement and setup, Place boiler/crate near position

Page 12

GOLD CGa Gas-Fired Water Boiler — Boiler Manual

2a Prepare boiler — placement and setup

Place boiler/crate near position

1.,EAVE BOILEROIN CRATE AND ON PALLET until installa- tion site is ready.

2.Move entire crate and pallet next to selected loca- tion.

3.Remove crate. ,EAVE BOILEROON PALLET

4.Remove boiler from pallet as follows:

a.Tilt left side of boiler up and place a board under left legs.

b.Tilt boiler the other way and place a board under right legs.

c.Slide boiler backwards off pallet and into posi- tion.

$O NOTODROP BOILER OR BUMP JACKET ON mOOR OR PALLETL$AMAGE TO BOILER

can result.

 #HECKELEVEL

a.Shim legs, if necessary.

B $O NOT ALTER LEGS

Inspect orifices and burners

1.Remove front jacket door. Remove base access panel (See &IGURE , item , page 62).

 #HECKE FORO CORRECTLYSIZED MANIFOLD ORIlCES 3EEE 4ABLE  below for sizing. (The orifice size is stamped on the orifice spud barrel.)

4ABLE  Manifold orifice sizing

Location

Natural gas

 

 

 

U. S.

0-2,000 ft

over 2,000 ft

2.00 mm

(Note 1)

 

Canada

0-2,000 ft

2,000-4,500

 

2.00 mm

1.90 mm

 

 

 

Location

Propane gas

 

 

 

U. S.

0-2,000 ft

over 2,000 ft

1.30 mm

(Note 1)

 

Canada

0-2,000 ft

2,000-4,500

 

1.30 mm

1.20 mm

 

 

 

Note 1: For elevations above 2,000 feet, contact your local Weil-McLain sales office for details.

#ORRECTLYSIZEDL MANIFOLD ORIFICES

must be used. Failure to do so will result in severe personal injury, death or substantial property dam- age.

3. Level and straighten burners.

"URNERSNMUST BE PROPERLY SEATED IN slots in burner rest with their open- ings face up. Main burner orifices must inject down center of burner. Failure to properly seat burners will result in severe personal injury, death or substantial property dam- age.

4. Reinstall access panel.

$O NOTOOPERATERBOILER WITHOUTHAC- cess panel secured in place. Failure to comply could cause momentary flame rollout on ignition of main flame, resulting in possible fire or personal injury hazard.

Orifice replacement procedure

(when required)

1.Remove access panel.

2.On gas manifold, mark location of main burner with attached pilot assembly.

3.Remove main burner with attached pilot assembly from manifold. Remove all remaining burners.

4.Remove and discard all main burner orifices in gas manifold.

5.Apply a small amount of pipe dope to each of the new orifices and install in the manifold. Make sure the orifices are aligned correctly, not cross-threaded in the manifold tappings.

Use only pipe dope compatible with propane gas, even if boiler is to be operated on natural gas. Failure to comply could result in severe per- sonal injury, death or substantial property damage.

6.Reinstall main burner with attached pilot assembly at location marked on gas manifold. Reinstall all remaining burners.

7.Follow check-out procedure, Section , page 33.

12

Part Number 550-101-009/0107

Image 12
Contents Gold CGa How it works Other boiler componentsGold CGa Gas-Fired Water Boiler Contents Installer Please read before proceedingUser 1a Prepare boiler location codes & checklist Installations must follow these codesBefore locating the boiler, check the following Ss .ATIONAL %LECTRICAL%#ODEResidential garage installations Minimum dimensions are v Length by1b Prepare boiler location clearances FoundationWhen removing boiler from an existing common vent system 1c Prepare boiler location vent systemChimney or vent require- ments Line chimney with corrosion-resistant metal1d Prepare boiler location air contamination Products to avoidTHEHBOILER #HECKETHEHBOILER Placementecompared 1e Prepare boiler location air openingsAir openings must be provided To a,Exhaust fans and air movers Motorized air dampersSingle air opening option Exception for large spaces2a Prepare boiler placement and setup Orifice replacement procedurePlace boiler/crate near position Inspect orifices and burners2b Prepare boiler pressure test Hydrostatic pressure testDrain and remove fittings Prepare boiler for testPrepare boiler draft hood & spill switch Prepare boiler install vent pipingDraft hood installation Spill switch installation2e Prepare boiler vent damper installation InstallationDamper blade Minimum clearances3a Water piping general information 3b Water piping single-zone system Diaphragm-type or bladder- type expansion tank FigureClosed-type expansion tank 3c Water piping multiple zones Piping multiple zones3c Water piping multiple zones 3d Piping low temperature systems Temperature gaugesValve adjustment Figures 13 and 14 only Primary/secondary preferred Bypass piping methodLendetemperaturemgauge Oiler Isolation BALANCING ValvesONE Valve $RAINAVALVE Valve adjustment BOILER-bypass piping method13 !IRISEPARATORRANDNAUTOMATICMVENT NIF Used .OTEOTHAT Theh SYSTEM-bypass piping method Gold CGa Gas-Fired Water Boiler Boiler Manual Gas piping Connect gas supply piping to boilerNatural Gas Propane GasField wiring Installation must comply withWiring connections Ational %LECTRICAL #ODE !.3.&0! LATESTA EDI- tionFreeze protection when used 6a Start-up preparationCheck for gas leaks Determine if water treatment is needed Verify water chemistryFill the system with water Inspect system water pipingInspect base insulation  #LOSEOZONE Isolation VALVES6b Start-up operate boiler Efore STARTINGSTHEABOILER NDO the FOLLOWINGSs 6ERIFY the Boilerhand System are Full Oflwater 6c Start-up if boiler doesn’t start Start the boilerCheck system and boiler Check for6d Start-up verify operation Check burner flamesCheck vent damper operation Check vent system operationCheck-out procedure checklist OO Utton Onospilloswitch PUSHEDLINOO !IRIPURGED FROMGSYSTEM  #ALCULATEUGASAINPUT8a Operation standing pilot boilers Main ignited until thermostat circuit or limit circuit8b Lighting instructions CGa-25 to CGa-8 8b Lighting instructions CGa-25 to CGa-8 9a Operation spark-ignited pilot boilers GAS mOWSSTO Pilot or Main GAS VALVE#ALL for HEATHthermostat circuit closes Damper is de-energized, and cycles to closed posiSchematic wiring diagram Spark-ignited pilot system 9a Operation spark-ignited pilot systemLadder wiring diagram Spark-ignited pilot system 9b Operating instructions CGa-25 to CGa-8 9b Operating instructions CGa-25 to CGa-6 9b Operating instructions CGa-25 to CGa-6 9b Operating instructions CGa-7 to CGa-8 10a Service and maintenance schedule Service technicianOwner maintenance 10b Service & maintenance annual start-up Boiler heating surfaces Oiled-bearing circulatorsRepair.URNERSNANDRBASE Gas piping Cold fill and operating pressuresAir vents and air elimination Limit controls and cutoffsSafety relief valves should be Following installation, the valveReview with owner Boiler relief valve11a Troubleshooting procedure Before troubleshooting #ONTINUITY CHECKER Check the following Event of vent damper failureEffikal or Field Controls damper  ASAPRESSURES11b Troubleshooting standing pilot boilers Chart 1 Standing pilot Boiler will not fire11c Troubleshooting spark-pilot boilers Control indicator lights Lockout modesControl indicator lights NON-LOCKOUT modes Troubleshooting the control module11c Troubleshooting spark-pilot boilers Tstat Circ Usually indicates 48 VAC on thermostat circuit stray voltage Chart 4 Spark-ignited pilot Damper light flashing Chart 5 Spark-ignited pilot Flame & Power lights flashing Item 8 , Verify Sequence 12a Replacement parts Section assembly Base Jacket Trim Controls12b Replacement parts section assembly Part number12c Replacement parts base Igure R Base assembly, manifold, orifices and burners12d Replacement parts jacket Igure R Jacket assembly12e Replacement parts trim Igure R Trim assembly12f Replacement parts controls Igure R Gas control assembly13a Dimensions 13b Ratings DOEHandling ceramic fiber and fiberglass materials Jobosite CONDITIONS #URRENT ./3 RecommenREATHING H&RESHGAIR Ss 5SES E./3 .CERTIlED Dust Crespirator E. 

CGA25SPDN specifications

The Weil-McLain CGA25SPDN is a high-efficiency gas-fired boiler designed to deliver dependable heating performance while maintaining a strong focus on energy savings and user-friendly operation. Ideal for residential applications, this boiler is engineered to provide consistent warmth and comfort in homes with various heating demands.

One of the main features of the CGA25SPDN is its durable construction. Built with high-quality materials, this boiler is designed to withstand the rigors of frequent operation while maximizing longevity. It features an advanced cast iron heat exchanger that efficiently transfers heat to the water, resulting in lower energy costs and improved overall performance.

Efficiency is a key characteristic of the Weil-McLain CGA25SPDN. Its design promotes efficient combustion, allowing for a higher Annual Fuel Utilization Efficiency (AFUE) rating. With an AFUE rating of up to 82%, this boiler ensures that more of the fuel used is converted into usable heat, which translates to reduced energy bills for homeowners.

The boiler exhibits a user-friendly control system that allows for easy operation and maintenance. It comes equipped with an integrated vent damper that maximizes efficiency by reducing heat loss during standby periods. Additionally, the CGA25SPDN features an adjustable thermostat, enabling homeowners to customize their heating preferences easily.

Another significant feature of the CGA25SPDN is its versatility. The boiler is compatible with various heating applications, including hot water heating systems and home heating configurations. This adaptability makes it a great choice for both new installations and retrofitting existing systems.

Safety is always a concern with gas-fired appliances, and the Weil-McLain CGA25SPDN addresses this through its advanced safety mechanisms. The boiler incorporates safety controls that prevent overheating and ensure proper operation, providing peace of mind to homeowners.

In summary, the Weil-McLain CGA25SPDN stands out as a reliable and efficient heating solution for residential settings. With its durable construction, high-efficiency performance, user-friendly controls, and impressive safety features, it is an exceptional choice for those seeking a dependable gas-fired boiler that meets modern heating demands while keeping energy costs in check. Homeowners can trust the Weil-McLain CGA25SPDN for warmth and comfort through the cold months.