D O O R S
T.Attach the aluminum sill support or wood blocking to the exterior of the box plate to support the edge of the door sill. Place the sill support flush with the subfloor.
1TP |
A L L
L D D O O R S
2 PREPARE THE DOOR FOR INSTALLATION
TWO OR MORE PEOPLE WILL BE REQUIRED TO HANDLE THE PANEL AND FRAME SAFELY.
A.Remove plastic wrap and cardboard packaging from door. Do not remove plastic shipping spacers. The shipping spacers will help keep the door square during installation. Do not unlock or open the door until it is fully fastened.
Note: If grilles or hardware are removed from the door at this time, label them and store them in a protected area.
Standard Brickmould Installation go to Step 3
Applications for Performance Upgrade and HurricaneShield product requires additional clip installation or screw installation. Clip installation prep is included in Step 2B. Screw installation steps are included in Step 5.
For HurricaneShield and Performance
Upgrade Applications:
C E U P G R A D E & H U R R I C A N E S H I E
DIAGRAM FOR
PLACEMENT OF
FRAME SCREWS OR INSTALLATION CLIPS
6"
2B
16"
MAX.
O.C.
6"
DOUBLE OPERABLE | SINGLE FIXED OR OPERABLE |
|
| 2B |
|
|
|
| 2B |
|
|
| 6" |
|
|
|
|
|
|
6" | 16" MAX | 6" | 16" MAX | 6" |
| 6" | 16" MAX | 6" |
|
| |||||||
O.C. |
| O.C. |
| O.C. | ||||
|
|
|
|
|
| |||
|
|
|
| 6" | 6" |
|
| 6" |
|
|
|
| 2B | 2B |
|
| 2B |
|
|
|
| 16" | 16" |
|
| 16" |
|
|
|
| MAX. | MAX. |
|
| MAX. |
|
|
|
| O.C. | O.C. |
|
| O.C. |
|
|
|
| 6" | 6" |
|
| 6" |
6" | 16" MAX | 6" | 16" MAX | 6" |
| 6" | 16" MAX | 6" |
| O.C. | 6" | O.C. |
|
|
| O.C. |
|
|
| 5E |
|
|
|
| 5E |
|
P E R F O R M A N
Screw
Location
Clearance Holes