Thermific® Gas-Fired Boiler

Installation

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Whichever material is used, the termination must point down and must be backed by a metal plate secured to the wall.

Important: The chosen inlet termination must be included in the calculation of the maximum allowable equivalent length. See Section 3.4.5 for equivalent lengths.

Correct rain cap,

Typical incorrect

unrestricted.

rain cap.

If the combustion air inlet duct is routed through the roof, the termination must be either the same type as described for a sidewall installation or a rain cap. The rain cap must be unrestrictive type similar to the illustration below.

3.2.4 Inlet Duct Assembly at the Boiler

Transition

 

 

Damper

 

 

 

 

Round

 

 

 

Duct

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Damper

Housing

(Sidewall installation shown.)

The boiler is equipped with a special collar attached to the air inlet opening on the back of the unit (at the blower housing on Series 700, 1000, and 1200; at the back of the cabinet on Series 1500, 1700 and 2000.). A separate box of accessories is sent with the boiler.

1.Attach the 6 inch diameter end of the custom transition duct and the extension to the collar using a minimum of 4 sheet metal screws spaced approximately at 90 degree intervals. This joint must then be wrapped with an aluminum tape backed on the contact side with an adhesive. Do not use "duct tape."

Important: do not insulate the transition duct or extension.

Roof

Transition

Duct

Round

Damper

90o Elbow

Damper

Housing

Refer to Section 3.2 for instructions for installing and wiring the auxiliary control panel; it is required if the optional inlet damper is used.

3.2.4.1 Sealing PVC Duct Tubing to the Inlet Duct

Apply a 3/4" wide x 1/8" thick gasket to the outside surface edge of the entire circumference of the transition duct (or extension). A closed cell foam rubber gasket with pressure sensitive adhesive works very well. Insert 3/4" of the transition duct into the PVC duct tubing so that the gasket lines up with the edge of the PVC tubing. Lay an approximate 3/8" wide bead of GE RTV-102 silicone sealant, or equivalent, along the gap between the gasket and inside wall of the tubing. Allow the silicone sealant to

(Roof installation shown.)

cure for 24 hours. The cure time can be shortened

Page 4

Image 6
Contents Direct Vent What to do if you smell gas Introduction Direct Vent/Sealed Combustion SystemFresh Air System Safety Roof Exhaust Vent Sidewall Air InletInlet Duct InstallationSystem Design Pressure Drop Air Inlet TerminationInlet Duct Assembly at the Boiler Unrestricted Rain capInlet Damper and Auxiliary Control Panel optional System Design Materials, Length, Size, and ConstructionFlue Gas Outlet Duct Exhaust Vent Connection at the Boiler Flue Gas TerminationSidewall Installations Equivalent Length of FittingsMinimum Clearance for Boiler Connections Combustion Min Air Inlet Above Snow line Flue Gas OutletOperation Round Vent Damper 90o ElbowMaintenance Combustion Air Requirement, ScfmWiring Diagrams ON-OFFSERIES 700, 1000Logic Diagram 1A ON-OFFIRI Series 700, 1000 1A ON-OFFIRI Series 700, 1000 1B LO-HILO 1B LO-HILO 1C LO-HI-LOIRI 1C LO-HI-LOIRI 1D ON-OFFSERIES 1500, 1700 1D ON-OFFSERIES 1500, 1700 1E ON-OFFIRI Series 1500, 1700 1E ON-OFFIRI Series 1500, 1700 On-Off Auxiliary Control Panel