Smith Cast Iron Boilers GT Series manual GT Installation and Operation Instructions

Page 23

GT INSTALLATION AND OPERATION INSTRUCTIONS

Page 23

Multiple Zone Pump Controller

Models Taco SR504, Argo ARM 861 Series

Figure 32 shows the basic multiple zoned system using circulating pumps. This wiring system is used with the piping as shown in Figures 25.

When there is a call for heat the room thermostat closes the circuit between the TT terminals on the pump controller. The controller energizes the appropriate circulating pump and closes the circuit between terminals T and C on the Sentry 2100 control. The Sentry 2100, provides power to the primary pump via terminal C1. Once these pumps are on, the burner fires.

Once the room thermostat is satisfi ed, it breaks power to the TT terminal of the pump controller de-energizing the XX contacts. The circuit between terminals T and C opens shutting down the pumps and the burner.

Figure 32 - Multiple Zone Pump Controller, Models Taco SR504, Argo ARM 861 Series

Image 23
Contents North ELM Street WESTFIELD, MA 01085 TEL 562-9631 FAX 413 Gama Energy StarBoiler Ratings & Capacities ContentsBefore YOU Start Input vs Elevation Graph Boiler LocationGeneral Venting Guidelines Combustion AIRHorizontal Direct Vent Systems Horizontal Terminal Locations Separate Air Intake and Vent TerminalsWall Penetration Detail External Air Intake and Vent Systems Vertical Direct Vent Systems Debris Screen InstallationConcentric Through the Roof Condensate DrainGeneral Plumbing Guidelines Relief Valve Piping Pressure Relief ValveLow Water Cut Off, Lwco Multiple Boiler Primary LoopPrimary Loop Plumbing Secondary Loop PlumbingSingle Boiler with Indirect Hot Water Heater Multiple Boiler Installation Multiple Zones Using Circulators Multiple Zones Valves with Bypass Valve Gas Pipe Capacity Equivalent Pipe Length ChartGAS Supply Piping Thermostat Installation Electrical Wiring Multiple Zones w/ Taco Valve Controller Models ZVC403 to ZVC Multiple 4 Wire Zone Valves GT Installation and Operation Instructions GT Installation and Operation Instructions Boiler Ladder Diagram Boiler Connection Diagram Sentry Display Sentry 2100T ControllerBoiler Modulation Indirect Water HeatersOutdoor Sensor 10K Setting Sentry 2100T controlRecommended Settings Recommend System Temperatures=140.6 F, 42C Determining Reset Temperature HICalc= 200F, 93C 70F, 21C /70F, 21C Normal Flue Gas Composition Natural Gas Propane Boiler SET UPOperating Instructions Ignition System Gas Valve Layout, GT-150Operational Flow Chart For Your Safety Read Before Operating Main Burner Flame Boiler Checking & AdjustmentGas Pressure Adjustment Input RateBoiler Maintenance Aquastat High Limit Wall Hung ConversionBefore set-point Trouble ShootingTemperature is Burner shuts offIgnition Sequence Air Switch is OpenAir Switch is Closed Indicates thatBoiler will not stay Two Flashes onFenwal Three Flashes onSentry Controller Creating a noise Residence. This is not a warranty issueHousing Warranty issueGT Installation and Operation Instructions Replacement Parts Exploded View Models GT150 and GT200 Replacement Parts ListReplacement Parts Exploded View Model GT400 GT Installation and Operation Instructions WESTCAST, INC