Crown Boiler BWC070, BWC120, BWC090 installation manual 6c Positioning Vent Terminal Under Overhangs

Page 8

FIGURE 7.6a: LOCATION OF VENT TERMINAL RELATIVE TO WINDOWS, DOORS, GRADE

FIGURE 7.6b: LOCATION OF VENT TERMINAL RELATIVE TO METERS AND FORCED AIR INLETS

FIGURE 7.6c: POSITIONING VENT TERMINAL UNDER OVERHANGS

17

Image 8
Contents Page VII Venting Page Summary of Horizontal Venting Options Horizontal Concentric Venting Vent Option 1,3 Vent Option Manufacturer Vent Size Component Part Number 6c Positioning Vent Terminal Under Overhangs Snorkel Terminal Configuration VENT/ AIR Intake Fitting Equivalent Length 10 Vertical Twin Pipe Vent System Vent Option Removing an Existing Boiler From a Common Chimney Page 21 Dimension L 22 Cutting Outer Pipe 25 Attaching 60/100mm Terminal Section 30a Cuttable Straight Section 31 Cutting Straight Pipe 32a Joining Cuttable Pipe 33a Dimension L, 80/125mm Horizontal Terminal 33c Cutting Inner Pipe of 80/125mm Horizontal Terminal 34 Installation of Snorkel Terminal 35a Dimension H 35b Cutting Vertical Terminal 36 Chimney Chase Installation Assembly of Stainless Steel Venting 47 CORR/GUARD Connection to Vent Collar