Desa CB36P, CB36N operation manual Venting Installation

Page 10

VENTING INSTALLATION

Continued

In each case the offsets must be supported and firestops must be positioned wherever the vent must pass through a sub-floor, ceil- ing joist or an attic overhang. The vent pipe must terminate vertically into a listed type vent cap and extend a sufficient height through an approved roof flashing, roof jack or a roof thimble. At all points the listed clearances must be maintained.

Vent terminations must be located in accor- dance with height and proximity rules of NFPA No. 54 or CAN/CSA B149. These rules apply to vents at 12" diameter or less and require a minimum height in accordance with the roof pitch and a minimum of 8 foot distance from a vertical wall or obstruction (see Figure 11).

If venting horizontally through a side wall be- comes necessary, a listed thimble approved for use with B-type vent must be used. Check with your local codes before venting through a side wall.

Some codes areas allow the use of existing B- type vent systems if the system is at or above the recommended diameter of the flue.

The flue connection must be made using listed B-type connectors and the existing system must be code inspected for damage and proper installation.

It is not recommended that this appliance be common vented with and existing gas burning appliance. However, if it becomes necessary to common vent the appliance. The venting system must be sized and configured in ac- cordance with the common venting guides Appendix G of the current National Fuel Gas Code NFPA No. 54/ANSI Z223.1 and in Canada with CAN/CSA B149.

Note: Before connecting this appliance to an existing vent system or a common venting system consult with your local architect plan- ner, or building official.

 

 

Listed

 

 

 

 

 

 

 

Vent Cap

 

Listed

 

Listed

 

 

 

 

 

 

 

 

 

Vent Cap

 

 

 

 

 

 

Vent Cap

 

 

 

 

 

 

 

Maintain

 

Maintain

 

 

 

 

 

 

Listed

 

 

 

 

 

Listed

 

Clearance

 

 

 

 

 

Clearance

 

 

 

 

 

Maintain

 

 

 

Support Each

Maintain

 

 

 

 

 

 

 

Listed

 

 

 

Lateral At

Listed

 

 

Clearance

 

 

 

Least Every

Clearance

 

 

 

 

 

60

6 Feet

45

 

 

 

 

 

 

12' Min.

 

 

8' Position

 

 

45°

10'

 

 

 

Position

6'

 

 

 

12' Min.

Firestop

Position

45

Firestop

 

12' Min.

 

 

 

 

Firestop

 

 

 

 

 

 

 

 

 

 

 

Maintain

 

Maintain

 

 

Maintain

 

 

Listed

 

Listed

 

 

Listed

 

 

Clearance

 

Clearance

 

 

Clearance

EXAMPLE 1

EXAMPLE 2

EXAMPLE 3

 

Figure 10 - Typical B-Vent Configuration

 

Lowest Listed

Discharge Vent Cap

Opening

 

8 Ft. Min.

Listed

 

Gas

 

Vent

12

H(Min) Height From Roof

 

Roof Pitch

H (Min.)

 

Flat to 6/12

1.0 ft (0.3 m)

 

6/12 to 7/12

1.25 ft (0.38 m)

 

Over 7/12 to 8/12

1.5 ft (0.46 m)

 

Over 8/12 to 9/12

2.0 ft (0.61 m)

 

Over 9/12 to 10/12

2.5 ft (0.76 m)

x

Over 10/12 to 11/12

3.25 ft (0.99 m)

Roof Pitch x/12

Over 11/12 to 12/12

4.0 ft (1.22 m)

Over 12/12 to 14/12

5.0 ft (1.52 m)

Listed Clearance

Over 14/12 to 16/12

6.0 ft (1.83 m)

 

 

Over 16/12 to 18/12

7.0 ft (2.13 m)

 

Over 18/12 to 20/12

7.5 ft (2.27 m)

 

Over 20/12 to 21/12

8.0 ft (2.44 m)

Figure 11 - B-Vent Termination

10

www.desatech.com

117437-01D

Image 10
Contents Models VCB36NE and VCB36PETable of Contents Safety Product Identification Local CodesPre-Installation Preparation Product FeaturesLocation and space requirements Framing and Finishing Packaging and RemovalClearances Ceiling to Louver & Front91.4 cm 36 1/4 92.1 cm 14 3/4 37.5 cmMantel Depth Opening Mantel from14 35.6 cm Installation Precautions Venting InstallationVenting Installation Electrical Supply Connection Checking for Proper VentingRelilef With Strain Relief Installing Optional Wall Mount Switch GWMS2 Installing Optional ControlsHigh Altitude Installation Installing Remote ReceiverRemote Receiver Installing and Activating the Remote ReceiverPlastic Mounting Clips IgnitionMillivolt Wiring Diagram Wiring DiagramsInstallation Items Needed Fireplace InstallationInstalling Gas Piping to Fireplace Location Check GAS TypeConnecting Fireplace to GAS Supply Checking GAS ConnectionsTest Pressures Equal To or Less Than 1/2 Psig 3.5 kPa Pressure Testing Fireplace Gas ConnectionsLouver Panels and Glass Door Equipment Shutoff Valve Gas Meter Gas ValveRemoving/Replacing Glass Door Removing Louver PanelsSpring Clips Glass Panel Frame RailInstalling Logs and Glowing Embers Lighting Instructions Manual Ignition System For your safety Read before lightingOperating Fireplace To Turn OFF GAS To ApplianceElectronic Ignition System Lighting Instructions Manual Lighting ProcedureOptional Wireless Remote Operation RodOn/Off Series Model HRC100 Optional GWMS2 ON/OFF Wall Mounted SwitchOptional Hand-Held Variable Control KnobInspecting Burners Pilot AssemblyAir Adjustment Setting Burner Flame PatternsGlass Door Cleaning and MaintenancePilot and Burners Service Hints SpecificationsTechnical Services Observed Problem Possible Cause Remedy TroubleshootingOr replace ODS/pilot assembly Replace gas regulator Low Natural gas company Burner porting or orifice Pilot is lit or cycles duringHave the vent system CloggedOrifice, adjust air shutter Glass soots Flame impingement on Adjust the log set so LogsClogged burner tube Clean burner tube Burner air adjustmentObserved Problem Possible Cause Remedy Gas leak. See Warning Statement aboveReplacement Parts AccessoriesParts Wire Harness Assembly Burner Assembly Complete See pages 30Damper Assembly Louver AssemblyParts KEY Description QTY Limited Warranty Vent Fireplace WarrantyKeep this Warranty 07/07