INSTALL IN THE CENTRE OF CEILING AT LEAST 300mm FROM LIGHT FITTINGS & WALLS
INTERCONNECT ALL ALARMS
ENSURE MAINS POWER IS CORRECTLY CONNECTED TO L & N TERMINALS ON ALL INTERCONNECTED ALARMS - OTHERWISE UNITS WILL BE DAMAGED
DO NOT FIT ACTUAL ALARMS UNTIL ALL BUILDING WORK IS COMPLETED TO AVOID CONTAMINATION. AFTER CHECKING OPERATION, COVER ALARMS WITH DUST COVER UNTIL REQUIRED FOR USE
DISCONNECT THE ALARMS BEFORE APPLYING HIGH VOLTAGE TO WIRING (FOR INSULATION TESTS)
DO NOT ATTEMPT TO OPEN THE ALARM AS IT IS PERMANENTLY SEALED FOR SAFETY
3