Hearth and Home Technologies 4055-187 owner manual  B. Vent Components Diagrams, 25-3/16

Page 69

B. Vent Components Diagrams (continued)

6-1/2 in.

165 mm

8-3/4 in.

222 mm

 

6-1/2 in.

 

165 mm

 

6-1/2 in.

6 in.

165 mm9-1/4 in.

235 mm

152 mm

 

6-5/8 in.

168 mm

SLP45

45° Elbow

6-5/8 in. 168 mm

9-7/8 in.

251 mm

SLP90-ST - 90° Elbow

Effective

Height/

Length

SLP PIPE

10-7/8 in.

276 mm

6-1/2 in. 165 mm

Effective Height/Length

 

Pipe

inches

mm

 

SLP4

4

102

 

 

 

 

 

SLP6

6

152

 

SLP12

12

305

25-3/16 in.

 

 

 

SLP24

24

610

 

 

 

640 mm

SLP36

36

914

 

SLP48

48

1219

 

SLP6A

2 - 6

51 - 152

 

SLP12A

2 - 12

51 - 305

 

8-7/8 in.

225 mm

SLP-HVS

Horizontal Pipe

Support

8-11/16 in.

220 mm

8-11/16 in. 220 mm

SLP-FS

Ceiling Firestop

1-1/2 in.

38 mmDVP-SLP24 Adapter

12 in.

305 mm

1-1/2 in.

 

 

 

 

12 in.

38 mm

 

 

 

 

305 mm

 

 

 

 

 

SLP-WS

Wall Shield Firestop

8-1/16 in.

205 mm

5-1/2 in. 146 mm

Figure 17.7 SLP Series Vent Components

Heatilator • Novus NDV Series • 4055-187 Rev. V • 1/12

69

Image 69
Contents What to do if you smell gas ModelsHomeowner Reference Information CongratulationsTable of Contents Troubleshooting Limited Lifetime Warranty Limited Lifetime WarrantyWarranty Conditions Listing and Code Approvals Requirements for the Commonwealth of Massachusetts Installation of Carbon Monoxide DetectorsGas Fireplace Safety Operating InstructionsYour Fireplace Remote Controls, Wall Controls and Wall Switches Fixed Glass AssemblyFan Kit optional Clear SpaceFinal inspection by Lighting Instructions IPILighting Instructions Standing Pilot For Your Safety Read Before Lighting Lighting InstructionsFlame Adjustment Control Frequently Asked QuestionsAfter Appliance is Lit Maintenance Tasks-Homeowner Maintenance and ServiceGlass Cleaning Remote ControlGasket Seal and Glass Assembly Inspection Maintenance Tasks-Service TechnicianVenting LogsEither cobrahead or SIT Typical Appliance System Getting StartedDesign and Installation Considerations Tools and Supplies NeededInspect Appliance and Components Select Appliance Location Framing and ClearancesClearances Constructing the Appliance ChaseMantel Legs or Wall Projections Mantel and Wall ProjectionsVent Termination Minimum Clearances Termination LocationsMinimum Clearances for Terminations Approved Pipe Vent Information and DiagramsMeasuring Standards Vent Table KeyTop Vent Horizontal Termination Two 45 Elbows Vent DiagramsOne Elbow Two Elbows Top Vent Horizontal TerminationInstalled Vertically Top Vent Vertical Termination Install Top Vent Flue Visor No Elbow Configura- tions12 ft 3.66 m min 60 ft 18.29 m max Rear Vent Horizontal Termination DVP only Installed Horizontally Rear Vent Vertical Termination DVP only Min Ft 1.83 m max 12 ft 3.66 m min Vent Clearances and Framing Pipe Clearances to CombustiblesWall Penetration Framing Ceiling firestop Must be used between floors and attics Install the Ceiling FirestopFlat Ceiling Installation Install Attic Insulation ShieldTop Vent Appliance PreparationRear Vent Secure and Level the Appliance Assemble Vent Sections DVP only Installing Vent PipeAssemble Slip Sections Assemble Vent Sections SLP Pipe OnlyDisassemble Vent Sections Secure the Vent SectionsInstall Decorative Ceiling Components SLP only Assemble and Install Storm Collar Install Metal Roof FlashingInstall Vertical Termination Cap Install Decorative Wall Components SLP onlyHeat Shield Requirements for Horizontal Termination Install Horizontal Termination Cap Shrouds HHT ShroudsField Constructed Shrouds Mailbox Style Shroud Dimensions Min. Base Dims Fuel Conversion Gas InformationGas Pressure Gas ConnectionStanding Pilot Ignition System Wiring Wiring RequirementsIntellifire Ignition System Wiring Optional Accessories RequirementsWHT Electrical Service and RepairWall Switch Installation for Fan Optional Junction Box InstallationFinishing Facing Material Non-combustible Facing DiagramAppliance Setup Air Shutter Setting Replacing Fixed Glass AssemblyPlace the Rockwool Place the Lava RockInstall Floor Cover Install HoodRemove Screen Protector Unpackage the Hood & Floor CoverHang Screen on Shoulder Screws Close the Screen AssemblyStanding Pilot Ignition System TroubleshootingSymptom Possible Cause Corrective Action TroubleshootingIntellifire Ignition System Pilot flame has been lit Reference Materials Appliance Dimension DiagramDVP45 Vent Components DiagramsDVP-TRAPFL DVP-TVHW DVP-TRAP Description Part Number 25-3/16  B. Vent Components DiagramsSLP-CCS-BK SLP-TRAP Log Set Assembly Service Parts NDV3630, NDV3630iPart number list on following Service Parts StockedAt Depot Service Parts NDV3933, NDV3933i NDV3933, NDV3933i Service Parts NDV4236, NDV4236i NDV4236, NDV4236i Service Parts NDV4842, NDV4842i NDV4842, NDV4842i NDV3630 #15 Standing Pilot Valve AssemblyNDV3933 NDV4236NDV3630I, NDV3933I, NDV4236I, NDV4842I #15 IPI Valve AssemblyIPI Conversion Kits Service Parts NDV3630, NDV3933, NDV4236, NDV4842Model # Description Optional ComponentsWTB36 Catalog # Contact Information