Motorola HE-8000 I, LH4-B800E instruction manual Installing the transformer, Floor installation

Page 25

4. INSTALLATION

4-11-6. Installing the transformer

The transformer can be installed on the floor, on the work table leg (on top of the leg or on the treadle support plates) or underneath the work table.

*Check the power supply rating label on the transformer to confirm that the voltage ratings for the transformer and the control box are identical.

2069Q

2070Q

 

 

 

 

Screw

 

Mounting

(M58)

 

bracket

112.5mm

2071Q

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2072Q

 

(2)

2073Q

 

 

 

 

 

 

(3)

 

 

(2)

 

 

(2)

 

(1)

 

 

 

 

 

 

 

 

 

 

(3)

Washer

Screw (M614)

2074Q

1) Floor installation

Select a suitable location, and place the transformer on the floor in that location.

*Select a location where the transformer will not be an obstruction to people walking past.

2)Table leg installation (on top of table leg) Secure the transformer to the top of the table leg using the mounting bracket and screws.

* The mounting bracket and screws must be obtained separately.

3)Table leg installation (treadle support plates)

1. Remove the screws (1), and then remove the handle (2).

2. Place the transformer onto the two treadle support plates (3) as shown in the illustration, and then secure it with the washers and screws.

* The washers and screws must be obtained sepa- rately.

18

HE-8000

Image 25 Contents
LH4-B800E HE-8000 Safety Instructions Environmental requirements Sewing Moving parts may cause injury Contents Changing Functions Using Name of Each Part Safety devicesSubclass SpecificationsHE-8000 Standard sewing pattern list Special needle plate Optional PartsLeg parts Standing operation pedalRuler Tape guardAuxiliary table Programmer Replacement parts set for 70 mm buttonhole lengthPower table InstallationVertical positioning Installing the flange nut Installing the motorInstalling the control box Installing the bed base Installing the power switchInstalling the head rest Installing the machine headInstalling the operation panel Connecting the ground wire Connecting the cords Connecting the machine head harness Connect the connectors of the feed motor harness Connecting the motor harnessConnecting the power cord Connecting the standing pedal harness option Floor installation Installing the transformerTable leg installation treadle support plates Connecting the cords Installation underneath the work tableInstalling the V-belt Adjusting the belt retainer Installing the belt cover plateAdjusting the finger protector Adjusting the treadle pressure Installing the treadleAdjusting the treadle return pressure Adjusting the treadle strokeInstalling the spool stand Installing the eye guard Lubricating the bed base LubricationLubricating the arm Rotary hook lubrication adjustmentLubricating the rotary hook Installing the belt cover Part names and functions OperationManual mode indicator Test feed mode indicatorProgram mode indicator Select keyBefore starting home position return Home position return preparationOperating the treadle Two pedals + kick pedal Operating the standing pedal optionThree pedals Program initialization condition Program setting methodParameter table Setting items Setting range Unit Default Zigzag width 3.0 mm Setting items Setting range Unit Default Front tack pitch except radial 05 1.00 mm Setting items Setting range Unit No. of stitches in X direction for saw-shaped rear Start backtack width 3.0 mm Saw-shaped underlays Saw-shaped underlay bar tack X stitch no Stitches Rear bar tack tension release timing Stitches Changing program details Bar tacking stitches being cut by the knife 13 17 2118Q 2123Q Triangle Rear tack vector shape programsRectangle Saw-shapeUnderlays sewn together Underlay programsSaw-shape underlay Rectangle underlayCenter knife standard Rear knife Cutter operationCycle program Changing the production counter Changing the lower thread counter setting value Adding patterns created using the BAS-PC/300 Using the program memosProgram memo contents Adding patterns to a P-ROM→ 1 → 2 → 3 →….. → 90→ P1 → P2 → …… → P9 → 1 → 2 → …… Checking the Sewing Pattern 2136Q Correct USE Installing the needleThreading the thread at the sewing start position Threading the upper threadWinding the lower thread Adjusting the bobbin winding amountStitch patterns Threading the bobbin caseWhip stitch plain stitch Purl stitch seal stitchThread tension Thread take-up spring height Thread take-up spring tensionReference thread tension Sewing SewingTo finish sewing in this condition If the emergency stop switch is pressed during sewingEmergency stop If the thread breaks during sewingTo continue sewing from around the location of the breakage Thread breakage before sewing is finishedLower thread counter When resuming sewing in test feed mode or manual modeCleaning MaintenanceCleaning the eye guard Cleaning the control box air inlet portDraining the oil Checking the needle Cleaning the length feed plateNeedle bar height Standard AdjustmentsAdjusting the clearance between needle and hook point Needle and hook timing adjustmentAdjusting the knife installation Adjusting the work clamp pressureAdjusting the upper thread trimming Gradual opening timing adjustment Adjusting the upper thread scissors opening timingScissors fully opening timing adjustment Adjusting the bobbin presser Adjusting the lower thread clamp timingAdjusting the needle up stop position Changing Functions Using the Memory Switches Memory switch table Program Initialization Settings which are initializedInitializing all programs Initializing a single programPanel DIP switches Changing Functions Using the DIP SwitchesDipswa Panel DIP switch tableControl circuit board DIP switches DIP switch inside the control box table Needle plate Gauge Parts ListFor flat cutter Work clamp assy, W/F-G Finger guard Gauge Parts List Cutter Error Code Table Like to keep the program which exceeds the area Troubleshooting TroubleshootingCause Needle is incorrectly installed 15-1, Naeshiro-cho, Mizuho-ku, Nagoya 467-8561, Japan. Phone