3Com DIA3CV1100-02 manual Punch-Down Block Without a Patch Panel

Page 13

Preparing the Site for the VCN Access Concentrator 13

Figure 6 VCN Access Point Punch-Down Block Installation with a Patch Panel

E xtension 1

4-w ire cable

E xtension 2

V C N A ccess P oint (V C N A P)

W ire pair

 

 

connected

 

 

to V C N A P

 

 

 

 

R oom

 

W ire pair not

B asem ent

 

 

 

connected

 

 

to V C N A P

E xt. 2

E xt. 1

 

 

+ D ata

P unch-D ow n B locks

Ext. 1, Ext. 2

 

P B X

V C N AP punch-dow n

P B X punch-dow n

block

block

 

24 w ire pairs

24 w ire pairs

 

E xt. 1

P atch P anel

Note: If there is only one

 

extension in the room, the

 

wires for the second

 

extension are not used

 

and not connected to the

 

PBX punch down block.

The installed patch panel must have 48 wire connectors - 2 for each port.

Installing the VCN To install the VCN AP punch-down block in the absence of a patch panel, Access Point perform the following steps:

Punch-Down Block

Without a Patch

Panel

1Select the wire pairs according to their position in the RJ-11 telephone connector in the rear of the VCN AP. The two outside wires comprise the

Image 13
Contents Visitor and Community Network Access Concentrator 3Com Corporation 5400 Bayfront Plaza Santa Clara, California Contents Page Download Software or Find Documentation VCN Access VCN Access Concentrator Front Panel Describes the front panel VCN AC indicators and connectors Précautions de Preparing the Site Inner wire pair carries both voice and digital date Outer wire pair carries only voice Punch-Down Block Without a Patch Panel VCN Access Point Rear Panel Repeat through for up to 24 telephone lines Mounting the VCN Access Concentrator 19-inch Rack Installing the VCN Access ConcentratorFitting a Bracket for Rack Mounting Back Panel Connections VCN AC Front Panel ConnectionsIs P Pin Assignment for the RJ-21 Connector Line Cards in the VCN Access ConcentratorFemale RJ-21 Connector VCN Access Concentrator Unit Installed Without a Patch Panel Inserting MAC Addresses for VCN Access Concentrator Ports Sequence of ConfigurationManual Procedures for SuperStack II 1100/3300 VCN AC Port and VCN AP MAC Addresses VCN AC Automated Procedures for SuperStack II 1100/3300 ConfApp screen appears Figure Entering the Switch Address Community Parameter Removing Wrong Address For units installed in the USA and Canada Select a flexible Power CordProper Selection Page Troubleshooting LEDs to Solve ProblemsVCN AC Port LED Indications following Post Page Product Specification Product Specification Index VCN AP Glossary Mbps MbaudMiniDIN VacGlossary Glossary 3COM Corporation Limited Warranty Governing LAW EMC Statements