3Com DIA3CV1100-02 manual Installing the VCN Access Concentrator

Page 16

16Visitor and Community Network Access Concentrator Installation Guide

Installing the VCN

Access

Concentrator

Mounting the VCN

Access Concentrator

in the 19-inch Rack

Before installing the VCN AC make sure that:

The unit is accessible and can be connected easily.

Cabling is away from:

Sources of electrical noise such as radios, transmitters and broadband amplifiers

Power lines and fluorescent lighting fixtures

Water or moisture cannot enter the case of the unit.

Air-flow is not restricted around the unit or through the vents in the side of the switch. Make sure you provide a minimum of 2.5 cm (1 inch) clearance between the Ethernet switch and the VCN AC

It is recommended to have a ventilated or air conditioned room.

The VCN AC is within cable reach of both the patch panel and the Ethernet switch for which the unit is to be attached.

Table 2 lists the accessories needed for mounting the VCN AC in the 19-inch rack.

Table 2 The VCN Access Concentrator Accessory Set

No.

Part

Quantity

 

 

 

1

VCN AC unit

1

 

 

 

2

19-inch brackets

2

 

 

 

3

Handles

2

 

 

 

4

Screws for handles

4

 

 

 

5

Screws for brackets

8

 

 

 

In addition to the VCN AC unit, you will find a box containing the cable kit needed to install the VCN AC.

Table 3 lists the cable kit parts.

Table 3 The Cable Kit

No.

Part

Quantity

 

 

 

1

Power Cord

1

 

 

 

2

UTP CAT-5 Patch Cords

24

 

 

 

3

Flat cables (1.5 m each) with

2

 

RJ-21 connectors

 

 

 

 

Image 16
Contents Visitor and Community Network Access Concentrator 3Com Corporation 5400 Bayfront Plaza Santa Clara, California Contents Page Download Software or Find Documentation VCN Access VCN Access Concentrator Front Panel Describes the front panel VCN AC indicators and connectors Précautions de Preparing the Site Inner wire pair carries both voice and digital date Outer wire pair carries only voice Punch-Down Block Without a Patch Panel VCN Access Point Rear Panel Repeat through for up to 24 telephone lines Installing the VCN Access Concentrator Mounting the VCN Access Concentrator 19-inch RackFitting a Bracket for Rack Mounting Back Panel Connections Front Panel Connections VCN ACIs P Line Cards in the VCN Access Concentrator Pin Assignment for the RJ-21 ConnectorFemale RJ-21 Connector VCN Access Concentrator Unit Installed Without a Patch Panel Sequence of Configuration Inserting MAC Addresses for VCN Access Concentrator PortsManual Procedures for SuperStack II 1100/3300 VCN AC Port and VCN AP MAC Addresses VCN AC Automated Procedures for SuperStack II 1100/3300 ConfApp screen appears Figure Entering the Switch Address Community Parameter Removing Wrong Address For units installed in the USA and Canada Select a flexible Power CordProper Selection Page Troubleshooting Problems LEDs to SolveVCN AC Port LED Indications following Post Page Product Specification Product Specification Index VCN AP Glossary Mbaud MbpsMiniDIN VacGlossary Glossary 3COM Corporation Limited Warranty Governing LAW EMC Statements