Installing the VCN Access Concentrator 23

Front Panel Connections

Refer to “Preparing the Site for the VCN Access Concentrator” on page 10 before connecting the VCN AC to Ethernet switch through the front.

Figure 14 displays the infrastructure after the VCN AC has been installed without a patch panel.

Figure 14 The VCN Access Concentrator Unit Installed Without a Patch Panel

V C N AP

R oom

B asem ent

24 w ire pairs

P unch-D ow n B locks

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

V C N AP punch-dow n

block

P B X punch-dow n

block

P B X

Flat C able

V C N AC

T1

E thernet

 

S w itch

R outer

24R J-45 connections betw een the V C N A C and the Ethernet

S w itch

Using RJ-45 connector terminated cables, connect the VCN AC LAN ports to the Ethernet switch.

If your switch is the SuperStack II 1100 or 3300, connect to the front panel ports. If your switch is not the SuperStack II 1100 or 3300, follow the procedures for your switch.

Image 23
Contents Visitor and Community Network Access Concentrator 3Com Corporation 5400 Bayfront Plaza Santa Clara, California Contents Page Download Software or Find Documentation VCN Access VCN Access Concentrator Front Panel Describes the front panel VCN AC indicators and connectors Précautions de Preparing the Site Inner wire pair carries both voice and digital date Outer wire pair carries only voice Punch-Down Block Without a Patch Panel VCN Access Point Rear Panel Repeat through for up to 24 telephone lines Mounting the VCN Access Concentrator 19-inch Rack Installing the VCN Access ConcentratorFitting a Bracket for Rack Mounting Back Panel Connections VCN AC Front Panel ConnectionsIs P Pin Assignment for the RJ-21 Connector Line Cards in the VCN Access ConcentratorFemale RJ-21 Connector VCN Access Concentrator Unit Installed Without a Patch Panel Inserting MAC Addresses for VCN Access Concentrator Ports Sequence of ConfigurationManual Procedures for SuperStack II 1100/3300 VCN AC Port and VCN AP MAC Addresses VCN AC Automated Procedures for SuperStack II 1100/3300 ConfApp screen appears Figure Entering the Switch Address Community Parameter Removing Wrong Address Proper Selection Power CordFor units installed in the USA and Canada Select a flexible Page Troubleshooting LEDs to Solve ProblemsVCN AC Port LED Indications following Post Page Product Specification Product Specification Index VCN AP Glossary Vac MbaudMbps MiniDINGlossary Glossary 3COM Corporation Limited Warranty Governing LAW EMC Statements