Remote Mounting the Setback Control
Measure Wire for Remote Mounting
Step 5: Measure and cut (3) pieces of 18 AWG wire to a sufficient length to reach from the backplate on the Setback Control Junction Box Assembly to the Setback Control Protective Plate. This is shown in Figure 11.
18 AWG
Wire
Figure 11
Label the Wires for Remote Mounting
Step 6: Label the (3) cut wires (A), (B), and (C) respectively. Label both ends of the wires. This is shown in Figure 12. Masking tape can be used to label the wires.
Figure 12
Label Each
Wire