3. Web Server Quick Guide

3

Illustration 3.7: Step 6 of 7: Replication

Step 7 of 7: Inverter startup

The inverter will start automatically when the installation sequence is complete (see the Protect PV Installation Manual), and solar radiation is sufficient.

The startup sequence, including self-test, takes a few minutes.

Illustration 3.8: Step 7 of 7: Inverter startup

To change the setup later, access the inverter via the integrated web interface or the display, at inverter level.

To change the name of the inverter, go to [Setup Inverter details]

To enable master mode, go to [Setup Inverter details]

3.4.Operation

3.4.1.Web Server Structure

The Web Server overview is structured as follows.

8000038784_00_BAL_en / L00410565-01_02

17

Image 18
Contents Protect PV Solar Inverters Contents Introduction Operation Mode Definition IntroductionIntroduction Introduction Display DisplayView Menu Structure View Parameter DescriptionStatus Menu Structure Status Display Functions DescriptionDisplay Production Log Menu Structure Production Log Display Functions DescriptionDisplay Setup Menu Structure Setup Display Functions DescriptionDisplay Setup Sequence Access and Initial SetupAccess via PC Ethernet Interface Web Server Quick GuideSetup Wizard 7 Master setting7 Display language 7 Installed power 7 Time and date7 Country setting 7 Replication Operation Web Server Structure7 Inverter startup Illustration 3.9 Overview Plant, Group and Inverter Views Additional Information Unit View DescriptionTroubleshooting TroubleshootingEvent text Description Remedy Cleaning the Cabinet MaintenanceMaintenance Cleaning the HeatsinkFrance & Africa Italy Czech Republic