American Water Heater VG6250T76NV Series 100, vG6250t76nv Troubleshooting Guidelines

Page 37

TROUBLESHOOTING GUIDELINES

These guidelines should be utilized by a qualified service agent.

37

Image 37
Contents Printed Whenever maintenance adjustment or service is required319339-000 Approvals Safe INSTALLATION, USE and ServiceImportant Definitions General Safety Information General Safety Information Introduction Table of ContentsApproved Carbon Monoxide Detectors Installation of Carbon Monoxide DetectorsSignage ExemptionsReplacement Parts and Deliming Products Typical InstallationElbow Access Door Condensate Hose and Drain PAN Less Severe Burns 2nd & 3rd Degree Mixing ValvesFacts to Consider About the Location Locating the NEW Water HeaterAir REQUIREMENTs Insulation BlanketsConfined Space Unconfined SpaceFresh Air Openings For Confined Spaces Outdoor Air Through Two OpeningsOutdoor AIR Through TWO Vertical Ducts Outdoor AIR Through TWO Horizontal DuctsAIR from Other Indoor Spaces Chemical Vapor Corrosion Installing the NEW Water HeaterWater Piping Space Heating and Potable Water SystemThermal Expansion Temperature-Pressure Relief ValveValve and Pipe Insulation Gas Piping High Altitude InstallationFilling the Water Heater Sediment TrapsVenting Vent Pipe AssemblyVent Pipe Termination Termination Clearances Sidewall Power VentCondensate Planning the Vent SystemBreathing Hazard Carbon Monoxide Gas Installation of Vent System Blower Assembly InstallationVent Terminal INSTALLATION, Sidewall Power Vent Wiring Schematic Figure Sequence of INSTALLATIONS, FigureVent Termination Figure Installation of Vertical Vent System Installation of Vent SYSTEM, SidewallVertical VAA Installations Recommended Vent Attenuation Assembly InstallationInch vent Vertical VAA Installations Recommended BRUSH* Size for Primer Cement Applications Vent Pipe PreparationStep E Step BStep F Step GPage GAS Control Valve Front View Temperature RegulationFor Your Information Periodic MaintenanceStart UP Conditions Operational ConditionsBurner Operation and Inspection Burner CleaningHousekeeping Anode ROD InspectionDraining and Flushing Temperature-Pressure Relief Valve TestTo Drain the Water Heater Storage Tank To Flush the Water Heater Storage TankLeakage Checkpoints Service Repair Parts List Trouble Shooting Troubleshooting GuidelinesLED Status Problem Solution LED Status Problem Solution Troubleshooting Guidelines Troubleshootinotesg Guidelines Fill in Warranty and Keep for Future Reference Limited Warranty
Related manuals
Manual 40 pages 53.76 Kb