LEGEND

MULTI FLUE - (2 UNITS) WITH VERTICAL STORAGE TANK

WARNING: THIS DRAWING SHOWS SUGGESTED PIPING CONFIGURATION AND OTHER DEVICES; CHECK WITH LOCAL CODES AND ORDINANCES FOR ADDITIONAL REQUIREMENTS.

39

PIPE T&P TO

PIPE T&P TO

OPEN DRAIN

OPEN DRAIN

TEMPERATURE & PRESSURE RELIEF VALVE

PRESSURE RELIEF VALVE

CIRCULATING PUMP

TANK TEMPERATURE CONTROL

DRAIN

HOT WATER

TO FIXTURES

FULL PORT BALL VALVE

CHECK VALVE

TEMPERATURE GAGE

WATER FLOW SWITCH

HOT WATER

RETURN

FINISHED FLOOR

COLD WATER

ALTERNATESUPPLY COLD WATER

CONNECTION

EXPANSION TANK

NOTES:

1.Preferred piping diagram.

2.The temperature and pressure relief valve setting shall not exceed pressure rating of any component in the system.

3.Service valves are shown for servicing unit. However, local codes shall govern their usage.

4.The Tank Temperature Control should be wired to and control the pump between the water heater(s) and the storage tank(s).

5.The water heater’s operating thermostat should be set 5 degrees F higher than the Tank Temperature Control.

Image 39
Contents Commercial gas water heaters Table Of Contents Approvals Safe Installation, Use and ServiceFire and Explosion Hazard General Safety InformationPrecautions Grounding InstructionsHydrogen Gas Flammable Qualifications Qualified Installer or Service AgencyIntroduction Abbreviations UsedControls Features and ComponentsEliminator self-cleaning system Blower/Burner Assembly High Limit SwitchRecovery Capacities, based on 82% efficiency Installation considerationsRough In Dimensions Rough-In-DimensionsClearances Locating the Water HeaterCirculation Pumps NSF Leg KitInsulation Blanket Hard WaterBreathing Hazard Carbon Monoxide Gas High Altitude InstallationsInstallation Requirements Thermal Expansion Temperature-Pressure Relief ValveDishwashing Machines Closed Water SystemsCombustible Material Storage Contaminated AirValve Discharge Pipe Requirements Venting Air RequirementsUnconfined Space Confined SpaceOutdoor Air Through Two Horizontal Ducts Multiple Heater Manifold Outdoor Air Through One OpeningFresh Air Openings for Confined Spaces Outdoor Air Through Two OpeningsAir From Other Indoor Spaces Outdoor Air Through Two Vertical DuctsMultiple Gas Fired Tank-Type Heaters Type B GAS VentModel ABCL3 85T275 6NOX Water heater installation Water Line ConnectionsValve Discharge Pipe Tube Inlet Installation Installation Diagrams Top Inlet/Outlet UsageHeater Wiring Gas Meter Size Natural Gases Only Gas Line Leak TestingGas Piping PurgingStart up Prior to Start UpInitial Start Up Checking the Input Water Temperature AdjustmentMultiple Appliance Installations Checking VentingLighting & Operating Label Sequence of OperationYES Sequence of Operation Flow ChartIntake Air Screen MaintenanceTemperature-Pressure Relief Valve Test Venting SystemTo Flush the Water Heater Storage Tank Draining and FlushingDeliming Solvents To Drain the Water Heater Storage TankDeliming Using Flo-Jug Method Tank Cleanout ProcedureSystem Diagnostics Ignition Control SystemElectrical Servicing Operational Conditions High Water Temperature Shut OFF SystemFor Your Information Start Up ConditionsTroubleshooting Qualified Service AgencyComplaint Cause Remedy User Water Piping DiagramsTemperature & Pressure Temperature & Pressure Relief Valve Circulating Pump Multi Flue 2 Units Multi Flue 2 Units with Vertical Storage Tank Multi Flue 2 Units with Vertical Storage Tank Return from Multi Flue 2 Units TWO Temperature Multi Flue 2 Units with Booster TWO Temperature MULTI-FLUE 3 Units MULTI-FLUE 3 Units with Vertical Storage Tank MULTI-FLUE 3 Units with Horizontal Storage Tank Multi Flue Flue 4 Units MULTI-FLUE 4 Units with Vertical Storage Tank MULTI-FLUE 4 Units with Horizontal Storage Tank Model Dimension a Page Conditions and Exceptions Service and Repair ExpensesClaim Procedure ALL Other Parts