Honeywell DC2, DC6, DC3, DC4, DC5 Dimensional Drawing, Letters reference dimensional table on next

Page 30

13. Dimensional Drawing

Letters reference dimensional table on next page

26

Image 30 Contents
Installation, Operation Maintenance Instruction Models DC2, 3, 4, 5,Pulsafeeder Factory Service Policy Safety ConsiderationsTable of Contents 14.1 Introduction Principles Of OperationReagent Head Assembly Control AssemblyGear Ratio Assembly Storage InstallationEquipment Inspection LocationPiping System Suction Pressure Requirements Discharge Pressure RequirementsOutput Adjustment Equipment StartupFastener Inspection Priming the Reagent Head Process flowCalibration Sample flow calibration curveMaintenance LubricationWet End Removal, Inspection, & Reinstallation Wet end componentsDiaphragm Removal & Reinstallation Check Valves General DescriptionCheck valves, DC3 and DC Check Valve Removal & Reinstallation, Cartridge type DC5 and 6 check valves, metal construction Motor Removal & Reinstallation Gearset RemovalGearset components Gearset Replacement Replacement Parts KOPkit ProgramOrdering KOPkits or Parts KOPkit numbers by model Pump Model Wetted Material Connection Type KOPkit numberModel Number Identification NPT Wet End Materials Reference PvdfTroubleshooting Difficulty Probable Cause Remedy Pump does not startDifficulty Probable Cause Remedy Noisy gearing Piping Accessories Pressure Relief ValvesDimensional Drawing Letters reference dimensional table on nextDC5 PP/PVDF Parts Diagrams and Parts Lists Parts diagram, DC2Bill of Materials, DC2 Description QTY Part NumberName TAG Bill of Materials, DC3 4 7 0 0 4 1 S T L This page intentionally left Blank Parts Diagram, DC4, 5, Bill of Materials, DC4 DC4/5 Gearbox Bill of Materials, DC5 Tiebar Bill of Materials, DC6 DC4/5/6 Gearbox Page Standard Pump Operations