Bradley Smoker SS-3/AST/JUV, SS-3/AST/STD Rough, Installation Instructions continue

Page 5

 

Express® Lavatory System SS-Series

Installation Instructions - For Service Only

SS-3/AST/STD, SS-3/AST/JUV

 

 

Installation Instructions

Step 1: Rough in

Note: See Figure 1a below (for Standard Height) and Figure 1b on page 6 (for Juvenile Height) when roughing in the Express®.

IMPORTANT: Flush the supply lines before making connections. Debris in supply lines will cause the valves to malfunction.

IMPORTANT: Dimensions shown in Figure 1a are for Standard Height and in Figure 1b for Juvenile Height.

1.Rough in 1/2" NPT hot and cold supply lines through wall at dimensions shown.

2.Rough in 1-1/2" NPT drain waste connection through wall at dimensions shown.

3.Install (8) 3/8" wall anchors with a minimum pull-out rating of 1,000 lbs. (supplied by installer) at the locations shown in Figures 1a and 1b.

SS-3/AST/STD Express® Lavatory System (Standard Height)

(MM)

32"

(813)

28-5/8"

(727)

23-1/2"

(597)

11-3/8"

(289)

Figure 1a

38-1/2"

 

 

 

 

 

 

 

 

 

 

 

38-1/2"

(978)

 

 

 

 

 

 

 

 

 

 

 

(978)

 

 

 

24-3/8"

 

 

24-3/8"

 

 

 

 

 

 

 

 

 

 

 

 

 

 

(619)

 

 

(619)

 

 

 

 

 

 

 

 

 

 

 

 

 

4-3/8"

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

(111)

 

 

 

 

 

 

 

 

 

 

 

 

 

2-3/4"

17-7/16"

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

(70)

 

(443)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1-1/2" NPT DRAIN - STUB OUT 3-1/2" (89) FROM WALL

(8) 3/8" WALL

 

 

 

ANCHORS WITH

 

 

 

 

 

Finished

MINIMUM PULLOUT

 

 

Floor

RATING OF 1,000

 

 

 

 

 

 

LBS.

 

 

 

 

 

 

 

 

 

 

 

 

 

CENTERLINE

 

1/2" NPT HOT AND COLD SUPPLIES OR TEMPERED SUPPLY - STUB OUT 2" (50) FROM WALL

15-1/4"

(387)

Installation Instructions continue . . .

Bradley Corporation • 215-1238 Rev. C; EN 03-813

5/11/04

5

Image 5
Contents Standard and Juvenile Height Table of ContentsSupplies required for installation Pre-Installation InformationBarrier-free and ADA compliant standard height mounting Barrier-free and ADA compliant juvenile height mountingDimensions continue Juvenile Height Standard HeightInstallation Instructions continue Installation InstructionsSS-3/AST/STD Express Lavatory System Standard Height RoughSS-3/AST/JUV Express Lavatory System Juvenile Height Mounting frame to wall Do not overtighten Connecting supply Connecting plastic tubing Completing installation Terreon and panel maintenance Cleaning and Maintenance InstructionsCleaning Panel cleaningFill soap dispensers Soap Dispenser MaintenanceCleaning Instructions Check Valve TroubleshootingIf water just dribbles or does not flow from sprayhead If water sprayhead delivers all hot or cold waterOptional Stop/Strainer/Check Valve Assembly of ComponentsPaneling Drain Assembly Other Replacement PartsPushbutton assembly Metering Air Valve Troubleshooting Metering Air Valve MaintenanceMetering Air Valve Repair Kits and Parts List Problem Water is dripping from the streamformersProblem Valve will not turn on Problem Valve will not shut offProblem Timing can not be adjusted for more than 5 seconds Problem Pushbutton does not work properlyService Suggestions Vernatherm Mixing Valve Maintenance and ServiceMaintenance Instructions