Bradley Smoker SS-2/AST/JUV, SS-2/AST/STD installation instructions Mounting frame to wall

Page 7

 

Express® Lavatory System SS-Series

Installation Instructions - For Service Only

SS-2/AST/STD, SS-2/AST/JUV

 

 

Installation Instructions continued . . .

Step 2: Mounting frame to wall

1.Remove the eight Torx-head screws securing the panel to the frame, and remove the panel (see Figure 3).

Note: Scuff panel does not need to be removed.

2.Position the frame against the wall, ensuring that it is level. If necessary, insert shims under the frame until level.

Note: When mounted, the Standard and Juvenile Height frames should rest on the floor.

IMPORTANT: Anchoring the frame to a wall that is not flat may cause the frame to bend. If nec- essary, install shims to compen- sate for any wall distortion.

1-1/2" NPT DRAIN STUB-OUT

1/2" NPT HOT AND

COLD SUPPLIES OR TEMPERED SUPPLY STUB-OUTS

Figure 2

3.Ensure that the back of the frame is flat against the wall. If wall is not flat, insert shims behind the frame to ensure that it will not bend when anchored.

4.Once you have positioned the frame such that it is level and resting on the floor and flat against the wall or shimmed, use the 3/8" bolts and washers to mount the frame to the wall (see Figure 4).

 

 

FRAME

 

 

(4) 3/8" BOLT

FRAME

 

 

 

 

 

 

 

 

 

 

 

AND WASHER

 

 

 

 

 

 

 

 

PANEL

 

 

 

 

 

 

 

 

 

 

 

 

 

 

(8) TORX-HEAD

 

 

 

 

 

 

SCREW

 

 

 

 

 

 

 

 

 

SCUFF PANEL

(do not remove)

 

 

 

SCUFF PANEL

Figure 4

Figure 3

 

 

 

 

(do not remove)

 

 

 

 

 

Installation Instructions continue . . .

Bradley Corporation • 215-1244 Rev. C; EN 03-813

5/11/04

7

Image 7 Contents
Table of Contents For Service OnlyBarrier-free and ADA compliant juvenile height mounting Pre-Installation InformationSupplies required for installation Barrier-free and ADA compliant standard height mountingStandard Height Mounting SS-2/AST/STD Express Lavatory System DimensionsJuvenile Height SS-2/AST/JUV Standard HeightInstallation Instructions continue Installation InstructionsRough Juvenile Height Mounting SS-2/AST/JUV Express Lavatory System DimensionsMounting frame to wall Do not overtighten Connecting supply and drain Connecting plastic tubing Completing installation Panel cleaning Cleaning and Maintenance InstructionsTerreon and panel maintenance CleaningFill soap dispensers Soap Dispenser MaintenanceIf water sprayhead delivers all hot or cold water Check Valve TroubleshootingCleaning Instructions If water just dribbles or does not flow from sprayheadPaneling Assembly of ComponentsOptional Stop/Strainer/Check Valve Pushbutton assembly Other Replacement PartsProblem Water is dripping from the streamformers Metering Air Valve MaintenanceMetering Air Valve Troubleshooting Metering Air Valve Repair Kits and Parts ListProblem Pushbutton does not work properly Problem Valve will not shut offProblem Valve will not turn on Problem Timing can not be adjusted for more than 5 secondsMaintenance Instructions Vernatherm Mixing Valve Maintenance and ServiceService Suggestions